501
EFFECT OF INCORPORATING INTERSECTION DELAYS ON ROUTE ASSIGNMENTS IN AN URBAN ROAD NETWORK Tesis
Emil Ardiaman[]   1
Emil Ardiaman[]   1
502
OPERATIONAL CHARACTERISTICS AND FINANCIAL FEASIBILITY OF OJEG OPERATION Tesis
Djoko Prijanto Agung Pribadi[]   P
Djoko Prijanto Agung Pribadi[]   P
503
IMPACT OF TRIP DISTRIBUTION MODELS ON ESTIMATION OF O-D MATRIX FROM TRAFFIC COUNTS Tesis
Didi Ruswandi[]   1
Didi Ruswandi[]   1
504
DIFFUSION TEST AS AN ALTERNATIVE INDICATOR FOR DURABILITY ASSESSMENT OF BITUMINOUS MIXTURES Tesis
AINE KUSUMAWATI[26997032]   Pembimbing : BAMBANG ISMANTO SISWOSOEBROTHO, ADE S.SJAIRUDOI; Scan : Aep
AINE KUSUMAWATI[26997032]   Pembimbing : BAMBANG ISMANTO SISWOSOEBROTHO, ADE S.SJAIRUDOI; Scan : Aep
505
EFFECT OF DOWNSTREAM OBSTRUCTION ON SATURATION FLOW Tesis
ABDUL RAUF[26996023]   Ir. WILLY TUMEWU, MSc, Ir HEDI HIDAYAT, MSc, Prof Ir TRISNO SOEGONDO, MSCE
ABDUL RAUF[26996023]   Ir. WILLY TUMEWU, MSc, Ir HEDI HIDAYAT, MSc, Prof Ir TRISNO SOEGONDO, MSCE
506
PEDESTRIAN BEHAVIOUR AT A SIGNALISED INTERSECTION IN BANDUNG Tesis
Subarjo[]   Pembimbing: 1.Hedi Hidayat 2. Ade Syafruddin 3.Trisno Soegondo Scan: Mudjiono
Subarjo[]   Pembimbing: 1.Hedi Hidayat 2. Ade Syafruddin 3.Trisno Soegondo Scan: Mudjiono
507
508
509
DEVELOPMENT OF A COMPUTER PROGRAM FOR ANALYSING CUMULATIVE OVERSATURATION OF A SIGNALISED INTERSECTION Tesis
Khalidin[]   Pembimbing I:Titi Liliani.S Pembimbing II:Sri HendartoPembimbing III:Trisno SoegondoScanner: Mudjiono
Khalidin[]   Pembimbing I:Titi Liliani.S Pembimbing II:Sri HendartoPembimbing III:Trisno SoegondoScanner: Mudjiono
510
511
TRIP GENERATION AND PARKING DEMAND FOR ONE MIXED ACTIVITY COMMERCIAL CENTER Tesis
Bagas Subarnowo[]   P
Bagas Subarnowo[]   P
512
EFFECTS OF THE JUNE-1983 AND SEPTEMBER-1985 INCREASES IN TOLL CHARGES ON TRAFFIC FLOWS AND REVENUES: the Jagorawi toll highway Tesis
Agung Rin Prabowo[]   P
Agung Rin Prabowo[]   P
513
RELATIONSHIP BETWEEN TRAVEL SPEED AND FLOW ON A SIGNALIZED ARTERIAL IN BANDUNG Tesis
Yudi Artangali[]   P
Yudi Artangali[]   P
514
515
CAPACITY AND LEVEL OF PERFORMANCE OF MOTORWAY ON-RAMP B AT CAWANG INTERCHANGE, JAKARTA Tesis
Sapto Winarno[]   P
Sapto Winarno[]   P
516
VEHICLE OPERATING COST OF EXPRESS BUSES (PATAS) IN JAKAR Tesis
Putro Agung Nugroho[26994022]   Idwan Santoso ; Ade Sjafruddin ; Trisno Soegondo
Putro Agung Nugroho[26994022]   Idwan Santoso ; Ade Sjafruddin ; Trisno Soegondo
517
OPERATIONAL DELAY AT U-TURN FACILITIES FROM TWO LOCATIONS IN BANDUNG Tesis
Zul Kasturi[26992021]   Willy Tumewu, Ir. M.Sc; Titi Liliani, Ir., M.Sc.
Zul Kasturi[26992021]   Willy Tumewu, Ir. M.Sc; Titi Liliani, Ir., M.Sc.
518
EVALUATION OF NUMBER PLATE AND MOVING CAR OBSERVER SURVEY METHODOLOGIES FOR TWO INTERURBAN ROADS Tesis
Muazzin[]   1
Muazzin[]   1
519
520
EFFECT OF CARRIAGEWAY WIDTH ON OVERTAKING BEHAVIOUR AND SPEED-FLOW RELATIONSHIPS ON TWO-LANE TWO-WAY ROADS Tesis
Prakoso Hadi Takariyanto[]   P
Prakoso Hadi Takariyanto[]   P