81
PERANCANGAN SISTEM PLAMBING AIR BERSIH, AIR BUANGAN, VENT, AIR HUJAN DAN SISTEM PEMADAM KEBAKARAN PADA GEDUNG ACTIVITY BASED WORKING OFFICE DI KAWASAN ALAM SUTERA, TANGERANG Tugas Akhir
Annisya Fitri Melinia[15717019]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
Annisya Fitri Melinia[15717019]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
82
PERANCANGAN PENGOLAHAN SAMPAH DI INTERMEDIATE TREATMENT FACILITY (ITF) ZONA TIMUR DKI JAKARTA Tugas Akhir
Rifdhan Senandik Mahari[15717031]   Emenda Sembiring, S.T., M.T., M.Eng.Sc., Ph.D.;Elprida Agustina, S.T., M.T.;
Rifdhan Senandik Mahari[15717031]   Emenda Sembiring, S.T., M.T., M.Eng.Sc., Ph.D.;Elprida Agustina, S.T., M.T.;
83
PERANCANGAN SISTEM PLAMBING AIR BERSIH, AIR BUANGAN, VENT, AIR HUJAN, DAN PEMADAM KEBAKARAN RUMAH SAKIT KANKER DI BEKASI Tugas Akhir
Ferdinan[15716025]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
Ferdinan[15716025]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
84
PERENCANAAN SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT SKALA PERMUKIMAN DI RPTRA KOPI GANDARIA, KELURAHAN PEKAYON, JAKARTA TIMUR Tugas Akhir
Maudy Rachma Aulia[15717027]   Dr. Ir. M. Sonny Abfertiawan, S.T., M.T..
Maudy Rachma Aulia[15717027]   Dr. Ir. M. Sonny Abfertiawan, S.T., M.T..
85
DESAIN INSTALASI PENGOLAHAN LINDI TPA CIJERUK, KABUPATEN SUMEDANG Tugas Akhir
Dewi Fatmawati[15717004]   Prof. Dr. Ir. Enri Damanhuri
Dewi Fatmawati[15717004]   Prof. Dr. Ir. Enri Damanhuri
86
PERANCANGAN INSTALASI PENGOLAHAN AIR MINUM KAWASAN PEMUKIMAN DAN INDUSTRI APP SINAR MAS KABUPATEN KARAWANG Tugas Akhir
Hilmi Adillah[15717028]   Ir. Agus Jatnika Effendi Ph.D.
Hilmi Adillah[15717028]   Ir. Agus Jatnika Effendi Ph.D.
87
PERENCANAAN SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT SKALA PERMUKIMAN DI KELURAHAN KEBAGUSAN, JAKARTA SELATAN Tugas Akhir
Roselina Yolanda Dwilestari[15717023]   Dr. Dyah Wulandari Putri, S.T., M.T.;
Roselina Yolanda Dwilestari[15717023]   Dr. Dyah Wulandari Putri, S.T., M.T.;
88
PERANCANGAN PUSAT DAUR ULANG (PDU) DI TPA TEMESI, KABUPATEN GIANYAR, BALI Tugas Akhir
Savira Safitri[15717030]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
Savira Safitri[15717030]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
89
PENGEMBANGAN SISTEM JARINGAN DISTRIBUSI AIR BERSIH PERUM JASA TIRTA II, KECAMATAN JATILUHUR, KABUPATEN PURWAKARTA Tugas Akhir
Chandra David H M[15715017]   Ir. Yuniati, M.T., M.Sc., Ph.D.;
Chandra David H M[15715017]   Ir. Yuniati, M.T., M.Sc., Ph.D.;
90
DESAIN PENGEMBANGAN JARINGAN DISTRIBUSI DENGAN PEMBENTUKAN DMA (DISTRICT METER AREA) SISTEM PENYEDIAAN AIR MINUM PERUMDA TIRTA RAHARJA WILAYAH KECAMATAN SOREANG Tugas Akhir
Sarah Rara Nesia[15717016]   Prof. Ir. Suprihanto, Ph.D.;
