1
KAJIAN TRANSPORTATION WASTE PADA KONTRAKTOR KECIL Tesis
Hudan Linas[25024029]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;Budi Hasiholan, S.T., M.Eng., Ph.D.;
Hudan Linas[25024029]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;Budi Hasiholan, S.T., M.Eng., Ph.D.;
2
ANALISIS KRITERIA DAN SUBKRITERIA PEMILIHAN SUBKONTRAKTOR STUDI KASUS: PT HUTAMA KARYA (PERSERO) Tesis
Ridhwan Falih Naufali[25024118]   Dr. Iris Mahani, S.T, M.T.;
Ridhwan Falih Naufali[25024118]   Dr. Iris Mahani, S.T, M.T.;
3
OPTIMASI BERAT SISTEM STRUKTUR BAJA ECCENTRICALLY BRACED FRAME (EBF) DENGAN LINK PENDEK UNTUK BANGUNAN MID-RISE DAN HIGH-RISE MENGGUNAKAN METODE ALGORITMA GENETIKA Tesis
Aesha Reska Sahira[25023018]   Ir. Patria Kusumaningrum, S.T., Ph.D.;
Aesha Reska Sahira[25023018]   Ir. Patria Kusumaningrum, S.T., Ph.D.;
4
PENGEMBANGAN SISTEM SIMULASI BERBASIS PYTHON UNTUK OPTIMASI KOMBINASI PANJANG POTONGAN BILLET DALAM MEMINIMALKAN WASTE MATERIAL DI PT BHIRAWA STEEL. Tesis
Nur Aeni Erma Syaroh[25024113]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
Nur Aeni Erma Syaroh[25024113]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
5
KLASIFIKASI TINGKAT KINERJA STRUKTUR BETON BERTULANG DAN BATA TERKEKANG MENGGUNAKAN NEURAL NETWORK DAN ENSEMBLE LEARNING Tesis
Darren Nathaniel[25025063]   Dr.-Ing. Ir. Ediansjah Zulkifli, S.T., M.T.;
Darren Nathaniel[25025063]   Dr.-Ing. Ir. Ediansjah Zulkifli, S.T., M.T.;
6
EVALUASI NOMINAL BEBAN TRUK â€T†SNI 1725:2016 BERDASARKAN ANALISIS FATIK UNTUK RANCANGAN JEMBATAN STANDAR RANGKA BAJA PERMANEN A-80 MENGGUNAKAN DATA WEIGH-IN-MOTION (WIM) Tesis
Muhammad Fahrulloh[25024100]   Ir. Dyah Kusumastuti, S.T., M.T., Ph.D.;
Muhammad Fahrulloh[25024100]   Ir. Dyah Kusumastuti, S.T., M.T., Ph.D.;
7
ANALISIS KINERJA STRUKTUR RANGKA BAJA DENGAN SAMBUNGAN SEMI-RIGID TERHADAP BEBAN SEISMIK Tesis
Bernard[25023029]   Ir. Dyah Kusumastuti, S.T., M.T., Ph.D.;
Bernard[25023029]   Ir. Dyah Kusumastuti, S.T., M.T., Ph.D.;
8
POTENSI INTEGRASI BIM DAN GIS DENGAN SKEMA CONDITION-BASED MAINTENANCE PADA JEMBATAN JALAN TOL Tesis
Petra Hizkia Hendrajaya[25025045]   Dr. Ir. Ima Fatima, M.Eng.;
Petra Hizkia Hendrajaya[25025045]   Dr. Ir. Ima Fatima, M.Eng.;
9
MODEL ESTIMASI BIAYA PROVISI OVERLAY PEMELIHARAAN JALAN TOL BERBASIS DATA HISTORIS DAN PREDIKSI KEBUTUHAN MASA DEPAN STUDI KASUS : RUAS TOL PEKANBARU - DUMAI Tesis
Fabiant Adi Wibowo[25024111]   Dr. Ir. Ima Fatima, M.Eng.;
Fabiant Adi Wibowo[25024111]   Dr. Ir. Ima Fatima, M.Eng.;
10
EVALUASI KINERJA DAMP PROOF COURSE DAN FIBER-REINFORCED PAINT DALAM MENGENDALIKAN KERUSAKAN STRUKTUR BANGUNAN AKIBAT KELEMBABAN DAN BEBAN SEISMIK Tesis
Efandi Nehe [25024028]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
Efandi Nehe [25024028]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
11
ANALISIS EFEKTIVITAS PENERAPAN TERRESTRIAL LASER SCANNING (TLS) UNTUK PERHITUNGAN VOLUME STRUKTUR JEMBATAN OVERPASS STA 62 PROYEK JALAN TOL RUAS BETUNG–TEMPINO–JAMBI SEKSI 2A Tesis
