digilib@itb.ac.id +62 812 2508 8800
201
PERANCANGAN SISTEM PLAMBING GEDUNG KANTOR BANK NEGARA INDONESIA (BNI) DI JL. DR. CIPTO KOTA SEMARANG Tugas Akhir
Tiara Fahiramadyan ( NIM : 15713031)[]   Ir. James Nobelia Isnaniawardhana, MT.

202
PERANCANGAN INSTALASI PENGOLAHAN AIR LIMBAH DOMESTIK KOTA TEGAL, JAWA TENGAH Tugas Akhir
Saniar Rabithoh Wijaya ( NIM. 15713010)[]   Dr. Ing. Marisa Handajani, ST. MT.

203
010/1017/AB/2017 PERANCANGAN INSTALASI PENGOLAHAN AIR MINUM (IPAM) CIWULAN KOTA TASIKMALAYA, JAWA BARAT Tugas Akhir
Roidah Zihni Adzani ( NIM :15713007)[]   Dr. Ir Katharina Oginawati, MS

204
PERANCANGAN INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) KABUPATEN SUMEDANG Tugas Akhir
ROHMA TOEYIBA ( NIM : 15713005)[]   Ir. Agus Jatnika Effendi, Ph.D

205
PERANCANGAN SISTEM PLAMBING GEDUNG PUSAT PENELITIAN SAINS, ANTARIKSA, DAN KEBUMIAN, DI BOSSCHA, LEMBANG Tugas Akhir
Nadhira Khairunnisa - NIM. 15713018 []   Rofiq Iqbal, S.T., M.Eng., Ph.D.

206
PERANCANGAN SISTEM PLAMBING GEDUNG KANTOR SEWA DI KAWASAN KEMANG, JAKARTA Tugas Akhir
Muhammad Hafizh Khoeroni ( NIM : 15713033)[]   Haryo Satriyo Tomo, IPM

207
PERENCANAAN SISTEM PENGELOLAAN PERSAMPAHAN DI KAWASAN PARIWISATA Studi Kasus: Kecamatan Nusa Penida, Kabupaten Klungkung, Bali Tugas Akhir
Elprida Agustina (NIM: 15713027)[]   Dr. I Made Wahyu Widyarsana, ST. MT.

208
PERANCANGAN SISTEM PLAMBING GEDUNG KANTOR SEWA, JL.BURANGRANG, KOTA BANDUNG Tugas Akhir
Dilla Tarasyabani Poetri - NIM. 15713009 []   Haryo Satriyo Tomo, IPM

209
DETAIL DESAIN PENGEMBANGAN INSTALASI PENGOLAHAN AIR MINUM CISARUA, KABUPATEN BANDUNG BARAT, PERUSAHAAN DAERAH AIR MINUM TIRTA RAHARJA Tugas Akhir
Astri Diani Nur Muflihah ( NIM : 15713006 )[]   Ir. James Nobelia Isnania Wardhana, M.T

210
PERANCANGAN PENUTUPAN, REHABILITASI, DAN PASCAOPERASI TEMPAT PEMROSESAN AKHIR CILOWONG, KOTA SERANG, BANTEN Tugas Akhir
AFRIANA MAHARANI PUTERI[15713030]   Pembimbing : Dr. Benno Rahardyan, S.T., M.T.