421
PERANCANGAN MECHANICAL BIOLOGICAL TREATMENT (MBT) UNTUK MENGOLAH LIMBAH PADAT ORGANIK DI KABUPATEN PANGANDARAN MENJADI BIOSTABILISED OUTPUT Tugas Akhir
Achmad Taufiqur Rohman[15315001]   Dr. Benno Rahardyan, S.T., M.T.;
Achmad Taufiqur Rohman[15315001]   Dr. Benno Rahardyan, S.T., M.T.;
422
PERANCANGAN FASILITAS PENGOLAHAN SAMPAH ANORGANIK DENGAN KONSEP WASTE TO ENERGY DI KABUPATEN PANGANDARAN, JAWA BARAT Tugas Akhir
Saarah Thifal Aini[15315044]   Dr. Benno Rahardyan, S.T., M.T.;
Saarah Thifal Aini[15315044]   Dr. Benno Rahardyan, S.T., M.T.;
423
PERANCANGAN UNIT KOAGULASI, FLOKULASI, DAN SEDIMENTASI PADA INSTALASI PENGOLAHAN AIR (IPA) SINUMBRA, KABUPATEN BANDUNG Tugas Akhir
Bagia Jati Permana[15315048]   Prof. Ir. Suprihanto, Ph.D.;
Bagia Jati Permana[15315048]   Prof. Ir. Suprihanto, Ph.D.;
424
PERANCANGAN SISTEM REVITALISASI SUNGAI MENGGUNAKAN CONSTRUCTED WETLANDS DI SUNGAI CIKAKEMBANG, KECAMATAN MAJALAYA Tugas Akhir
Winston T Marco[15315054]   Ir. Indah Rachmatiah Siti Salami, M.Sc., Ph.D.;
Winston T Marco[15315054]   Ir. Indah Rachmatiah Siti Salami, M.Sc., Ph.D.;
425
PERANCANGAN SISTEM PLAMBING AIR LIMBAH DI RUMAH SAKIT KHUSUS IBU DAN ANAK UJUNGBERUNG Tugas Akhir
Satria Nugraha Nurmansyah[15315042]   Dr. Herto Dwi Ariesyady, S.T., M.T.;
Satria Nugraha Nurmansyah[15315042]   Dr. Herto Dwi Ariesyady, S.T., M.T.;
426
DESAIN BANGUNAN INTAKE, UNIT KOAGULASI, FLOKULASI, DAN SEDIMENTASI INSTALASI PENGOLAHAN AIR (IPA) PINTU AIR SEPULUH KOTA TANGERANG Tugas Akhir
Devyandra Eka Putri[15315026]   Ir. James Nobelia Isnania Wardhana, M.T.;
Devyandra Eka Putri[15315026]   Ir. James Nobelia Isnania Wardhana, M.T.;
427
PERANCANGAN INDONESIA TOURISM DEVELOPMENT CORPORATION (ITDC) RECYCLING FACILITY DI KAWASAN PARIWISATA NUSA DUA, BALI Tugas Akhir
Made Ayu Priyanka[15315022]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
Made Ayu Priyanka[15315022]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
428
PERANCANGAN STASIUN PERALIHAN ANTARA (SPA) CIROYOM BERSKALA KAWASAN DI KECAMATAN ANDIR KOTA BANDUNG Tugas Akhir
Oloan Ivan Daniel[15314016]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
Oloan Ivan Daniel[15314016]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
429
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH BERBASIS 3R (REDUCE, REUSE, RECYCLE) DI PASAR MODERN BATUNUNGGAL INDAH, KECAMATAN BANDUNG KIDUL, KOTA BANDUNG Tugas Akhir
Astrid Aristamaya[15315082]   Prof. Dra. Barti Setiani M, Ph.D., Dr. I Made Wahyu Widyarsana, S.T., M.T.;
Astrid Aristamaya[15315082]   Prof. Dra. Barti Setiani M, Ph.D., Dr. I Made Wahyu Widyarsana, S.T., M.T.;
430
UPRATING INSTALASI PENGOLAHAN AIR PEJOMPONGAN 2, PT X, DKI JAKARTA Tugas Akhir
Khalda Afifah Haris[15315073]   Suharyanto, S.T., M.Sc., Ph.D.;
