digilib@itb.ac.id +62 812 2508 8800
241
Desain Penampang Kanal Inland Waterway Di Sungai Barito, Kalimantan Selatan Tugas Akhir
ABIBA NURJANAH (NIM: 15513031)[]   Pembimbing: Harman Ajiwibowo, Ph.D.

242
PERENCANAAN PELABUHAN KILANG MINYAK BUMI DI BANYUWANGI Tugas Akhir
MUHAMMAD MULYAWAN (NIM : 15503029); Pembimbing: Dr.Ir. Muslim Muin, MSOE.[]   Pembimbing: Dr.Ir. Muslim Muin, MSOE.

243
ANALISIS INPLACE, SEISMIK, FATIGUE DAN PLASTIC COLLAPSE PADA STRUKTUR ANJUNGAN LEPAS PANTAI TIPE JACKET 4 KAKI Tugas Akhir
FENTARIE GUMILANG (NIM 15504015); Pembimbing: Rildova, Ph.D.[]   Pembimbing: Rildova, Ph.D.

244
DESAIN DAN ANALISIS INSTALASI STRUKTUR PIPA BAWAH LAUT Tugas Akhir
FANTRI C. SIANTURI (NIM 15503013); Pembimbing: Ricky Lukman Tawekal, Ph.D.[]   Pembimbing: Ricky Lukman Tawekal, Ph.D.

245
DESAIN PENGAMANAN PANTAI MANOKWARI DAN PANTAI PULAU MANSINAM KABUPATEN MANOKWARI Tugas Akhir
TONI PEBRIANA (NIM 15504037); Pembimbing : Harman Ajiwibowo, Ph.D. []   Pembimbing : Harman Ajiwibowo, Ph.D.

246
UJI MODEL FISIK PEMECAH GELOMBANG TIPE TIANG PANCANG BERTIRAI Tugas Akhir
Rusli Zulfikar (NIM 155 05 017); Pembimbing : Harman Ajiwibowo, Ph.D.[]   Pembimbing : Harman Ajiwibowo, Ph.D.

247
STUDI PENERAPAN PEMECAH GELOMBANG TERAPUNG DI PERAIRAN TELUK BINTUNI Tugas Akhir
R. Ganendra Sudhira Wiriadinata (NIM 155 05 047)[]   Pembimbing : Andojo Wurjanto, Ph.D.

248
APLIKASI PERANGKAT LUNAK SIMULATING WAVES NEARSHORE (SWAN) DALAM PEMODELAN GELOMBANG ACAK DI MUARA SUNGAI BLANAKAN, KAB. SUBANG - JAWA BARAT Tugas Akhir
Mauludin Dwi Yoga Sutanto ([15505005]   Pembimbing: Hendra Achiari, Dr. Ir., MT.

249
KAJIAN MAKRO PENGEMBANGAN PELABUHAN PERIKANAN KARANGSONG Tugas Akhir
Ibnu Kusuma Wijaya (NIM 155 04 008) ; Pembimbing: Andojo Wurjanto, Ph.D.[]   Pembimbing : Andojo Wurjanto, Ph.D.

250
DESAIN STRUKTUR DERMAGA PIER PELABUHAN BALONGAN, PROPINSI JAWA BARAT Tugas Akhir
Fernandez Siregar (NIM 15505033) ; Pembimbing, Rildova, Ph.D.[]   Pembimbing: Rildova, Ph.D.

251
ANALISIS FLOATATION DAN UPENDING PADA STRUKTUR JACKET DI LAUT JAWA Tugas Akhir
Arif Setianto (NIM 155 05 031) ; Pembimbing: Rildova, Ph.D.[]   Pembimbing : Rildova, Ph.D.

252
PERHITUNGAN WORKABILITY PADA PROSES PIPELAYING Tugas Akhir
Vini Septiani Puspitasari (155 04 020)[]   Pembimbing: Nita Yanita, ST., MT.

253
ANALISIS FATIGUE PADA FREE SPAN PIPA BAWAH LAUT DI LAUT JAWA Tugas Akhir
Tunggul Bhirawa (NIM 15505051)[]   Pembimbing : Ricky Lukman Tawekal, Ph.D.

254
ANALISIS PUSHOVER STATIK PADA ANJUNGAN LEPAS PANTAI TIPE MONOPOD Tugas Akhir
Taufan Juliano Siregar (NIM 15504049)[]   Pembimbing : Rildova, Ph.D.

255
MODEL ARUS AKIBAT GELOMBANG Tugas Akhir
Retno Utami Agung Wiyono (NIM 155 05 028)[]   Pembimbing: Muslim Muin, Ph. D.

256
ANALISIS PUSHOVER PADA STRUKTUR JACKET 4 KAKI DENGAN MENGGUNAKAN PROGRAM USFOS Tugas Akhir
Muhammad Khalish (NIM 155 05 042)[]   #CONTRIBUTOR#

257
ANALISIS PUSHOVER PADA JACKET 4 KAKI Tugas Akhir
Javier Diwangkara (NIM 155 04 003)[]   Pembimbing: Rildova, Ph.D.

258
ANALISIS DINAMIK STRUKTUR JACKET EMPAT KAKI Tugas Akhir
Heri Setiawan (NIM 155 05 025)[]   Pembimbing: Rildova, Ph.D.

259
ANALISIS FATIGUE PADA RIGID RISER Tugas Akhir
Henry Wibowo (NIM 155 04 050)[]   Pembimbing: Ricky Lukman Tawekal, Ph.D.

260
ANALISIS NUMERIK ALIRAN AIR MELEWATI PIPA DI MUARA SUNGAI Tugas Akhir
Destry Marulitua Siagian (NIM 15505034)[]   Pembimbing : Hendra Achiari, Dr. Ir., MT.