1
EVALUASI PERBAIKAN TANAH MENGGUNAKAN METODE STONE COLUMN TERHADAP POTENSI LIKUIFAKSI DI PROYEK JALAN TOL TRANS JAWA STA 4+200-STA 4+405, DAERAH ISTIMEWA YOGYAKARTA Tugas Akhir
Hadin Harridhi Saiful[15022077]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
Hadin Harridhi Saiful[15022077]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
2
DESAIN STONE COLUMN SEBAGAI METODE PERBAIKAN TANAH DASAR TIMBUNAN JALAN TOL (STUDI KASUS: PROYEK JALAN TOL TRANS-JAWA, STA 4+800–5+115) Tugas Akhir
Muhammad Duta Pahlevi[15022019]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
Muhammad Duta Pahlevi[15022019]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
3
DESAIN STONE COLUMN SEBAGAI METODE PERBAIKAN TANAH DASAR TIMBUNAN JALAN TOL (STUDI KASUS: PROYEK JALAN TOL TRANS-JAWA, STA 4+800 – 5+115) Tugas Akhir
Muhammad Mufid Ramadhan[15022029]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
Muhammad Mufid Ramadhan[15022029]   Ir. Andhika Sahadewa, S.T., M.S.E., Ph.D.;
4
ANALISIS DAMPAK BANJIR TERHADAP JARINGAN JALAN DAN DISTRIBUSI BAHAN BAKAR MINYAK (STUDI KASUS: KABUPATEN ACEH UTARA) Tugas Akhir
Ahmad Raihan Adiwibowo[15022155]   Dr. Eng., Ir. Febri Zukhruf, S.T, M.T.;
Ahmad Raihan Adiwibowo[15022155]   Dr. Eng., Ir. Febri Zukhruf, S.T, M.T.;
5
PERANCANGAN JEMBATAN SEMI-INTEGRAL PRESTRESSED CONCRETE I GIRDER DAN EVALUASI KINERJA DENGAN PUSHOVER ANALYSIS Tugas Akhir
Muhammad Afiliandi Ulyansyah[15022125]   Prof. Dr. Ir. Herlien Dwiarti Soemari;
Muhammad Afiliandi Ulyansyah[15022125]   Prof. Dr. Ir. Herlien Dwiarti Soemari;
6
DESAIN FONDASI DINAMIK UNTUK MESIN FRESH-AIR FAN MENGGUNAKAN MODEL ELASTIC HALF SPACE Tugas Akhir
Kevin Gavryel Marcellino[15022116]   Sugeng Krisnanto, S.T, M.T, Ph.D.;
Kevin Gavryel Marcellino[15022116]   Sugeng Krisnanto, S.T, M.T, Ph.D.;
7
PERANCANGAN PEMBANGKIT LISTRIK TENAGA MIKROHIDRO CURUG CINULANG Tugas Akhir
Gerald T A Manurung[15020090]   Ir. Joko Nugroho, S.T., M.T., Ph.D.;
Gerald T A Manurung[15020090]   Ir. Joko Nugroho, S.T., M.T., Ph.D.;
8
PERANCANGAN ULANG FONDASI TIANG BOR DAN ANALISIS PERBANDINGAN BIAYA-WAKTU DENGAN JACK-IN PILE: STUDI KASUS PROYEK HUDSON SQUARE Tugas Akhir
Raditya Rafiansyah[15022120]   Dayu Apoji, S.T., M.T., M.Sc., Ph.D.
Raditya Rafiansyah[15022120]   Dayu Apoji, S.T., M.T., M.Sc., Ph.D.
