201
PERANCANGAN SENSOR TRANSIENT EARTH VOLTAGE UNTUK PENGUKURAN PARTIAL DISCHARGE Tesis
DEDI TRI LAKSONO [23216026]   Dr.Ir. Umar Khayam
DEDI TRI LAKSONO [23216026]   Dr.Ir. Umar Khayam
202
STUDI DAN DESAIN RANGKAIAN KONVERTER AC-DC FREKUENSI TINGGI PADA APLIKASI WIRELESS CHARGING MOBIL LISTRIK Tugas Akhir
DANANG CHOIRUL ABDILLAH - NIM. 18014036 []   Dr. Ir. Agus Purwadi, MT. Dr. Eng. Arwindra Rizqiawan, ST, MT.
DANANG CHOIRUL ABDILLAH - NIM. 18014036 []   Dr. Ir. Agus Purwadi, MT. Dr. Eng. Arwindra Rizqiawan, ST, MT.
203
ANALISIS ORGANIC RANKINE CYCLE PADA PEMBANGKIT LISTRIK BERBAHAN BAKAR SEKAM PADI Tugas Akhir
CARLOS DOMINGGO SIMANJUNTAK (NIM. 18014024)[]   Pembimbing : Dr. Ir. Bambang Anggoro Soedjarno. Burhanudding Halimi., Ph.D.
CARLOS DOMINGGO SIMANJUNTAK (NIM. 18014024)[]   Pembimbing : Dr. Ir. Bambang Anggoro Soedjarno. Burhanudding Halimi., Ph.D.
204
STUDI DAN DESAIN RANGKAIAN RESONAN MAGNETIK PADA APLIKASI WIRELESS POWER TRANSFER PENGISIAN BATERAI KENDARAAN LISTRIK MENGGUNAKAN FINITE ELEMENT METHOD Tugas Akhir
AYUDHIA PUSPITA POHAN - NIM. 18014014 []   Dr. Ir. Agus Purwadi, MT. Dr. Eng. Arwindra Rizqiawan, ST, MT.
AYUDHIA PUSPITA POHAN - NIM. 18014014 []   Dr. Ir. Agus Purwadi, MT. Dr. Eng. Arwindra Rizqiawan, ST, MT.
205
POLA OPERASI PEMBANGKIT LISTRIK TENAGA UAP DIAMATI DENGAN SOFTWARE EBSILON PROFESSIONAL (STUDI KASUS: UNIT 5 PLTU SURALAYA) Tugas Akhir
ARJUNA SARUMPAET - NIM: 18013013 []   Dr. Ir. Bambang Anggoro Burhanuddin Halimi, Ph.D
ARJUNA SARUMPAET - NIM: 18013013 []   Dr. Ir. Bambang Anggoro Burhanuddin Halimi, Ph.D
206
ANALISIS EKONOMI KELAYAKAN INVESTASI PLTS GRID-TIED DAN DAMPAK PENETRASI PLTS PADA JARINGAN TEGANGAN RENDAH DKI JAKARTA Tugas Akhir
ALEXANDER RUDOLF ARIBOWO (NIM. 18014029)[]   Pembimbing : Dr.Ir. Nanang Hariyanto, M.T.
ALEXANDER RUDOLF ARIBOWO (NIM. 18014029)[]   Pembimbing : Dr.Ir. Nanang Hariyanto, M.T.
207
SKEMA POLA OPERASI PEMBANGKIT LISTRIK HYBRID, PLTS-PLTD-BATERAI, DENGAN TINGKAT PENETRASI PLTS TINGGI, STUDI KASUS BIMA SAPE Tugas Akhir
AKBAR BAGASKARA (NIM. 18014034)[]   Pembimbing : Dr.Ir. Nanang Hariyanto, M.T.
AKBAR BAGASKARA (NIM. 18014034)[]   Pembimbing : Dr.Ir. Nanang Hariyanto, M.T.
208
STUDI DAN DESAIN SISTEM PEMBANGKIT LISTRIK HIBRIDA PV - TURBIN ANGIN - GENERATOR UNTUK BEBAN KOMUNAL 20 KWH DAN BEBAN ADMINISTRASI 11 KWH DI DESA SOTIMORI – NUSA TENGGARA TIMUR Tugas Akhir
AHMAD NAUFAL AFIF - NIM: 18014040 []   Dr. Ir. Agus Purwadi, M.T. Dr. Eng. Arwindra Rizqiawan, S.T, M.T.
AHMAD NAUFAL AFIF - NIM: 18014040 []   Dr. Ir. Agus Purwadi, M.T. Dr. Eng. Arwindra Rizqiawan, S.T, M.T.
