1
PENINGKATAN PROSES PELAYANAN FARMASI RAWAT JALAN BPJS MENGGUNAKAN PENDEKATAN LEAN HEALTHCARE: STUDI KASUS DI JAKARTA HEART CENTRE MATRAMAN JAKARTA Tesis
Yan Yan Gatot Mulyadi[29124302]   Dr. Eng. Nur Budi Mulyono, S.T, M.T.;
Yan Yan Gatot Mulyadi[29124302]   Dr. Eng. Nur Budi Mulyono, S.T, M.T.;
2
STRATEGI OPTIMASI SOCIAL COMMERCE UNTUK MENINGKATKAN KINERJA BISNIS PADA USAHA AKSESORIS FESYEN BUATAN TANGAN: STUDI KASUS NODES DECO Tesis
Alya Chairunnisa Tahira[29124339]   Sonny Rustiadi, SE., MBA., Ph.D., CBAP.;
Alya Chairunnisa Tahira[29124339]   Sonny Rustiadi, SE., MBA., Ph.D., CBAP.;
3
PENGEMBANGAN KERANGKA KERJA STRATEGIS UNTUK MEMPERKUAT KAPABILITAS ORGANISASI SELAMA TRANSFORMASI STRATEGIS PERUSAHAAN: STUDI KASUS HAREUDANG BANDUNG Tesis
Mochamad Fachri Rizky Zamzami[29124311]   Ilma Aulia Zaim, S.Ds., M.S.M., Ph.D.;
Mochamad Fachri Rizky Zamzami[29124311]   Ilma Aulia Zaim, S.Ds., M.S.M., Ph.D.;
4
FAKTOR-FAKTOR YANG MEMPENGARUHI EFEKTIVITAS MITRA BISNIS SUMBER DAYA MANUSIA PADA TAHAP AWAL PELAKSANAAN TRANSFORMASI SDM 2.0 DI PT PLN (PERSERO) Tesis
Agustinus Titis Iswara[29124368]   Achmad Ghazali, S.T, M.A.B, Ph.D.;
Agustinus Titis Iswara[29124368]   Achmad Ghazali, S.T, M.A.B, Ph.D.;
5
NAVIGATING INDONESIA'S UTILITY-SCALE SOLAR PROGRAM: A STRATEGIC MANAGEMENT PERSPECTIVE ON PLN Tesis
Anna Maria Josephine S[29124432]   Dr. Harimukti Wandebori, S.T, MBA.;
Anna Maria Josephine S[29124432]   Dr. Harimukti Wandebori, S.T, MBA.;
6
STRATEGIC DECISION-MAKING FOR MINIMIZING LOSS PRODUCTION OPPORTUNITY IN JATIBARANG STRUCTURE Tesis
Saifudin Zuhri[29123273]   Santi Novani, S.Si., M.T, Ph.D.;
Saifudin Zuhri[29123273]   Santi Novani, S.Si., M.T, Ph.D.;
7
OPTIMALISASI STRATEGY INVESTASI DENGAN VALUASI OPSI NYATA: STUDI KASUS HIBRIDISASI PLTS-DIESEL DI INDUSTRI PERTAMBANGAN INDONESIA Tesis
Kevin Christoper Halomoan[29124409]   Ir. Dzikri Firmansyah Hakam, S.T., Pg.Dip., M.Sc., Ph.D.;
Kevin Christoper Halomoan[29124409]   Ir. Dzikri Firmansyah Hakam, S.T., Pg.Dip., M.Sc., Ph.D.;
8
FAKTOR-FAKTOR YANG MEMPENGARUHI KEPEMILIKAN KAS PADA PERUSAHAAN KETENAGALISTRIKAN YANG PADAT MODAL DI NEGARA-NEGARA ASIA Tesis
Pachrul Rivani[29124372]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
Pachrul Rivani[29124372]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
9
DAMPAK PEMBIAYAAN HIJAU TERHADAP ANALISIS KELAYAKAN FINANSIAL PROYEK INTERKONEKSI TRANSMISI SULAWESI PT PLN Tesis
Kinanta Syahriannanda[29124419]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
Kinanta Syahriannanda[29124419]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
10
PERBAIKAN PROSES MOBILISASI KONTRAKTOR MENGGUNAKAN KERANGKA DMAIC DI PT FREEPORT INDONESIA Tesis
Whina Anugraheni Maharani[29124380]   Dr. Liane Okdinawati, S.T, M.T.;
Whina Anugraheni Maharani[29124380]   Dr. Liane Okdinawati, S.T, M.T.;
11