Dwi Fadhil Yanto[25024109]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
Dwi Fadhil Yanto[25024109]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
12
STUDI EKSPERIMENTAL PENGARUH AKUMULASI SAMPAH TERENDAM TERHADAP KAPASITAS ALIRAN DAN KOEFISIEN KEKASARAN MANNING PADA SALURAN TERBUKA. Tesis
Muhammad Rendy[25024027]   Hadi Kardhana, S.T, M.T, Ph.D.;
Muhammad Rendy[25024027]   Hadi Kardhana, S.T, M.T, Ph.D.;
13
KERANGKA PENILAIAN RESLIENSI INFRASTRUKTUR JALAN TOL TERHADAP BENCANA BANJIR(STUDI KASUS: PROYEK JALAN TOL SERANG – PANIMBANG) Tesis
Febrianto Parulian Situmorang[25024112]   Prof. Reini Wirahadikusumah, Ph.D.;
Febrianto Parulian Situmorang[25024112]   Prof. Reini Wirahadikusumah, Ph.D.;
14
OPTIMASI MULTIOBJEKTIF KOLOM STEEL REINFORCED CONCRETE (SRC) PADA PORTAL 2D SISTEM RANGKA PEMIKUL MOMEN KHUSUS UNTUK MINIMASI BIAYA MATERIAL DAN EMBODIED CARBON MENGGUNAKAN ALGORITMA NSGA-II Tesis
Fernando Lee[25025058]   Prof. Ir. Made Suarjana, M.Sc., Ph.D.;
Fernando Lee[25025058]   Prof. Ir. Made Suarjana, M.Sc., Ph.D.;
15
PREDIKSI KURVA KERENTANAN UNTUK STRUKTUR CONFINED MASONRY MENGGUNAKAN GAUSSIAN PROCESS REGRESSION Tesis
Aditya Setiawanda[25024003]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
Aditya Setiawanda[25024003]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
16
PREDIKSI KURVA KERENTANAN UNTUK STRUKTUR CONFINED MASONRY MENGGUNAKAN GAUSSIAN PROCESS REGRESSION Tesis
Aditya Setiawanda[25024003]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
Aditya Setiawanda[25024003]   Ir. Prasanti Widyasih Sarli, S.T., M.T., Ph.D.;
17
ANALISIS HUBUNGAN ANTARA PRODUKTIVITAS DAN WASTE PADA PEKERJAAN RIGID PAVEMENT (STUDI KASUS : JALAN TOL TRANS SUMATERA SEKSI JUNCTION PEKANBARU - BYPASS PEKANBARU) Tesis
Infan Mixtio Indrawan[25024107]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
Infan Mixtio Indrawan[25024107]   Prof. Ir. Muhamad Abduh, M.T., Ph.D.;
18
ANALISIS DAMPAK PEMBANGUNAN DAN PENGOPERASIAN JUNCTION PALEMBANG TERHADAP KELAYAKAN INVESTASI JALAN TOL PALEMBANG – INDRALAYA Tesis
Narko Kurniawan[25024115]   Dr. Iris Mahani, S.T, M.T.;
Narko Kurniawan[25024115]   Dr. Iris Mahani, S.T, M.T.;
19
EVALUASI KINERJA DAN REHABILITASI SEISMIK PADA BANGUNAN RANGKA BETON BERTULANG YANG DIDESAIN MENGGUNAKAN PMI 1970 DAN PBI 1971 Tesis
Fredrikus Lay Berkh Mans[25023105]   Prof. Ir. Iswandi Imran, M.A.Sc., Ph.D.;
Fredrikus Lay Berkh Mans[25023105]   Prof. Ir. Iswandi Imran, M.A.Sc., Ph.D.;
20
ANALISIS FAKTOR-FAKTOR PENGAMBILAN KEPUTUSAN PENGGUNA JASA DALAM SERAH TERIMA SEBAGIAN PEKERJAAN (SERAH TERIMA PARSIAL) PADA PROYEK STRATEGIS NASIONAL JALAN TOL TRANS SUMATERA Tesis
Ewith Riska Rahma[25024114]   Rani Gayatri Kusumawardhani P., S.T, M.Sc., Ph.D.;
Ewith Riska Rahma[25024114]   Rani Gayatri Kusumawardhani P., S.T, M.Sc., Ph.D.;
Perpustakaan Digital ITB