Sarah Rara Nesia[15717016]   Prof. Ir. Suprihanto, Ph.D.;
91
PENGELOLAAN SAMPAH PEMUKIMAN DAS CITARUM SEKTOR 21 SUB SEKTOR 7 KECAMATAN PAMEUNGPEUK Tugas Akhir
Rexta Rodiah Zain[15716014]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
Rexta Rodiah Zain[15716014]   Dr. I Made Wahyu Widyarsana, S.T., M.T.;
92
PERANCANGAN SISTEM PLAMBING AIR BERSIH, AIR BUANGAN, VENT, AIR HUJAN, DAN SISTEM PEMADAM KEBAKARAN PADA PROYEK HOTEL KELAS MENENGAH DI JAKARTA PUSAT Tugas Akhir
Nico Kartijaya[15717021]   Ir. Arief Sudradjat, S.T., MIS, Ph.D.;
Nico Kartijaya[15717021]   Ir. Arief Sudradjat, S.T., MIS, Ph.D.;
93
PERANCANGAN SISTEM PLAMBING (AIR BERSIH, AIR HUJAN, DAN SISTEM PENCEGAH KEBAKARAN) DI GEDUNG KANTOR B TB SIMATUPANG JAKARTA SELATAN Tugas Akhir
Lilih Muflihah[15717012]   Ir. Ahmad Soleh Setiyawan, S.T., M.T., Ph.D.;
Lilih Muflihah[15717012]   Ir. Ahmad Soleh Setiyawan, S.T., M.T., Ph.D.;
94
PENGEMBANGAN JARINGAN PIPA DISTRIBUSI PDAM KABUPATEN NGANJUK UNIT WILAYAH KERTOSONO Tugas Akhir
Dian Anggreani Sugesti[15717006]   Rofiq Iqbal, S.T., M.Eng., Ph.D.;
Dian Anggreani Sugesti[15717006]   Rofiq Iqbal, S.T., M.Eng., Ph.D.;
95
PERANCANGAN SISTEM PERPIPAAN AIR BERSIH, AIR BUANGAN, VENT, DAN PEMADAM KEBAKARAN GEDUNG KANTOR KEUSKUPAN DI KOTA BANDUNG Tugas Akhir
David Marseille Sutanto[15717011]   Dr. Mariana Marselina S., S.T., M.T.;
David Marseille Sutanto[15717011]   Dr. Mariana Marselina S., S.T., M.T.;
96
PERENCANAAN DISTRICT METER AREA (DMA) KAWASAN PERUMAHAN TAMAN KOTA, KECAMATAN KEMBANGAN, JAKARTA Tugas Akhir
Hans Projo Susanto[15717010]   Dr.-Ing. Marisa Handajani, S.T., M.T.;
Hans Projo Susanto[15717010]   Dr.-Ing. Marisa Handajani, S.T., M.T.;
97
PERANCANGAN SISTEM JARINGAN DISTRIBUSI AIR MINUM DAN PEMBENTUKAN DISTRICT METER AREA (DMA) DI KECAMATAN MAJALAYA, KABUPATEN BANDUNG Tugas Akhir
Denis Bahtiar Ramadani[15717007]   Ir. Yuniati, M.T., M.Sc., Ph.D.;
Denis Bahtiar Ramadani[15717007]   Ir. Yuniati, M.T., M.Sc., Ph.D.;
98
PERANCANGAN SISTEM DRAINASE BERBASIS ECODRAINAGE DI PERUMAHAN BUMI PANYAWANGAN, KECAMATAN CILEUNYI, KABUPATEN BANDUNG, JAWA BARAT Tugas Akhir
Indra Nugraha Ramdhani[15714022]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
Indra Nugraha Ramdhani[15714022]   Teddy Tedjakusuma, S.T., M.T., Ph.D.;
99
PERENCANAAN SISTEM PENGELOLAAN AIR LIMBAH DOMESTIK TERPUSAT SKALA PERMUKIMAN DI RPTRA PULO GUNDUL, JAKARTA PUSAT Tugas Akhir
Hanna Maria Scriftura Sinaga[15717008]   Dr. Dyah Wulandari Putri, S.T., M.T.;
Hanna Maria Scriftura Sinaga[15717008]   Dr. Dyah Wulandari Putri, S.T., M.T.;
100
REDESAIN INSTALASI PENGOLAHAN AIR LIMBAH DOMESTIK (IPALD) SOREANG KABUPATEN BANDUNG Tugas Akhir
Arvin Reimizar Sini[15716007]   Dr. Ir. Dwina Roosmini, MS;
Arvin Reimizar Sini[15716007]   Dr. Ir. Dwina Roosmini, MS;