digilib@itb.ac.id +62 812 2508 8800
101
PERANCANGAN STRUKTUR SENTRA DAN LOKAKARYA TENUN JAWA BARAT Tugas Akhir
Muhammad Fikri Ramadhan[15019020]   Dr. Eng. Aris Aryanto, S.T, M.T.;

102
PERANCANGAN MANAJEMEN DAN REKAYASA KONSTRUKSI GEDUNG SENTRA DAN LOKAKARYA TENUN JAWA BARAT Tugas Akhir
'Iffah Qisthiya[15019125]   Dr. Iris Mahani, S.T, M.T.;

103
PROYEK PEMBANGUNAN PASAR IKAN MUARA ANGKE SEBAGAI PASAR IKAN BERBASIS WISATA Tugas Akhir
Mikhael Kevin[15019011]   Ir. Hernawan Mahfudz, M.T.;Budi Hasiholan, S.T., M.Eng., Ph.D.;

104
PERANCANGAN TERMINAL BUS PENUMPANG TIPE A INDIHIANG, KOTA TASIKMALAYA Tugas Akhir
Samsul Arief Maulana[15017081]   Dr. Eng., Ir. Febri Zukhruf, S.T, M.T.;


106
PERANCANGAN STRUKTUR TAHAN GEMPA GEDUNG KANTOR SEWA DENGAN PENDEKATAN BIOFILIK DI KOTA SURABAYA Tugas Akhir
Baghiz Syauqi Ridhallah[15019021]   Erwin Lim, S.T., M.S., Ph.D.;

107


109
STUDI KOMPARASI STRUKTUR BANGUNAN GEDUNG BETON BERTINGKAT MENGGUNAKAN CORE SHEAR WALL DAN PERIMETER SHEAR WALL Tugas Akhir
Wilnando[15019003]   Prof. Ir. Adang Surahman, M.Sc., Ph.D.;

110
STUDI KOMPARASI STRUKTUR BANGUNAN GEDUNG BETON BERTINGKAT MENGGUNAKAN CORE SHEAR WALL DAN PERIMETER SHEAR WALL Tugas Akhir
Wilnando[15019003]   Prof. Ir. Adang Surahman, M.Sc., Ph.D.;

111
DESAIN SECANT PILE WALL PADA BAGIAN SELATAN DAN TIMUR UNTUK SEA WATER INTAKE PEMBANGKIT LISTRIK TENAGA UAP (PLTU) JAWA 9 &10 SURALAYA Tugas Akhir
Sarah Via Mades Aweka[15019061]   Ir. Andhika Sahadewa, S.T, M.S.E, Ph.D.;

112
DESAIN DINDING PENAHAN TANAH PADA SISI UTARA DAN TIMUR UNTUK SEAWATER INTAKE PEMBANGKIT LISTRIK TENAGA UAP JAWA 9 & 10 SURALAYA Tugas Akhir
Ibadurrahman Adz - Dzikro[15019041]   Ir. Andhika Sahadewa, S.T, M.S.E, Ph.D.;

113
DESAIN STRUKTUR TRANSFER HUB: REVITALISASI DAN PENGADAAN TOURISM ATTRACTION DI KAWASAN STASIUN MANGGARAI Tugas Akhir
Azzam Zaki Nahdi[15018023]   Ivan Sandi Darma, S.T, M.T, Ph.D.;



116
EVALUASI DAN PENINGKATAN PELAYANAN FASILITAS PENUMPANG STASIUN KERETA API ANGKUTAN ORANG DI STASIUN BANDUNG PINTU UTARA Tugas Akhir
Adriana Gabriela Palupi[15019144]   Dr. Harmein Rahman, S.T, M.T.;Ir. Nasuhi Zain, M.T.;

117
ANALISIS STABILITAS DAN DEFORMASI BACK TO BACK MSE WALL (BBMSE WALL): STUDI KASUS ELEVATED TOL YOGYA-BAWEN SEKSI I Tugas Akhir
Antania Hanjani[15019082]   Prof. Ir. I Wayan Sengara, M.S.EM, Ph.D.;Yuamar Imarrazan Basarah, S.T., M.T., Ph.D.;

118
PERANCANGAN STRUKTUR DERMAGA DAN TRESTLE PELABUHAN PERIKANAN MUARA ANGKE Tugas Akhir
Derick Sufendy[15019079]   Prof. Ir. Adang Surahman, M.Sc., Ph.D.;


120
PERANCANGAN FASILITAS PELABUHAN PERIKANAN MUARA ANGKE Tugas Akhir
Murti Kamajaya[15019130]   Dr. Eng., Ir. Febri Zukhruf, S.T, M.T.;