1
ANALISIS KINERJA HIDRODINAMIKA STRUKTUR PENTACONE UNTUK MEMPREDIKSI NILAI RUN-UP GELOMBANG DAN TURBULENSI ENERGI KINETIK MENGHADAPI VARIASI SKENARIO GELOMBANG: PENDEKATAN SIMULASI FLOW-3D Tugas Akhir
Audric Samuel Wijaya Manik[15522062]   Dr. Eng. Hendra Achiari, S.T, M.T.;
Audric Samuel Wijaya Manik[15522062]   Dr. Eng. Hendra Achiari, S.T, M.T.;
2
STRUCTURAL RESPONSE ANALYSIS OF A JACK-UP RIG DUE TO PUNCH-THROUGH FAILURE IN THE GULF OF MEXICO Tugas Akhir
Azmii Amrulloh Musopi[15522021]   Farid Putra Bakti, S.T., M.Sc., Ph.D.;Ir. Lurohman Mamin Masturi, S.T, M.Sc.;
Azmii Amrulloh Musopi[15522021]   Farid Putra Bakti, S.T., M.Sc., Ph.D.;Ir. Lurohman Mamin Masturi, S.T, M.Sc.;
3
PERANCANGAN STRUKTUR BREAKWATER DI PELABUHAN TAMPERAN, PACITAN Tugas Akhir
Andiani Niras Baran[15522015]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
Andiani Niras Baran[15522015]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
4
EVALUASI EFEKTIVITAS STRUKTUR PENGAMAN PANTAI DALAM MITIGASI TSUNAMI DI TELUK PALU DENGAN PEMODELAN NUMERIK Tugas Akhir
Najwa Meki Aulia[15522008]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;Ir. Rizky Anugerah Satria, S.T., M.T., IPM;
Najwa Meki Aulia[15522008]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;Ir. Rizky Anugerah Satria, S.T., M.T., IPM;
5
PERANCANGAN STRUKTUR PEMECAH GELOMBANG PADA PENGEMBANGAN KOLAM D PELABUHAN PERIKANAN SAMUDERA CILACAP Tugas Akhir
Fina Rahmawati Fadhilla[15522046]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
Fina Rahmawati Fadhilla[15522046]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
6
ANALISIS GAYA UJUNG DAN DEFLEKSI STRUKTUR PADA CONTOH KASUS STRUKTUR DOLPHIN TUBULAR MENGGUNAKAN METODE KEKAKUAN LANGSUNG BERBASIS MATLAB Tugas Akhir
Harry Maulana Hafidz[15522068]   Prof. Ir. Rildova, M.T., Ph.D.;Eddy Rachman Gandanegara, S.T, M.T.;
Harry Maulana Hafidz[15522068]   Prof. Ir. Rildova, M.T., Ph.D.;Eddy Rachman Gandanegara, S.T, M.T.;
7
DESAIN LAYOUT BERDASARKAN PIANC DAN PEKERJAAN PENGERUKAN ALUR PELAYARAN DAN KOLAM PUTAR CRUISE TERMINAL PELABUHAN BENOA Tugas Akhir
Eduardo Sebastian[15522063]   Eddy Rachman Gandanegara, S.T, M.T.;
Eduardo Sebastian[15522063]   Eddy Rachman Gandanegara, S.T, M.T.;
8
INTEGRATED HYDRODYNAMIC AND THERMAL MODELING TO ANALYZE THE INFLUENCE OF JETTY STRUCTURES AND POWER PLANT DISCHARGE AT THE JAVA 7 COAL-FIRED POWER PLANT, SERANG, BANTEN, INDONESIA Tugas Akhir
Aurelya Betha Sonia[15522018]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
Aurelya Betha Sonia[15522018]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
9
INTEGRITY ANALYSIS OF SUBSEA PIPELINES WITH CRACKS USING THE EXTENDED ELEMENT METHOD (XFEM) Tugas Akhir
Wiwin Aprianti[15519033]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
Wiwin Aprianti[15519033]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
10
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA TERAPUNG DI AREA PELABUHAN Tugas Akhir
Rafi Valencio Rahman[15521023]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
Rafi Valencio Rahman[15521023]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
