801
PREFERENSI PENGAMBILAN KEPUTUSAN TERHADAP MASALAH KETERLAMBATAN DANA DI PTS Tesis
Hertri Samirono
NIM. 234 90 013[]   P
Hertri Samirono
NIM. 234 90 013[]   P
802
PENGEMBANGAN SISTEM INFORMASI AKUNTANSI TERPADU DENGAN CONTOH KASUS KOKESMA ITB Tesis
Purnomo Adi [23489039]   Pembimbing I:Sudarso Kaderi Wiryono,Dr.Ir Pembimbing II:Iman Sudirman,Dr.Ir Scan :Neneng (2006-06-21)
Purnomo Adi [23489039]   Pembimbing I:Sudarso Kaderi Wiryono,Dr.Ir Pembimbing II:Iman Sudirman,Dr.Ir Scan :Neneng (2006-06-21)
803
STUDI MENGENAI POLA TRANSFER TEKNOLOGI PADA INDUSTRI KECIL DAN MENENGAH KARET DAN LOGAM Tesis
Kusnadi Sugiyatno[]   S.B.Hari Lubis, Scan : Mudjiono
Kusnadi Sugiyatno[]   S.B.Hari Lubis, Scan : Mudjiono
804
ANALISIS KUALITAS JASA PENDIDIKAN TINGGI DI JURUSAN SIPIL FAKULTAS TEKNIK UNIVERSITAS PANCASILA DENGAN MENGGUNAKAN MODEL HOUSE OF QUALITY MENURUT PERSEPSI MAHASISWA Tesis
FX.Ferry Munaf[]   Pembimbing : Bambang Hermanto,Scan : Mudjiono
FX.Ferry Munaf[]   Pembimbing : Bambang Hermanto,Scan : Mudjiono
805
PENGGUNAAN KOMPONEN CHAOS DAN ARTIFICIAL NEURAL NETWORK UNTUK PERAMALAN HARGA SAHAM Tesis
Dandy Subron Muhyiddin[]   Imam Istiyanto , Scan : Mudjiono
Dandy Subron Muhyiddin[]   Imam Istiyanto , Scan : Mudjiono
806
MODEL ONGKOS PERPANJANGAN GARANSI SUB ASSEMBLY FRAME SEPEDA MOTOR Tesis
Ag.Gatot Bintoro[]   Bermawi P.Iskandar , Scan : Mudjiono
Ag.Gatot Bintoro[]   Bermawi P.Iskandar , Scan : Mudjiono
807
PENGEMBANGAN MODEL PEMILIHAN MITRA PEMASOK PADA PROYEK KONSTRUKSI Tesis
Syadaruddin Sychroni[23401048]   Pembimbing : Senator Nur Bahagia , Scan : Mudjiono
Syadaruddin Sychroni[23401048]   Pembimbing : Senator Nur Bahagia , Scan : Mudjiono
808
PENGEMBANGAN MODEL SISTEM PERSEDIAAN PERIODIC REVIEW DENGAN SATU EMERGENCY ORDER Tesis
Sapto Wiji Utomo[]   Pembimbing : Senator Nur Bahagia , Scan : Mudjiono
Sapto Wiji Utomo[]   Pembimbing : Senator Nur Bahagia , Scan : Mudjiono
809
ANALISIS PENGEMBANGAN WILAYAH MELALUI PENDEKATAN KLASTER INDUSTRI STUDI KASUS PERIKANAN LAUT KABUPATEN SUKABUMI, PROPINSI JAWA BARAT Tesis
Erwin H.Hutahaean[]   Surna Tjahja Djajadiningrat, Scan : Mudjiono
Erwin H.Hutahaean[]   Surna Tjahja Djajadiningrat, Scan : Mudjiono
810
811
KONSEPTUALISASI MODEL BISNIS WEB STUDI ANALITIS 17 SITUS PILIHAN Tesis
Purwanta Ari Wrdana[]   Pembimbing :Sudarso K.Wiryono, Scan: Mudjiono
Purwanta Ari Wrdana[]   Pembimbing :Sudarso K.Wiryono, Scan: Mudjiono
812
PERANCANGAN MODEL MANAJEMEN KINERJA (STUDI KASUS PADA TEKNOLOGI_ INFORMASI DENGAN PENDEKATAN ISP DI PT BADAK NGL) Tesis
Mudjahidin[]   Pembimbing: Kadarsah Suryadi, Scan : Mudjiono
Mudjahidin[]   Pembimbing: Kadarsah Suryadi, Scan : Mudjiono
813
PERANCANGAN MODEL MANAJEMEN KINERJA (STUDI KASUS PADA TEKNOLOGI_ INFORMASI DENGAN PENDEKATAN ISP DI PT BADAK NGL Tesis
Mudjahidin[]   Pembimbing : Kadarsah Suryadi, Scan : Mudjiono
Mudjahidin[]   Pembimbing : Kadarsah Suryadi, Scan : Mudjiono
814
EVALUASI ATAS BAURAN PEMASARAN
(STUDI KASUS PADA HARIAN EKONOMI ISB) Tesis
Dwi Yanti Meilani[]  
Dwi Yanti Meilani[]  
815
816
817
MEMPELAJARI SISTEM KERJASAMA PRODUKSI
UNTUK MENDAPATKAN BIAYA PRODUKSI MINIMUM
PADA PERUSAHAAN MANUFAKTUR Tesis
Untarti Tatik Mulyati[]  
Untarti Tatik Mulyati[]  
818
PERANCANGAN SISTEM PENDUKUNG KEPUTUSAN UNTUK PELAYANAN PELANGGAN PLN MENGGUNAKAN SISTEM AM/FM/GIS Tesis
Mohammad Mukhlis[]   Pembimbing : Ikadarsah Suryadi, Scan : Mudjiono
Mohammad Mukhlis[]   Pembimbing : Ikadarsah Suryadi, Scan : Mudjiono
819
820
USULAN STRATEGI GLOBAL LIPPO BANK DALAM MENGHIMPUN DANA MASYARAKAT MELALUI PRODUK TABUNGAN Tesis
Eka Maulana[]   Pembimbing : Anang Zaini Gani, Scan : Mudjiono
Eka Maulana[]   Pembimbing : Anang Zaini Gani, Scan : Mudjiono