9
ANALISIS FAKTOR PENGHAMBAT SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI GEDUNG (STUDI KASUS DI KONTRAKTOR SWASTA X) Tugas Akhir
Abimanyu Fathan Ashari[15022059]   Dr. Iris Mahani, S.T, M.T.;
Abimanyu Fathan Ashari[15022059]   Dr. Iris Mahani, S.T, M.T.;
10
DESAIN FONDASI TAHAN GEMPA DAN DINDING BASEMENT PROYEK GEDUNG PERKANTORAN ABC DI DKI JAKARTA Tugas Akhir
Matthew Ray Saroinsong[15022140]   Endra Susila, S.T., M.T., Ph.D.;
Matthew Ray Saroinsong[15022140]   Endra Susila, S.T., M.T., Ph.D.;
11
EVALUASI KINERJA LALU LINTAS SIMPANG BERSINYAL DI PERSIMPANGAN SOEKARNO HATTA - PASIR KOJA Tugas Akhir
Akhdan Haidar Maheswara[15021122]   Dr. Aine Kusumawati, S.T., M.T.;
Akhdan Haidar Maheswara[15021122]   Dr. Aine Kusumawati, S.T., M.T.;
12
ANALISIS UMUR LAYAN PERKERASAN JALAN DI AREA TANAH EKSPANSIF DENGAN METODE AASHTO 1993 DAN MDP 2024 (STUDI KASUS AKSES JALAN KAWASAN INDUSTRI KABUPATEN SUBANG) Tugas Akhir
Ris'ad Rizqi Ramadhan L.[15019087]   Ir. Nasuhi Zain, M.T.;
Ris'ad Rizqi Ramadhan L.[15019087]   Ir. Nasuhi Zain, M.T.;
13
PERENCANAAN METODE PELAKASANAAN KONSTRUKSI PROYEK PEMBANGUNAN GEDUNG LABORATORIUM TEKNIK 1B ITB JATINANGOR Tugas Akhir
Muhammad Sapto Nugroho[15012133]   Prof. Dr. Ir. Puti Farida Marzuki;
Muhammad Sapto Nugroho[15012133]   Prof. Dr. Ir. Puti Farida Marzuki;
14
PERANCANGAN PEMBANGKIT LISTRIK TENAGA MINIHIDRO PADA DESA CIHAWUK, KABUPATEN BANDUNG, DAERAH ALIRAN SUNGAI CITARUM HULU Tugas Akhir
Eric Pringga Adinegara[15021120]   Hadi Kardhana, S.T, M.T, Ph.D.;Faizal Immaddudin Wira Rohmat, S.T., M.T., Ph.D.;
Eric Pringga Adinegara[15021120]   Hadi Kardhana, S.T, M.T, Ph.D.;Faizal Immaddudin Wira Rohmat, S.T., M.T., Ph.D.;
15
PERANCANGAN GEDUNG RUMAH SAKIT SEMBILAN LANTAI DENGAN KETIDAK BERATURAN DI JAKARTA Tugas Akhir
Hilarius Bonatua Sitanggang[15021135]   Prof. Ir. R. Muslinang Moestopo, M.S.EM, Ph.D.;
Hilarius Bonatua Sitanggang[15021135]   Prof. Ir. R. Muslinang Moestopo, M.S.EM, Ph.D.;
16
EVALUASI DAN IDENTIFIKASI LANGKAH PENINGKATAN KINERJA LALU LINTAS KAWASAN SIMPANG PASTEUR KOTA BANDUNG Tugas Akhir
Raden Farhan Bara Herdiansah[15019133]   Dr. Russ Bona Frazila, S.T., M.T.;
Raden Farhan Bara Herdiansah[15019133]   Dr. Russ Bona Frazila, S.T., M.T.;
17
ANALISIS SALURAN DRAINASE UNTUK PENGENDALIAN BANJIR DI JALAN TOL JAKARTA-CIKAMPEK KM 13+400- KM 16+000 Tugas Akhir
Alisya Tria Ananda[15021121]   Mohammad Bagus Adityawan, S.T, M.T, Ph.D.;
Alisya Tria Ananda[15021121]   Mohammad Bagus Adityawan, S.T, M.T, Ph.D.;
18
DESAIN INTAKE DAN SALURAN PENGARAH UNTUK PEMBANGKIT LISTRIK TENAGA MINIHIDRO BENDUNGAN MBAY(LAMBO), KABUPATEN NAGEKEO PROVINSI NUSA TENGGARA TIMUR Tugas Akhir
Mohammad Alrijalu[15021042]   Dr. Ana Nurganah Chaidar, S.T, M.T.;
Mohammad Alrijalu[15021042]   Dr. Ana Nurganah Chaidar, S.T, M.T.;
19
PERANCANGAN SISTEM DRAINASE SEBAGAI UPAYA PENGENDALIAN BANJIR DI SUBSISTEM BANGER HULU, KOTA PEKALONGAN, PROVINSI JAWA TENGAH Tugas Akhir
Tesa Anggraeni[15021151]   Dr. Eng. Arno Adi Kuntoro, S.T, M.T.;
Tesa Anggraeni[15021151]   Dr. Eng. Arno Adi Kuntoro, S.T, M.T.;
20
PERANCANGAN SISTEM DRAINASE UNTUK PENGENDALIAN BANJIR DI SUBSISTEM BREMI, KOTA PEKALONGAN, PROVINSI JAWA TENGAH Tugas Akhir
Vallerie Maryam[15021145]   Dr. Eng. Arno Adi Kuntoro, S.T, M.T.;Widyaningtias, S.T., M.T., Ph.D.;
Vallerie Maryam[15021145]   Dr. Eng. Arno Adi Kuntoro, S.T, M.T.;Widyaningtias, S.T., M.T., Ph.D.;
Perpustakaan Digital ITB