digilib@itb.ac.id +62 812 2508 8800
1
PERANCANGAN SOP CONDITION BASED MAINTENANCE UNTUK MESIN SIEVING DI PT XYZ Tugas Akhir
Teungku Muhammad Ja'far Ali S[13422145]   Ir. Rachmawati Wangsaputra, M.T., Ph.D.;Dr. Nur Faizatus Sa'idah, S.Si., M.T.;

2
PERANCANGAN PERBAIKAN PROSES BISNIS PERGUDANGAN PUPUK DI PT XYZ MENGGUNAKAN METODE BUSINESS PROCESS IMPROVEMENT (BPI) Tugas Akhir
Siti Rosy Rahayu[13422109]   Prof. Ari Widyanti, S.T., M.T., Ph.D.;

3
OPTIMASI STRATEGI KEMITRAAN TERMINAL LIQUEFIED PETROLEUM GAS (LPG) PADA JARINGAN RANTAI PASOK HILIR PT X Tugas Akhir
Daniel Febrian Parhusip[13422068]   Rully Tri Cahyono, S.T., M.T., Ph.D.;

4
PERANCANGAN STRATEGI PRODUCT BUNDLING PADA MUNO COFFEE MENGGUNAKAN ASSOCIATION RULE MINING DAN MIXED BUNDLING PRICING Tugas Akhir
Atya Danastri Masantika[13422087]   Titah Yudhistira, S.T., M.T., Ph.D.;


6
PERANCANGAN METODE PERHITUNGAN ALOKASI PORTOFOLIO SAHAM LQ45 BERBASIS PREDIKSI RISIKO DAN PENGEMBALIAN DENGAN KEPUTUSAN TEORI PERMAINAN UNTUK PT X Tugas Akhir
Sebastian Salutare Noel Lumme[13422135]   Dr. Eng. Yosi Agustina Hidayat, S.T., M.T.;Dr. Nur Faizatus Sa'idah, S.Si., M.T.;

7
PERANCANGAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA PADA PROSES PRODUKSI GRAFENA DI PT RAVELWARE TECHNOLOGY INDONESIA Tugas Akhir
Faiz Jauhar Azzam[13422121]   Prof. Ari Widyanti, S.T., M.T., Ph.D.;Gradiyan Budi Pratama, S.T., M.T., M.Sc., Ph.D.;

8
PERANCANGAN MODEL PREDIKSI CUSTOMER CHURN MENGGUNAKAN METODE DATA MINING PADA PT X Tugas Akhir
Gracia Debora Sihaloho[13422091]   Prof. Dr. Ir. Kadarsah Suryadi, D.E.A.;

9
PERANCANGAN TATA LETAK FASILITAS GUDANG PT X MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP) Tugas Akhir
Andika Richardo Napitupulu[13422061]   Muhammad Akbar, S.T., M.T., Ph.D.;

10
PERANCANGAN DYNAMIC CUSTOMER SEGMENTATION MODEL DENGAN MULTIVARIATE TIME SERIES CLUSTERING Tugas Akhir
Rozan Hasan Abdullah[13422048]   Prof. Dr. Hasrini Sari, S.T., M.T.;


12
PENGARUH WORK-LIFE BALANCE TERHADAP KESEJAHTERAAN PSIKOLOGIS PADA WORKING MOTHERS Tugas Akhir
Maulida Rahma Britania[13422014]   Prof. Ari Widyanti, S.T., M.T., Ph.D.;


14
PERANCANGAN PERBAIKAN PROSES BISNIS PENGEMBANGAN PROPERTI, PENGADAAN, DAN PENGELOLAAN SUMBER DAYA MANUSIA PADA PT OXO GROUP INDONESIA Tugas Akhir
R.Muhammad Ghaanem[13422004]   Fathiro Hutama Reksa Putra, S.T., M.Sc., Ph.D.;


16
ANALISIS INDIVIDUAL DAN GROUP USABILITY TESTING PADA APLIKASI CANVA Tugas Akhir
Felicia Audy Susanto[13422059]   Prof. Ari Widyanti, S.T., M.T., Ph.D.;

17
OPTIMISASI DISTRIBUSI PRODUK AIR MINUM DALAM KEMASAN (AMDK) PADA PT XYZ Tugas Akhir
Robben A Timbo H Sinurat[13422116]   Dr. Saskia Puspa Kenaka, S.T., M.T.;Dr. Nur Faizatus Sa'idah, S.Si., M.T.;Suprayogi, S.T., M.T., Ph.D.;

18
PERANCANGAN PERBAIKAN PROSES BISNIS PENGEMBANGAN PROPERTI, PENGADAAN, DAN PENGELOLAAN SUMBER DAYA MANUSIA PADA PT OXO GROUP INDONESIA Tugas Akhir
Aria Raspati Jungjunan[13422047]   Fathiro Hutama Reksa Putra, S.T., M.Sc., Ph.D.;

19
IDENTIFIKASI WASTE DAN PERANCANGAN USULAN PERBAIKAN PADA PROSES PRODUKSI SOFTGEL MASSA ISI MINYAK DI PT X DENGAN PENDEKATAN LEAN MANUFACTURING Tugas Akhir
Patricia Agustine Purba[13422089]   Dr. Wisnu Aribowo, S.T., M.T.;Dr. Veterina Nosadila Riaventin, S.T., M.Sc.;

20
PERANCANGAN PERBAIKAN PROSES BISNIS PENGEMBANGAN PROPERTI, PENGADAAN, DAN PENGELOLAAN SUMBER DAYA MANUSIA PADA PT OXO GROUP INDONESIA Tugas Akhir
Reynold Namora Situmorang[13422063]   Fathiro Hutama Reksa Putra, S.T., M.Sc., Ph.D.;