MANAJEMEN RISIKO KESELAMATAN KONSTRUKSI PEKERJAAN DI ATAS REL KERETA AKTIF (STUDI KASUS: PROYEK KERETA CEPAT JAKARTA BANDUNG DK113) Tesis
Rezki Hartomo[25020071]   Dr. Iris Mahani, S.T, M.T.;Eliza Rosmaya Puri, S.T, M.T, Ph.D.;

4
EVALUASI KINERJA PELAYANAN BUS RAPID TRANSIT (BRT) TRANS JOGJA BERDASARKAN KEPUASAN PENGGUNA (STUDI KASUS: JALUR 7 GIWANGAN - BABARSARI). Tesis
Kirfan Stevanly Bleskadit[25020007]   Prof. Ir. Ade Sjafruddin, M.Sc., Ph.D.;Dr. Eri Susanto Hariyadi, S.T, M.T.;


6
KAJIAN PENGARUH TIPE BREAKWATER PADA POLA ARUS DAN GELOMBANG (STUDI KASUS: MUARA SUNGAI PLUMBON, JAWA TENGAH) Tesis
Iqbal Faruq[25020014]   Prof. Ir. Muhammad Syahril Badri Kusuma, Ph.D.;Dhemi Harlan, Ph.D.;

7
PENGARUH ANGKUTAN BARANG LUAR KOTA TERHADAP KINERJA JARINGAN JALAN KOTA BANDUNG Tesis
Raka Surya Pradana[25020059]   Prof. Ir. Ade Sjafruddin, M.Sc., Ph.D.;Dr. Eng., Ir. Febri Zukhruf, S.T, M.T.;

8
ANALISIS EFEKTIVITAS PAGAR KESELAMATAN JALAN TOL TERHADAP TINGKAT KEPARAHAN TABRAKAN (STUDI KASUS: TOL TRANS JAWA) Tesis
Hana Hashina[25020039]   Prof. Ir. Ade Sjafruddin, M.Sc., Ph.D.;Dr. Aine Kusumawati, S.T, M.T.;

9
ANALISIS DAMPAK LALU LINTAS PEMBUKAAN JALAN TOL PADA JARINGAN JALAN PERKOTAAN (STUDI KASUS : GERBANG TOL GEDEBAGE KM 149 TOL PADALARANG - CILEUNYI) Tesis
Ibnu Syawal Kamil[25020020]   Prof. Ir. Rudy Hermawan Karsaman, M.Sc., Ph.D.;Dr. Russ Bona Frazila, S.T, M.T.;

10
KAJIAN KINERJA OTOMASI SISTEM MONITORING ASPHALT MIXING PLANT (STUDI KASUS: LIVE AMP SYSTEM DI PT. HAKAASTON) Tesis
Firman Aditya Putra[25022104]   Rani Gayatri Kusumawardhani P., S.T, M.Sc., Ph.D.;Eliza Rosmaya Puri, S.T, M.T, Ph.D.;


12
EVALUASI FAKTOR PENENTU KEBERHASILAN PEMANFAATAN ERP (ENTERPRISE RESOURCE PLANNING) UNTUK MENDUKUNG PENINGKATAN KINERJA KEUANGAN PT. HKI Tesis
Razez Nugraha Erson[25022103]   Prof. Ir. Biemo Woerjanto Soemardi, M.S.E, Ph.D.;Eliza Rosmaya Puri, S.T, M.T, Ph.D.;

13
ANALISIS OPERASIONAL DAN FINANSIAL ANGKOT BUY THE SERVICE STUDI KASUS: PERGANTIAN ANGKOT DENGAN MICROBUS DI KOTA BANDUNG Tesis
Ammar Asyraf[25023082]   Ir. R. Sony Sulaksono Wibowo, M.T, Ph.D.;Dr. Eng. Widyarini Weningtyas, S.T, M.T.;


15
HUBUNGAN ANTAR JENIS PEMBOROSAN NON-FISIK PADA KONSTRUKSI Tesis
Dhean Dwi Lestari[25022020]   Prof. Ir. Muhamad Abduh, M.T, Ph.D.;Budi Hasiholan, S.T., M.Eng., Ph.D.;

16
ANALISIS PEMILIHAN ALTERNATIF BANGUNAN COAL SHED DENGAN METODE ANALYSIS HIERARCHY PROCESS (AHP) (STUDI KASUS: PROYEK PLTU DIVISI EPC DI PT. HUTAMA KARYA) Tesis
Muhammad Ekky Gigih Prakoso[25022105]   Dr. Ir. Ima Fatima, M.Eng.;Prof. Ir. Muhamad Abduh, M.T, Ph.D.;

17
KAJIAN ASPEK FINANSIAL DAN PENERAPAN KERJA SAMA OPERASIONAL (KSO) DI BANDARA INTERNASIONAL JAWA BARAT - KERTAJATI Tesis
Christina Natalia Sitompul[25022076]   Prof. Ir. Harun Al Rasyid, M.Sc., Ph.D.;Ir. R. Sony Sulaksono Wibowo, M.T, Ph.D.;


19
KAJIAN EFEKTIVITAS EDUKASI LEAN MENGGUNAKAN PLATFORM K2RNEO 1.0 Tesis
Yusfiansyah Insan Rosidi[25023101]   Prof. Ir. Muhamad Abduh, M.T, Ph.D.;Eliza Rosmaya Puri, S.T, M.T, Ph.D.;

20
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTRUKSI HIGH RISE BUILDING PADA PT. HUTAMA KARYA (PERSERO) Tesis
Kurniawan Bogo Yustanto[25022085]   Prof. Dr. Ir. Rizal Z. Tamin;Rani Gayatri Kusumawardhani P., S.T, M.Sc., Ph.D.;