DESAIN DAN ANALISIS ROAD CROSSING ONSHORE PIPELINE PADA FLOWLINE DI PAPUA BARAT Tugas Akhir
Rifqi Muhammad Faiq Fagmi[15516048]   Prof. Ir. Ricky Lukman Tawekal, MSE, Ph.D.;Jessica Rikanti Tawekal, S.T., M.Sc.;
Rifqi Muhammad Faiq Fagmi[15516048]   Prof. Ir. Ricky Lukman Tawekal, MSE, Ph.D.;Jessica Rikanti Tawekal, S.T., M.Sc.;
302
STUDI POTENSI DAN KELAYAKAN FINANSIAL TENAGA ARUS PASANG SURUT SEBAGAI ENERGI ALTERNATIF PEMBANGKIT LISTRIK DI SELAT CAPALULU, MALUKU UTARA Tugas Akhir
Muhammad Wahid Siddik[15515018]   Alamsyah Kurniawan, S.T., Ph.D.;
Muhammad Wahid Siddik[15515018]   Alamsyah Kurniawan, S.T., Ph.D.;
303
DESAIN DAN ANALISIS ROAD CROSSING PIPA PENYALUR ONSHORE UNTUK CAIRAN DAN GAS Tugas Akhir
Albert Kristian[15516045]   Ir. Rildova, M.T., Ph.D.;Jessica Rikanti Tawekal, S.T., M.Sc.;
Albert Kristian[15516045]   Ir. Rildova, M.T., Ph.D.;Jessica Rikanti Tawekal, S.T., M.Sc.;
304
PERENCANAAN STRUKTUR DERMAGA CAR TERMINAL TIPE DECK ON PILE DI PELABUHAN PATIMBAN, SUBANG, PROVINSI JAWA BARAT Tugas Akhir
Yola[15516023]   Ir. Sri Murti Adiyastuti, M.Sc., Ph.D.;
Yola[15516023]   Ir. Sri Murti Adiyastuti, M.Sc., Ph.D.;
305
PERANCANGAN ASPEK MANAJEMEN KONSTRUKSI BREAKWATER DAN DERMAGA TAHAP IB DI MAKASSAR NEW PORT Tugas Akhir
Michell Anindita Senaya[15516078]   Dr. Paramashanti, S.T., M.T.;
Michell Anindita Senaya[15516078]   Dr. Paramashanti, S.T., M.T.;
306
DESAIN DAN ANALISIS KEHANDALAN STRUKTUR BRACED MONOPOD DI LAUT NATUNA Tugas Akhir
Gary Prayogo[15516034]   Ir. Rildova, M.T., Ph.D.;
Gary Prayogo[15516034]   Ir. Rildova, M.T., Ph.D.;
307
PERANCANGAN STRUKTUR DERMAGA KARGO DENGAN TIPE DECK ON PILE DI PELABUHAN BENTENG SELAYAR, KABUPATEN KEPULAUAN SELAYAR, SULAWESI SELATAN Tugas Akhir
Vivie Herbenita[15516012]   Dr. Paramashanti, S.T., M.T.;
Vivie Herbenita[15516012]   Dr. Paramashanti, S.T., M.T.;
308
PERANCANGAN POLA OPERASI KENDARAAN TERMINAL INTERNASIONAL IPC CAR TERMINAL, TANJUNG PRIOK, JAKARTA Tugas Akhir
Zalza Puspita Arum[15516011]   Dr. Paramashanti, S.T., M.T.;
Zalza Puspita Arum[15516011]   Dr. Paramashanti, S.T., M.T.;
309
DESAIN STRUKTUR DERMAGA CURAH CAIR PADA TERMINAL BAHAN BAKAR MINYAK (TBBM) WAYAME, AMBON Tugas Akhir
Muhammad Ilham Dirgantara[15516079]   Ir. Rildova, M.T., Ph.D.;
Muhammad Ilham Dirgantara[15516079]   Ir. Rildova, M.T., Ph.D.;
310
PERANCANGAN STRUKTUR DECK ON PILE UNTUK APRON BARAT DI BANDAR UDARA INTERNASIONAL I GUSTI NGURAH RAI - BALI Tugas Akhir
Virty Nobelia Bestin Sucipto[15516032]   Ir. Rildova, M.T., Ph.D.;
Virty Nobelia Bestin Sucipto[15516032]   Ir. Rildova, M.T., Ph.D.;
311
DESAIN STRUKTUR LIQUID BERTH BERDASARKAN METODE PERANCANGAN BRITISH STANDARD PADA OSEIL FIELD DEVELOPMENT PROJECT MALUKU Tugas Akhir
