digilib@itb.ac.id +62 812 2508 8800
181
PERENCANAAN INSTALASI PENGOLAHAN AIR MINUM (IPAM) KARANGPILANG IV, PDAM SURYA SEMBADA KOTA SURABAYA Tugas Akhir
Wika Maulany Fatimah[]   Pembimbing :Rofiq Iqbal,ST,M.eng,PhD NIP. 197602052006041002

182
PERANCANGAN STASIUN PERALIHAN ANTARA (SPA) SKALA KAWASAN DI CIMAHI TENGAH, KOTA CIMAHI, JAWA BARAT Tugas Akhir
VIRGIA RINANDA ( 15714006 )[]   Pembimbing :Dr. Mochammad Chaerul ST. MT. NIP. 197409262008011006

183
PERANCANGAN STASIUN PERALIHAN ANTARA (SPA) SKALA KAWASAN DI CIMAHI TENGAH, KOTA CIMAHI, JAWA BARAT Tugas Akhir
VIRGIA RINANDA (NIM : 15714006)[]   Pembimbing :Dr. Mochammad Chaerul ST. MT.


185
REDESAIN SISTEM PENGOLAHAN AIR LIMBAH PADA INSTALASI PENGOLAHAN AIR LIMBAH (IPAL) MOJOSONGO, SURAKARTA Tugas Akhir
NUR SYABANIAWATI[]   Pembimbing :PROF. IR. MINDRIANY SYAFILA M.S., Ph.D. NIP. 196105101986102001

186
PERENCANAAN OUTLINE PLAN SISTEM PENGELOLAAN SAMPAH KABUPATEN BADUNG, BALI Tugas Akhir
NIDA ULHUSNA[]   Pembimbing : Dr. I Made Wahyu Widyarsana, ST., MT. NIP. 197912182014041001

187
PERANCANGAN ULANG INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) CIBINONG, KABUPATEN BOGOR Tugas Akhir
Muhammad Hudzaifa Siregar[]   Pembimbing : Dr. -Ing. Marisa Handajani, S.T., M.T. NIP: 197207151997032002

188
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH DI KOMPLEK PERTAMINA LEARNING CENTER, SIMPRUG, JAKARTA SELATAN Tugas Akhir
Marchella Christcelia Gultom NIM : 15714024[]   Pro.Dr.Ing.Ir. Prayatni Soewondo, MS NIP:195702211983032001

189
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) DI TEMPAT PEMBUANGAN DAN PEMROSESAN AKHIR SAMPAH (TPPAS) CIKOLOTOK KABUPATEN PURWAKARTA Tugas Akhir
LASTRI NATASIA DUMAWI SIDABUTAR NIM: 15714015[]   Prof.Dr.Ir. Enri Damanhuri NIP. 194907121977011001

190
PERANCANGAN TEMPAT PENGOLAHAN SAMPAH TERPADU (TPST) KAWASAN WISATA UBUD, KAB. GIANYAR, PROVINSI BALI Tugas Akhir
KANIA SALMAA []   Pembimbing : Dr. I Made Wahyu Widyarsana ST., MT. NIP: 197912182014041001

191
PERENCANAAN DESAIN PENINGKATAN KAPASITAS PENGOLAHAN AIR MINUM (IPAM) CIKOKOL, KABUPATEN TANGERANG Tugas Akhir
Jane Oibanitehenia Gulo[]   Pembimbing :Rofiq Iqbal, S.T., M.Eng., PhD NIP. 197602052006041002

192
OPTIMALISASI DAN PENGEMBANGAN INSTALASI PENGOLAHAN AIR (IPA) DAGO PAKAR KOTA BANDUNG Tugas Akhir
Hana Fauziyyah Amini[]   Pembimbing : Dr.Ir Dwina Roosmini ,MS


194
PENGEMBANGAN INSTALASI PENGOLAHAN LUMPUR TINJA MUARAREJA, KOTA TEGAL, JAWA TENGAH Tugas Akhir
DELIANA PRASETIYANA SARI (NIM : 15713022)[]   Pembimbing : Ahmad Soleh Setiyawan S.T,M.T,Ph.D.

195
PERANCANGAN SISTEM PLAMBING RUMAH SUSUN NELAYAN DI MARUNDA, JAKARTA UTARA Tugas Akhir
CHRISTOPHER HANDINO - Nim: 15714027 []   Ir. Yuniati, M.T., M.Sc., Ph.D.

196
DESAIN INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT), TAMBAK LOROK, KOTA SEMARANG Tugas Akhir
Brigitta Merylla Riani[]   Pembimbing :Prof. Ir. Mindriany Syafila, M.S., Ph.D NIP. 196105101986102001

197
PERANCANGAN INSTALASI PENGOLAHAN LUMPUR TINJA (IPLT) SKALA KOTA DI KOTA BANDUNG Tugas Akhir
AZZAHRA SAFIRA SURYANTO - NIM : 15714011 []   Dr. –Ing Marisa Handajani, S.T., M.T. Dr. M. Sonny Abfertiawan, S.T., M.T.

198
RE-DESAIN TEMPAT PENAMPUNGAN SEMENTARA (TPS) MENJADI TEMPAT PENGOLAHAN SAMPAH REDUCE, REUSE, RECYCLE (TPS 3R) DI KECAMATAN ARCAMANIK KOTA BANDUNG Tugas Akhir
Aulia Ulfatunnisa []   Pembimbing :Dr. Mochammad Chaerul, S.T., M.T. NIP. 197409262008011006

199
PERANCANGAN ULANG JARINGAN DISTRIBUSI DAN PEMBENTUKAN DISTRICT METER AREA (DMA) SISTEM PENYEDIAAN AIR MINUM (SPAM) ZONA 1, KOTA BOGOR Tugas Akhir
ANGGITA LARASATI[]   Pembimbing : Prof Ir Suprihanto Notodarmojo,Ph.D NIP 195412091980031002

200
PERENCANAAN SISTEM JARINGAN DISTRIBUSI AIR MINUM DI KECAMATAN CIMAHI TENGAH, KOTA CIMAHI Tugas Akhir
Windini (NIM: 15713012)[]   Pembimbing : Ir. Yuniati, M.Sc., Ph.D