209
SISTEM KOGENERASI FUEL CELL: ANALISIS SISTEM ABSORPTION CHILLER Tugas Akhir
ADHITYA RUSMAN (NIM. 18012012)[]   Pembimbing : Burhanuddin Halimi, Ph.D
ADHITYA RUSMAN (NIM. 18012012)[]   Pembimbing : Burhanuddin Halimi, Ph.D
210
STUDI PENGUJIAN EFEKTIVITAS AIR TERMINAL EARLY STREAMER EMISSION MENGGUNAKAN ROKET BERKAWAT Tugas Akhir
WAHYU IDRIS[]   Prof. Dr. Dipl. Ing. Ir. Reynaldo Zoro
WAHYU IDRIS[]   Prof. Dr. Dipl. Ing. Ir. Reynaldo Zoro
211
STUDI TAHANAN KONTAK PADA SAMBUNGAN BATERAI DENGAN PENGATURAN TEKANAN KONTAK SERTA KETEBALAN PELAPISAN PERAK, ZINC, DAN NIKEL PADA SAMBUNGAN Tugas Akhir
NELSON POETRA YOGA HADISOESENO (NIM. 18011018)[]   Pembimbing : Dr. Umar Khayam ST. MT
NELSON POETRA YOGA HADISOESENO (NIM. 18011018)[]   Pembimbing : Dr. Umar Khayam ST. MT
212
STUDI PERANCANGAN DAN DAMPAK PENETRASI PLTS 100MW TERPUSAT PADA SISTEM KALIMANTAN SELATAN-TENGAH 150KV TAHUN 2018 Tugas Akhir
IMAM PUTRANTO - (18011057)[]   Dr. Ir. Nanang Hariyanto
IMAM PUTRANTO - (18011057)[]   Dr. Ir. Nanang Hariyanto
213
ANALISIS PENGUATAN TEGANGAN DAN RIAK ARUS MASUKAN PADA KONVERTER DC-DC BOOST PENGUATAN TINGGI RIAK NOL (DAHONO-5) Tugas Akhir
HAIDAR MUTTAQIN[]   Dr. Ir. Pekik Argo Dahono Burhanuddin Halimi, Ph. D
HAIDAR MUTTAQIN[]   Dr. Ir. Pekik Argo Dahono Burhanuddin Halimi, Ph. D
214
STUDI SISTEM PROTEKSI PETIR PADA SALURAN UDARA TEGANGAN EKSTRA TINGGI 275 KV DI DAERAH TROPIS Tesis
FRI MURDIYA[23206015]   Pembimbing: Dr. Dipl.Ing. Ir. Reynaldo Zoro
FRI MURDIYA[23206015]   Pembimbing: Dr. Dipl.Ing. Ir. Reynaldo Zoro
215
EKSTRAKSI INFORMASI BEBAN PANGGILAN UNTUK PELANGGAN S.T.D.I. Tesis
SOFYAN ACHMAD B.[23291047]   Pembimbing: Ketut Karsa Scaner: Irwan S.
SOFYAN ACHMAD B.[23291047]   Pembimbing: Ketut Karsa Scaner: Irwan S.
216
PENEMPATAN SUMBER DATA REAKTIF MENGGUNAKAN ANALISIS MODAL UNTUK MEMPERBAIKI STABILITAS TEGANGAN SISTEM TENAGA LISTRIK Tesis
ST GODION KAUNANG[23296502]   Pembimbing : Muhammad Nurdin ; Scanner: Irwan Sofiyan
ST GODION KAUNANG[23296502]   Pembimbing : Muhammad Nurdin ; Scanner: Irwan Sofiyan
217
OPTIMASI PENENTUAN LOKASI PENSTABIL SISTEM TENAGA DENGAN METODA STRUKTUR EIGEN PARSIAL DAN KONTROL DESENTRALISASI Tesis
JOHN HARRIS P.H[23293004]   Pembimbing I : Parouli M. Pakpahan Pembimbing II : Isnuwardianto
JOHN HARRIS P.H[23293004]   Pembimbing I : Parouli M. Pakpahan Pembimbing II : Isnuwardianto
218
STUDI KOMPONEN YANG DIPEROLEH SECARA LOKAL UNTUK SISTEM KOMUNIKASI SERAT OPTIK DI INDONESIA Tesis
Abdul Aziz[23292033]   Andrianto Handojo
Abdul Aziz[23292033]   Andrianto Handojo
219
EFEK TEGANGAN TINGGI PADA KABEL SERAT OPTIK Tesis
Soedibjo Setijoboedi[23291048]   Pembimbing : Andrianto Handojo
Soedibjo Setijoboedi[23291048]   Pembimbing : Andrianto Handojo
220
ANALISIS KINERJA WAVELENGTH DIVISION MULTIPLEXING (WDM) PADA KOMUNIKASI SERAT OPTIK Tesis
Halim Sulasmono[23291075]   Pembimbing : Andrianto Handojo
Halim Sulasmono[23291075]   Pembimbing : Andrianto Handojo