ANALISIS MARGIN USAHA PLN DAN ALTERNATIF DUKUNGAN PEMERINTAH DALAM PELAKSANAAN TRANSISI ENERGI BERDASARKAN RUPTL DENGAN TETAP MENJAGA KEBERLANJUTAN KEUANGAN Tesis
Yehuda Bayu Kristiawan[29124425]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
Yehuda Bayu Kristiawan[29124425]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
12
ANALISIS KELAYAKAN FINANSIAL DAN RISIKO INVESTASI PADA PROYEK PENYAMBUNGAN TEGANGAN TINGGI PT MITRA MURNI PERKASA (MMP) BALIKPAPAN Tesis
Anrizal[29124428]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
Anrizal[29124428]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
13
KELAYAKAN FINANSIAL YANG DISESUAIKAN DENGAN RISIKO TERHADAP ALTERNATIF AKUISISI PEMBANGKIT LISTRIK TENAGA UAP (PLTU) IPP 2X100 MW DI KALIMANTAN TIMUR: STUDI KASUS PT PLN (PERSERO) Tesis
Yohanes Dhamas Wisnu S. W.[29124427]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
Yohanes Dhamas Wisnu S. W.[29124427]   Dr. Sylviana Maya Damayanti, S.T., M.B.A.;
14
INVENTORY MANAGEMENT APPROACH FOR COST REDUCTION: A CASE STUDY IN PT PLN (PERSERO) Tesis
Rendy Yuliandhika[29124379]   Akbar Adhi Utama, S.T, M.A.B., Ph.D.;
Rendy Yuliandhika[29124379]   Akbar Adhi Utama, S.T, M.A.B., Ph.D.;
15
FORECAST-BASED DECISION FRAMEWORK FOR REPLACEMENT OF ROS AND ONBOARD COMPONENTS IN AUTONOMOUS LOADERS: A CASE STUDY AT GBC MINE PT FREEPORT INDONESIA Tesis
Paskah H B Nainggolan[29124406]   Dr. Eng. Nur Budi Mulyono, S.T, M.T.;
Paskah H B Nainggolan[29124406]   Dr. Eng. Nur Budi Mulyono, S.T, M.T.;
16
PENINGKATAN DAN PERCEPATAN PROSES REBUILD DAN KONVERSI PADA GERBONG BIJIH DI TAMBANG GRASBERG BLOCK CAVE PT FREEPORT INDONESIA Tesis
Panji Adino[29124420]   Prof. Ir. Gatot Yudoko, M.A.SC., Ph.D.;
Panji Adino[29124420]   Prof. Ir. Gatot Yudoko, M.A.SC., Ph.D.;
17
DARI KEPUTUSAN INVESTASI STATIS MENUJU FLEKSIBEL: ANALISA REAL OPTIONS PADA PROYEK PLTS 10 MW DI INDONESIA TIMUR Tesis
Haryo Agung Wibowo[29124430]   Ir. Dzikri Firmansyah Hakam, S.T., Pg.Dip., M.Sc., Ph.D.;
Haryo Agung Wibowo[29124430]   Ir. Dzikri Firmansyah Hakam, S.T., Pg.Dip., M.Sc., Ph.D.;
18
OPTIMIZATION OF MELAWAN OVERLAND CONVEYOR (OLC) PRODUCTION AT COAL PROCESSING PLANT - COAL PROCESSING HANDLING DIVISION PT. KALTIM PRIMA COAL Tesis
Achmad Yahya Chasanuddin[29123178]   Dr. Yuanita Handayati, M.S.M.;
Achmad Yahya Chasanuddin[29123178]   Dr. Yuanita Handayati, M.S.M.;
19
READINESS EVALUATION OF OPERATIONAL WORKFORCE WITHIN PTFI’S DEWATERING PLANT IN THE INTEGRATION OF THE NEW SHIPLOADER-2 ASSET USING KEPNER-TREGOE POTENTIAL PROBLEM ANALYSIS METHOD Tesis
Kevin Argha Sipayung[29124411]   Prof. Dr. Aurik Gustomo, S.T., M.T.;
Kevin Argha Sipayung[29124411]   Prof. Dr. Aurik Gustomo, S.T., M.T.;
20
ANALISIS KETERLAMBATAN PROYEK DAN STRATEGI PERBAIKAN PADA PROYEK INFRASTRUKTUR PANAS BUMI MATALOKO Tesis
Taufan Febri Herdian[29124401]   Prof. Ir. Gatot Yudoko, M.A.SC., Ph.D.;
Taufan Febri Herdian[29124401]   Prof. Ir. Gatot Yudoko, M.A.SC., Ph.D.;
Perpustakaan Digital ITB