11
DESAIN KONFIGURASI MOORING UNTUK SISTEM BONGKAR MUAT CURAH CAIR MENGGUNAKAN SINGLE POINT MOORING (SPM) TIPE CALM BUOY Tugas Akhir
Nara Abisha Raodan[15521040]   Prof. Ir. Rildova, M.T., Ph.D.;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
Nara Abisha Raodan[15521040]   Prof. Ir. Rildova, M.T., Ph.D.;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
12
DESAIN DAN ANALISIS TEKUK LATERAL PIPA BAWAH LAUT DI LAUT UTARA JAWA Tugas Akhir
Hafiz Akbar Kusviawan[15521002]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
Hafiz Akbar Kusviawan[15521002]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
13
DESAIN DAN STUDI PENGARUH UPWARD BENDING TERHADAP KARAKTERISTIK ALIRAN DAN WALL SHEAR STRESS PIPA BAWAH LAUT MENGGUNAKAN COMPUTATIONAL FLUID DYNAMIC DI LAUT UTARA JAWA Tugas Akhir
Achmad Akbar Ferdinand Putra[15521041]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
Achmad Akbar Ferdinand Putra[15521041]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
14
DESAIN DAN ANALISIS PERILAKU PIPA BAWAH LAUT AKIBAT BEBAN IMPAK DARI OBJEK JATUH DENGAN METODE ELEMEN HINGGA Tugas Akhir
Dimas Radithya Faturahman[15521037]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
Dimas Radithya Faturahman[15521037]   Ir. Eko Charnius Ilman, S.T., M.T., Ph.D., IPM;
15
ANALISIS INSTALASI DAN BENTANG BEBAS PIPA BAWAH LAUT PADA PROYEK AR DI PERAIRAN LAUT UTARA JAWA Tugas Akhir
Alvin Reynaldi[15521013]   Dr. Ir. Jessica Rikanti Tawekal, S.T, M.Sc.;
Alvin Reynaldi[15521013]   Dr. Ir. Jessica Rikanti Tawekal, S.T, M.Sc.;
16
DESAIN LAYOUT DAN PEKERJAAN PENGERUKAN ALUR PELAYARAN DAN KOLAM PELABUHAN DERMAGA III PELABUHAN BIRINGKASSI PT. SEMEN TONASA Tugas Akhir
Fitri Nur Azizah[15520012]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
Fitri Nur Azizah[15520012]   Ir. Alamsyah Kurniawan, S.T, Ph.D.;
17
DESIGN OF FLOATING NET CAGES WITH LOBSTER HOUSE TECHNOLOGY BASED ON FLUID STRUCTURE INTERACTION ANALYSIS Tugas Akhir
Steven[15521051]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
Steven[15521051]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
18
DESAIN LIFTING DAN LOWERING LAYOUT, KONFIGURASI MOORING DAN ANALISIS MOORING PADA HEAVY LIFT VESSEL UNTUK INSTALASI OFFSHORE WIND TURBINE Tugas Akhir
Fatah Falah Muhammad[15521008]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
Fatah Falah Muhammad[15521008]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
19
DETERMINATION OF HYDRODYNAMIC PARAMETERS OF OFFSHORE FLOATING SOLAR POWER PLANTS USING THE DMB NUMERICAL MODEL AND LABORATORY TEST RESULTS Tugas Akhir
Audric Hubert, Lie[15521014]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
Audric Hubert, Lie[15521014]   Ir. Ahmad Mukhlis Firdaus, S.T, M.T., DPhil;Farid Putra Bakti, S.T., M.Sc., Ph.D.;
20
DESAIN LAYOUT DAN PEKERJAAN PENGERUKAN ALUR PELAYARAN DAN KOLAM PUTAR PELABUHAN TELUK BARA, BURU, MALUKU Tugas Akhir
Ahmad Abid. M[15521038]   Prof. Ir. Harman Ajiwibowo, M.S., Ph.D.;
Ahmad Abid. M[15521038]   Prof. Ir. Harman Ajiwibowo, M.S., Ph.D.;
Perpustakaan Digital ITB