Fauzi Septian Wijaya[15516040]   Ir. Sri Murti Adiyastuti, M.Sc., Ph.D.;
Fauzi Septian Wijaya[15516040]   Ir. Sri Murti Adiyastuti, M.Sc., Ph.D.;
312
PERENCANAAN UJI MODEL FISIK SISTEM PELINDUNG PANTAI NATURAL: STUDI KASUS PENGARUH KEMIRINGAN STRUKTUR GEOBAG TERHADAP TRANSMISI GELOMBANG PADA SISTEM PELINDUNG PANTAI NATURAL Tugas Akhir
Novianto Wono Saputra[15514079]   Dr.Eng. Nita Yuanita, S.T., M.T.;Alamsyah Kurniawan, S.T., Ph.D.;
Novianto Wono Saputra[15514079]   Dr.Eng. Nita Yuanita, S.T., M.T.;Alamsyah Kurniawan, S.T., Ph.D.;
313
PERENCANAAN STRUKTUR DERMAGA KAPAL PENUMPANG DI TULEHU, MALUKU Tugas Akhir
Muhammad Mujaddid[15513062]   Ir. Rildova, M.T., Ph.D.;
Muhammad Mujaddid[15513062]   Ir. Rildova, M.T., Ph.D.;
314
PERENCANAAN UJI MODEL FISIK SISTEM PELINDUNG PANTAI NATURAL: STUDI KASUS PENGARUH BERAT DAN KEMIRINGAN STRUKTUR GEOBAG TERHADAP TRANSMISI GELOMBANG PADA STRUKTUR GEOBAG Tugas Akhir
Muhammad Luqman Al Hakim[15514019]   Dr.Eng. Nita Yuanita, S.T., M.T.;Alamsyah Kurniawan, S.T., Ph.D.;
Muhammad Luqman Al Hakim[15514019]   Dr.Eng. Nita Yuanita, S.T., M.T.;Alamsyah Kurniawan, S.T., Ph.D.;
315
DESIGN OF FLOATING STRUCTURE TO SUPPORT A 500-KW PHOTOVOLTAIC SYSTEM IN BULELENG REGENCY, BALI PROVINCE, INDONESIA Tugas Akhir
Agil Pramudya Kaswiyanto[15515050]   Ir. Muslim, MSOE, Ph.D.;
Agil Pramudya Kaswiyanto[15515050]   Ir. Muslim, MSOE, Ph.D.;
316
PERANCANGAN STRUKTUR DERMAGA GENERAL CARGO PULAU BUNYU, BULUNGAN, KALIMANTAN UTARA Tugas Akhir
Hilmi Wirasatya[15515044]   Ir. Rildova, M.T., Ph.D.;
Hilmi Wirasatya[15515044]   Ir. Rildova, M.T., Ph.D.;
317
DESAIN AWAL PERLINDUNGAN TERHADAP TSUNAMI DI TELUK PALU, SULAWESI TENGAH Tugas Akhir
Aldino Dwi Anugerah[15515054]   Dr.Eng. Nita Yuanita, S.T., M.T.;
Aldino Dwi Anugerah[15515054]   Dr.Eng. Nita Yuanita, S.T., M.T.;
318
PEMODELAN DETEKSI BLACK BOX PESAWAT DENGAN METODE RAY TRACING DI PERAIRAN SELAT MAKASSAR Tugas Akhir
Honey Ruth Angie Manurung[15515034]   Ir. Entin Agustini Karjadi, MCE, Ph.D.;
Honey Ruth Angie Manurung[15515034]   Ir. Entin Agustini Karjadi, MCE, Ph.D.;
319
PERANCANGAN POLA OPERASI TERMINAL CURAH CAIR PADA REFINERY DEVELOPMENT MASTER PLAN (RDMP) KILANG MINYAK IV CILACAP, KABUPATEN CILACAP, PROVINSI JAWA TENGAH Tugas Akhir
Dwi Khoirin Nisa'[15515026]   Ir. Andojo Wurjanto, MCE, Ph.D.;
Dwi Khoirin Nisa'[15515026]   Ir. Andojo Wurjanto, MCE, Ph.D.;
320
ANALISIS PENGARUH STRUKTUR EKSISTING TERHADAP PERUBAHAN GARIS PANTAI SERTA PERENCANAAN BANGUNAN PENGAMAN PANTAI DI DESA RAWAURIP HINGGA GEBANG KULON, KABUPATEN CIREBON, JAWA BARAT Tugas Akhir
Syafik Adiar Muzaki[15515059]   Ir. Harman Ajiwibowo, MS, Ph.D.;