digilib@itb.ac.id +62 812 2508 8800

2
OPTIMASI TRANSPORTASI DAN LOGISTIK PADA INSTALASI TURBIN ANGIN LEPAS PANTAI DENGAN PENDEKATAN STOKASTIK Tesis
Hasya Farhana[25524008]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Made Jaya Muliawan Ph.D;

3
ANALISIS PENGARUH BLOCKAGE TERHADAP KINERJA TURBIN ARUS PASANG SURUT SUMBU VERTIKAL TIGA BILAH DENGAN MODEL FISIK Tesis
Jesa Angelin[25524012]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Ahmad Safii Maarif, S.T., M.T.;

4
ANALISIS PENGARUH KURVATUR PENGHUBUNG LENGAN-BILAH TERHADAP KARAKTERISTIK MODEL TURBIN ARUS PASANG SURUT SUMBU VERTIKAL Tesis
Adinda Putri Kania Hermanto[25524007]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Ahmad Safii Ma'arif, S.T., M.T.;

5
INVESTIGASI NUMERIK 3D TERHADAP TRANSMISI GELOMBANG PADA STRUKTUR PEMECAH GELOMBANG AMBANG RENDAH DENGAN ARMOR PENTAPOD Tesis
Reynaldi Javier Purba[25522301]   Dr. Eng. Hendra Achiari, S.T, M.T.;Prof. Ir. Dantje Kardana Natakusumah, M.Sc., Ph.D.;

6
OPTIMISASI TRANSPORTASI DAN INSTALASI DALAM TAHAP INSTALASI TURBIN ANGIN LEPAS PANTAI DENGAN PENDEKATAN STOKASTIK Tesis
Reynard Alexander Zebua[25524013]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Made Jaya Muliawan Ph.D;

7
ANALISIS MANAJEMEN RISIKO PEKERJAAN INSTALASI METODE BAWAH AIR DAN DOCKING PADA STRUKTUR TERAPUNG Tesis
Kemal Hamdani[25523003]   Dr. Eng. Nita Yuanita, S.T, M.T.;Dr. Martinus Abednego;

8
COMPARATIV STUDY OF SPECTRAL AND DETERMINISTIC FATIGUE ANALYSIS FOR FIXED OFFSHORE STRUCTURE IN THREE DIFFERENT DYNAMIC CHARACTERISTICS Tesis
Alvin Reynaldi[25523006]   Prof. Ir. Ricky Lukman Tawekal, M.S.E, Ph.D.;Farid Putra Bakti, S.T., M.Sc., Ph.D.;



11
ANALISIS RISIKO PIPA BAWAH LAUT AKIBAT DROPPED ANCHOR, DRAGGED ANCHOR, DAN VESSEL SINKING DI SELAT MADURA Tesis
Amadea Atthariq Yunisa[25523004]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;Dr. Ir. Jessica Rikanti Tawekal, S.T, M.Sc.;

12
PEMODELAN FISIK KOMBINASI PEMECAH GELOMBANG TIANG BAMBU DAN BUDIDAYA KERANG HIJAU UNTUK EFEKTIFITAS SISTEM PELINDUNG PANTAI ALAMI Tesis
La Ode Faiz Bil Iman[25521011]   Dr. Eng. Nita Yuanita, S.T, M.T.;Ir. Alamsyah Kurniawan, S.T, Ph.D.;

13
STUDI KELAYAKAN DAN RENCANA MANAJEMEN PROYEK KOMBINASI PEMECAH GELOMBANG TIANG BAMBU DAN BUDIDAYA KERANG HIJAU Tesis
Ramadhani[25522004]   Dr. Eng. Nita Yuanita, S.T, M.T.;Ir. Alamsyah Kurniawan, S.T, Ph.D.;Martinus Abednego, D. Eng.;

14
TRANSMISI GELOMBANG PADA MODEL FISIK STRUKTUR BREAKWATER AMBANG RENDAH DENGAN ARTIFICIAL ARMOR Tesis
Walid Thohari[25520011]   Dr. Eng. Hendra Achiari, S.T, M.T.;


16
ANALISIS KERENTANAN PANTAI DENGAN METODE COASTAL VULNERABILITY INDEX (CVI) STUDI KASUS: SELAT SUNDA Tesis
Muhammad Bani Putra Utama[25521016]   Dr. Eng. Hendra Achiari, S.T, M.T.;

17
PEMETAAN POTENSI PEMBANGKIT LISTRIK TENAGA BAYU PANTAI DAN LEPAS PANTAI DI INDONESIA BERDASARKAN LEVELISED COST OF ELECTRICITY Tesis
Pebnaldy[25521302]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;



20
PEMODELAN NUMERIK PENGARUH ANGIN MONSUN TERHADAP POLA TRANSPOR SEDIMEN DI PEKALONGAN MANGROVE PARK PADA TAHUN 2021 - 2022 Tesis
Haekal Yusril Faizin[25520302]   Dr. Eng. Nita Yuanita, S.T, M.T.;Ir. Alamsyah Kurniawan, S.T, Ph.D.;