digilib@itb.ac.id +62 812 2508 8800

2
PERENCANAAN STRUKTUR RANGKA BAJA BERPENGAKU EKSENTRIK MENGGUNAKAN LINK GESER DAN LINK LENTUR Tugas Akhir
Yudhistira Widya Putra[15004106]   Ir. R. Muslinang Moestopo, M.S.EM, Ph.D.;


4
EVALUASI SEISMIK DAN PERENCANAAN RETROFIT JEMBATAN LAYANG EKSISTING MENGGUNAKAN LEAD RUBBER BEARING SEBAGAI SISTEM ISOLASI SEISMIK Tugas Akhir
Rizal Ahmad Prayoga[15020019]   Prof. Ir. Iswandi Imran, M.A.Sc., Ph.D.;

5
EVALUASI SEISMIK STRUKTUR RUSUN EKSISTING YANG DIRANCANG BERDASAR SNI 1726:2002 SESUAI ASCE 41-17 (RSNI XXXX:20XX) Tugas Akhir
Jessica Primauly[15020022]   Prof. Ir. Iswandi Imran, M.A.Sc., Ph.D.;

6
PERANCANGAN FONDASI PILE-RAFT RUMAH SUSUN 1 SEMPER (CAKUNG DRAIN), JAKARTA UTARA Tugas Akhir
Marcellinus Adiatma W[15020140]   Ir. Andhika Sahadewa, S.T, M.S.E, Ph.D.;



9
STUDI PARAMETRIK ANALISIS PERBAIKAN TANAH DENGAN METODE RIGID INCLUSION PADA PROYEK PEMBANGUN JALAN TOL SERANG-PANIMBANG Tugas Akhir
Faizal Gagad Nur Rahman[15020036]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;Yuamar Imarrazan Basarah, S.T., M.T., Ph.D.;

10
PERANCANGAN DINDING DIAFRAGMA DAN FONDASI BORED PILE PUSAT 2 PELAYANAN IBU DAN ANAK RUMAH SAKIT HASAN SADIKIN BANDUNG Tugas Akhir
Aditya Dwi Wirasena[15020006]   Ir. Erza Rismantojo, MSCE, Ph.D;Dayu Apoji, S.T, M.T, M.Sc.;

11
PERANCANGAN FONDASI TIANG BOR DAN TIMBUNAN OPRIT JEMBATAN PINOKALAN DI JALAN TOL MANADO BITUNG SEKSI 2B Tugas Akhir
Kelsen Fernandi[15020124]   Dr. Eng. Hasbullah Nawir, S.T, M.T.;Dayu Apoji, S.T, M.T, M.Sc.;

12
PERANCANGAN STRUKTUR ATAS PROYEK TERMINAL 3 BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI Tugas Akhir
Jason Julius[15020118]   Ir. Made Suarjana, M.Sc., Ph.D.;

13
PERANCANGAN PERBAIKAN TANAH DENGAN METODE DEEP SOIL MIXING PADA AREA PERIMETER ROCKBUN REKLAMASI KALIBARU Tugas Akhir
Zahra Farzadila[15020105]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;Dayu Apoji, S.T, M.T, M.Sc.;

14
PERILAKU PERGERAKAN BERBASIS TRANSIT PADA KAWASAN BERORIENTASI TRANSIT LEBAK BULUS Tugas Akhir
Firdaus Candra Andito[15020143]   Prof. Ir. Harun Al Rasyid, M.Sc., Ph.D.;


16
PERANCANGAN ASPEK MANAJEMEN DAN REKAYASA KONSTRUKSI PROYEK TERMINAL 3 BANDAR UDARA I GUSTI NGURAH RAI BALI Tugas Akhir
Steven Chandra[15020103]   Ir. Made Suarjana, M.Sc., Ph.D.;Budi Hasiholan, S.T., M.Eng., Ph.D.;

17
ANALISIS KINERJA LABORATORIUM CAMPURAN STONE MASTIC ASPHALT DENGAN ASBUTON MURNI YANG DIPADATKAN MENGGUNAKAN SUPERPAVE GYRATORY COMPACTOR Tugas Akhir
Chandrika Khumara Tungga Dewi[15020073]   Dr. Eri Susanto Hariyadi, S.T, M.T.;


19
STABILITAS DINDING PENAHAN TANAH STASIUN DAN ENTRANCE PADA PROYEK MRT JAKARTA FASE 2A CP-203 DENGAN PEMODELAN TIGA DIMENSI Tugas Akhir
Muhammad Reza Kamil[15020084]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;

20
STABILITAS DINDING PENAHAN TANAH STASIUN DAN ENTRANCE PADA PROYEK MRT JAKARTA FASE 2A CP-203 DENGAN PEMODELAN TIGA DIMENSI Tugas Akhir
Muhammad Reza Kamil[15020084]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;