digilib@itb.ac.id +62 812 2508 8800
1
DESAIN INSTALASI PENGOLAHAN AIR MINUM KAWASAN SUPERBLOCK NORTH CBD CAKUNG, CILINCING, JAKARTA UTARA Tugas Akhir
Krisna Ramita Sijabat[15313100]   Ir. Ahmad Soleh Setiyawan, S.T, M.T, Ph.D.;

2
ANALISIS DAMPAK PAJANAN PM2.5 TERHADAP KESEHATAN PEKERJA PANDAI BESI DI DESA MEKARMAJU, KECAMATAN PASIRJAMBU, KABUPATEN BANDUNG Tugas Akhir
Syarifah Faadiyah Maulida F[15318082]   Prof. Dr. Ir. Katharina Oginawati, M.S.;

3
PERANCANGAN INSTALASI PENGOLAHAN AIR (IPA) TOMO SPAM JATIGEDE DENGAN PENYISIHAN PADATAN TERSUSPENSI MENGGUNAKAN UNIT SEDIMENTASI Tugas Akhir
Prillya Agusti Christiany[15314036]   Prof. Ir. Mindriany Syafila, M.S, Ph.D.;


5
PENGOLAHAN AIR LIMBAH LAUNDRY RUMAHAN DI KOTA BANDUNG MENGGUNAKAN FILTRASI BIO-CHAR, BIO-SAND, DAN KOMBINASINYA Tugas Akhir
Evelyn Karina Putri Kurniawan[15320049]   Dr. Qomarudin Helmy, S.Si., M.T.;Dr. Muhammad Sonny Abfertiawan, S.T, M.T.;

6
POTENSI DAN JALUR TERJADINYA STUNTING: ANALISIS METODE GANDA TERHADAP DETERMINAN WASH DAN SOSIOEKONOMI DI JAKARTA PUSAT Tugas Akhir
Caitlyn C. S. Hutabarat[15321012]   Ir. Arief Sudradjat, S.T., MIS., Ph.D.;

7
KARAKTERISASI LOGAM BERAT DALAM FRAKSI RESPIRABLE PARTICULATES PADA SISWA SEKOLAH DASAR DI JAKARTA TIMUR Tugas Akhir
Naila Hasna Sasikirana[15321084]   Prof. Dr. Ir. Katharina Oginawati, M.S.;

8
ANALISIS PAJANAN PM2,5 TERHADAP SISWA SEKOLAH DASAR DI JAKARTA TIMUR Tugas Akhir
Madelaine Gloria Naarga[15321047]   Prof. Dr. Ir. Katharina Oginawati, M.S.;

9
ANALISIS PENGARUH FAKTOR INDIVIDU, BEBAN KERJA, DAN FAKTOR LINGKUNGAN FISIK TERHADAP KELELAHAN PEKERJA PERUSAHAAN FURNITUR PT X Tugas Akhir
Samuel H Aldo Sianipar[15320101]   Suharyanto, S.T, M.Sc., Ph.D.;Prof. Dr. Ir. Dwina Roosmini, M.S.;

10
PERANCANGAN SISTEM PENGELOLAAN SAMPAH KAWASAN WISATA PANTAI BATUKARAS, KABUPATEN PANGANDARAN Tugas Akhir
Ella Rosida Anggraini[15314038]   Dr. Benno Rahardyan, S.T., M.T.;


12
PEMODELAN SISTEM PENYEDIAAN AIR BERSIH DIINSTALASI PENGOLAHAN AIR DAGO PAKAR Tugas Akhir
Veri Goklas Silalahi[15319036]   Teddy Tedjakusuma, S.T, M.T, Ph.D.;

13
ANALISIS KONSENTRASI PM2.5 DI DALAM RUANG KELAS SEKOLAH DASAR DI JAKARTA TIMUR Tugas Akhir
Rafif Janitra Aryadito[15321010]   Prof. Dr. Ir. Katharina Oginawati, M.S.;

14
MICROPLASTIC REMOVAL FROM WATER USING FERROFLUID AND MAGNETS Tugas Akhir
Armando Sastra Raharja[15321008]   Prof. Emenda Sembiring, S.T., M.T., M.Eng.Sc., Ph.D.;


16
PROPOSED DESIGN SISTEM PENGENDALIAN PENCEMARAN UDARA UNTUK RAW MILL DI PABRIK TUBAN II PT SEMEN INDONESIA (PERSERO) TBK. Tugas Akhir
Pinandito Wisambudi[15314090]   Dr. Haryo Satriyo Tomo, S.T, M.T.;


18
KARAKTERISASI ANTIBIOTIC-RESISTANT ESCHERICIA COLI (AREC) DARI SEKTOR PETERNAKAN PADA AREA DAS CITARUM HULU Tugas Akhir
Fahira Rayhana Hasrul[15319117]   Prof. Dr. Herto Dwi Ariesyady, S.T., M.T.;

19
PERANCANGAN UNIT BIOPILE UNTUK MENGOLAH SLUDGE MINYAK BUMI PT. X BERBASIS UJI DEGRADASI SKALA LABORATORIUM Tugas Akhir
Jessica[15313015]   Prof. Edwan Kardena, Ph.D.;Drs. Dady Surachman, M.Si.;

20
PERANCANGAN UNIT LANDFARMING UNTUK MENGOLAH TANAH TERKONTAMINASI MINYAK BUMI PT X BERBASIS UJI DEGRADASI SKALA LABORATORIUM Tugas Akhir
Helena Clarinta Nugraheni[15313097]   Prof. Edwan Kardena, Ph.D.;Dr. Qomarudin Helmy, S.Si., M.T.;