digilib@itb.ac.id +62 812 2508 8800

2



5
PERANCANGAN INSTALASI PENGOLAHAN LINDI TPA TERJUN KOTA MEDAN Tugas Akhir
Pahala Wiranda H. Napitupulu[15717017]   Dr. Benno Rahardyan, S.T, M.T.;

6
REDESAIN INSTALASI PENGOLAHAN AIR (IPA) BEDOG PDAM TIRTAMARTA KOTA YOGYAKARTA Tugas Akhir
Falah Fathur Wijayanto[15719014]   Ir. James Nobelia Isnania Wardhana, M.T.;

7
PERENCANAAN SISTEM SANITASI LIMBAH CAIR DOMESTIK PASCA BENCANA GEMPA BUMI DESA WANGUNJAYA, KECAMATAN CUGENANG, KABUPATEN CIANJUR Tugas Akhir
Muhammad Faskal Ramadhan[15719040]   Prof. Dr. Ir. Dwina Roosmini, M.S.;Mayrina Firdayati, S.Si., M.T.;

8
PERENCANAAN PENGELOLAAN SAMPAH PUING BANGUNAN PASCA GEMPA BUMI DI KECAMATAN CUGENANG, KABUPATEN CIANJUR Tugas Akhir
Aurey Stevan Reynardo[15719015]   Dr. Benno Rahardyan, S.T, M.T.;

9
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) BAGENDUNG KOTA CILEGON Tugas Akhir
Tasyafa Azzahra Priputri[15719036]   Dr. Ir. I Made Wahyu Widyarsana, S.T., M.T.;

10
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DI KECAMATAN BATUJAJAR, KABUPATEN BANDUNG BARAT Tugas Akhir
Alif Dui Oktavianto[15719034]   Prof. Emenda Sembiring, S.T, M.T, M.Eng.Sc., Ph.D.;Dinda Annisa Nurdiani, S.T., M.T.;

11
PERANCANGAN PERALIHAN TEMPAT PENAMPUNGAN SEMENTARA (TPS) DERWATI MENJADI TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) KECAMATAN RANCASARI KOTA BANDUNG Tugas Akhir
Alya Milenia Rahma[15718001]   Prof. Emenda Sembiring, S.T, M.T, M.Eng.Sc., Ph.D.;

12
DESAIN ULANG SISTEM DRAINASE DI KELURAHAN ANTAPANI TENGAH, KECAMATAN ANTAPANI, KOTA BANDUNG Tugas Akhir
Zaky Ananditya Hilmi[15719030]   Teddy Tedjakusuma, S.T, M.T, Ph.D.;

13
PERENCANAAN SISTEM SEWERAGE KECAMATAN BENGKONG, KOTA BATAM Tugas Akhir
Haekal Muhammad Al Washy[15718035]   Ir. Ahmad Soleh Setiyawan, S.T, M.T, Ph.D.;

14
DESAIN INSTALASI PENGOLAHAN LINDI TPA TOISAPU, KOTA AMBON Tugas Akhir
Jakarawi Fachreza Marzuki[15717015]   Dr. Mochammad Chaerul, S.T, M.T.;

15
PERANCANGAN INSTALASI PENGOLAHAN AIR LIMBAH DOMESTIK KOTA BOGOR Tugas Akhir
Aristo Rizki Izzaturrahman[15719021]   Prof. Ir. Mindriany Syafila, M.S, Ph.D.;Dr. Qomarudin Helmy, S.Si., M.T.;

16
PENINGKATAN KAPASITAS INSTALASI PENGOLAHAN AIR TAMAN PUSPITA CITRA RAYA PERUMDAM TIRTA KERTA RAHARJA KABUPATEN TANGERANG Tugas Akhir
Cecilia Natasya Rachman[15719011]   Dr. Herto Dwi Ariesyady, S.T, M.T.;Dr. Mariana Marselina S., S.T, M.T.;

17
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DI KECAMATAN BEKASI UTARA, KOTA BEKASI Tugas Akhir
Ninne Sevtiana Dewi[15719033]   Prof. Emenda Sembiring, S.T, M.T, M.Eng.Sc., Ph.D.;

18
REDESAIN INSTALASI PENGOLAHAN AIR (IPA) DEKENG II, PDAM TIRTA PAKUAN KOTA BOGOR Tugas Akhir
Muhammad Fathan Lazuardi[15719020]   Prof. Edwan Kardena, Ph.D.;Dr. Qomarudin Helmy, S.Si., M.T.;

19
REDESAIN JARINGAN DISTRIBUSI AIR MINUM ZONA 5 KECAMATAN BOGOR SELATAN, PERUMDA AIR MINUM TIRTA PAKUAN KOTA BOGOR Tugas Akhir
Aulia Sakti Sihotang[15719041]   Ir. Yuniati, M.T, M.Sc., Ph.D.;

20
RE-DESAIN TEMPAT PENAMPUNGAN SEMENTARA (TPS) NYENGSERET MENJADI TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) NYENGSERET, KECAMATAN ASTANA ANYAR, KOTA BANDUNG Tugas Akhir
Ricky Maulana Hidayat[15719002]   Dr. Mochammad Chaerul, S.T, M.T.;Peni Astrini Notodarmojo, S.Si., M.Si., PhD;