Khalda Afifah Haris[15315073]   Suharyanto, S.T., M.Sc., Ph.D.;
431
REDESAIN INSTALASI PENGOLAHAN AIR DAGO PAKAR PDAM TIRTAWENING KOTA BANDUNG DALAM PENCEGAHAN PEMBENTUKAN TRIHALOMETAN Tugas Akhir
Sania Septiani Mulyawan[15314058]   Dr. Ir. Dwina Roosmini, MS;
Sania Septiani Mulyawan[15314058]   Dr. Ir. Dwina Roosmini, MS;
432
DESAIN UNIT KOAGULASI, FLOKULASI, DAN SEDIMENTASI INSTALASI PENGOLAHAN AIR (IPA) PT JAKARTA UTILITAS PROPERTINDO, HUTAN KOTA PLUIT, KOTA JAKARTA UTARA Tugas Akhir
Kinanti Aldhia Naura[15315004]   Prof. Ir. Suprihanto, Ph.D.;
Kinanti Aldhia Naura[15315004]   Prof. Ir. Suprihanto, Ph.D.;
433
REDESAIN TPS 3R DAN INSTALASI PENGOLAHAN SAMPAH ANORGANIK DI TPS 3R DESA MERBUNG, KECAMATAN KLATEN SELATAN, KABUPATEN KLATEN Tugas Akhir
Dianisti Saraswati[15315079]   Dr. Opy Kurniasari, S.T., M.T.;
Dianisti Saraswati[15315079]   Dr. Opy Kurniasari, S.T., M.T.;
434
UPRATING UNIT FILTRASI, DESINFEKSI, DAN RESERVOIR (IPA) SUKAMAJU PDAM TIRTA RAHARJA CIMAHI KABUPATEN BANDUNG Tugas Akhir
Pieter Giovanni Eisura[15312050]   Rofiq Iqbal, S.T., M.Eng., Ph.D.;
Pieter Giovanni Eisura[15312050]   Rofiq Iqbal, S.T., M.Eng., Ph.D.;
435
DESAIN SISTEM DRAINASE BERKELANJUTAN DI INSTITUT TEKNOLOGI BANDUNG – KAMPUS CIREBON Tugas Akhir
Rizky Mulya Pramana[15315028]   Dr. Ir. Priana Sudjono, MS, Dipl.Eng.; Dr.Ir. Katharina Oginawati,MS
Rizky Mulya Pramana[15315028]   Dr. Ir. Priana Sudjono, MS, Dipl.Eng.; Dr.Ir. Katharina Oginawati,MS
436
DESAIN INSTALASI PENGOLAHAN AIR LIMBAH DOMESTIK DI KECAMATAN RANCAEKEK Tugas Akhir
Asri Hadiyanti Giastuti[15315029]   Dr. Anindrya Nastiti, S.T., M.T.;
Asri Hadiyanti Giastuti[15315029]   Dr. Anindrya Nastiti, S.T., M.T.;
437
PRINSIP REDUCE, REUSE, DAN RECYCLE) KEDURUS PERANCANGAN ULANG TPS 3R (TEMPAT PENGOLAHAN SAMPAH DENGAN, KARANG PILANG, SURABAYA Tugas Akhir
Sharfina Ulfah Zatadini[15315040]   Prof. Dr. Ir. Enri Damanhuri;
Sharfina Ulfah Zatadini[15315040]   Prof. Dr. Ir. Enri Damanhuri;
438
PRINSIP REDUCE, REUSE, DAN RECYCLE) KEDURUS PERANCANGAN ULANG TPS 3R (TEMPAT PENGOLAHAN SAMPAH DENGAN, KARANG PILANG, SURABAYA Tugas Akhir
Sharfina Ulfah Zatadini[15315040]   Prof. Dr. Ir. Enri Damanhuri;
Sharfina Ulfah Zatadini[15315040]   Prof. Dr. Ir. Enri Damanhuri;
439
PERANCANGAN MATERIAL RECOVERY FACILITY (MRF) DI KOTA CIMAHI Tugas Akhir
Nabilah Kushaflyki[15315047]   Sukandar, S.Si., M.T., Ph.D.;
Nabilah Kushaflyki[15315047]   Sukandar, S.Si., M.T., Ph.D.;
440
DESAIN UNIT PENGENDALIAN PENCEMARAN UDARA PADA COAL MILL 1, PLANT 14 DI PT INDOCEMENT TUNGGAL PRAKARSA, CIBINONG, JAWA BARAT Tugas Akhir
Addina Shafiyya Ediansjah[15315067]   Dr.mont. Kania Dewi, S.T., M.T.;
Addina Shafiyya Ediansjah[15315067]   Dr.mont. Kania Dewi, S.T., M.T.;