digilib@itb.ac.id +62 812 2508 8800
1
USULAN KEBIJAKAN DAN MODEL OPERASIONAL DEPO PETI KEMAS PT X UNTUK MEMINIMASI KOMPONEN WAKTU PUTAR TRUK BERBASIS SIMULASI DAN INTEGER LINEAR PROGRAMMING Tugas Akhir
Naufal Vitoperisa Oktora[13422005]   Dr. Veterina Nosadila Riaventin, S.T., M.Sc.;Muchammad Arya Zamal, S.T., M.Sc., Ph.D.;


3
PERANCANGAN PERBAIKAN PROSES BISNIS LINI PROJECT AND DOWNSTREAM PRODUCT DI PT X MELALUI OPTIMASI PENJADWALAN HYBRID FLOW SHOP DAN PENGEMBANGAN SISTEM ERP Tugas Akhir
Falah Ghassani Ibrahim[13422077]   Muhammad Akbar, S.T., M.T., Ph.D.;Ni Luh Saddhwi Saraswati Adnyani, S.T., M.T.;Fathiro Hutama Reksa Putra, S.T., M.Sc., Ph.D.;



6
PERANCANGAN KOPERASI DESA MERAH PUTIH SEBAGAI AGREGATOR RANTAI PASOK AYAM RAS PEDAGING BERBASIS EKOSISTEM DIGITAL DI KAWASAN TRANSMIGRASI KAMANG BARU Tugas Akhir
Abda Aulul Rahim Pesti[13422095]   Muchammad Arya Zamal, S.T., M.Sc., Ph.D.;Dr. Destina Ratna Asih Khodijah Kadarsah, S.T., M.Sc.;


8
RANCANGAN SCM 4PL MELALUI MRP, PERENCANAAN MANUFAKTUR DAN ALTERNATIF NEGOSIASI, SERTA PENJADWALAN OPERASIONAL GUDANG Tugas Akhir
Muhammad Kevan Rakhajody Syam[13422019]   Dr. Eng. Andi Cakravastia Arisaputra Raja, S.T., M.T.;Ferani Eva Zulvia, S.Si., M.T., Ph.D.;

9
PERANCANGAN KEY PERFORMANCE INDICATOR (KPI) BERBASIS BALANCED SCORECARD PADA MBIENCE FITNESS RAWAMANGUN Tugas Akhir
Gracia Valentine S. Tumanggor[13422102]   Prof. Dr. Ir. Iwan Inrawan Wiratmadja;

10
RANCANGAN SCM 4PL MELALUI MRP, PERENCANAAN MANUFAKTUR DAN ALTERNATIF NEGOSIASI, SERTA PENJADWALAN OPERASIONAL GUDANG Tugas Akhir
Abednego Tambun[13422023]   Dr. Eng. Andi Cakravastia Arisaputra Raja, S.T., M.T.;

11
RANCANGAN SCM 4PL MELALUI MRP, PERENCANAAN MANUFAKTUR DAN ALTERNATIF NEGOSIASI, SERTA PENJADWALAN OPERASIONAL GUDANG Tugas Akhir
Daffara Malika Abdullah[13422011]   Muhammad Akbar, S.T., M.T., Ph.D.;Dr. Eng. Andi Cakravastia Arisaputra Raja, S.T., M.T.;

12
PERANCANGAN KNOWLEDGE MANAGEMENT SYSTEM (KMS) PEMANFAATAN DIATOM ALGA DI INDONESIA Tugas Akhir
Keysha Regina Averyl[13422094]   Dissa Riandaso Chandra, S.T., M.T., Ph.D.;Dr. Destina Ratna Asih Khodijah Kadarsah, S.T., M.Sc.;

13
PERANCANGAN KNOWLEDGE MANAGEMENT SYSTEM (KMS) PEMANFAATAN DIATOM ALGA DI INDONESIA Tugas Akhir
Mohammad Ghani Syahputra[13422064]   Dissa Riandaso Chandra, S.T., M.T., Ph.D.;Dr. Destina Ratna Asih Khodijah Kadarsah, S.T., M.Sc.;

14
PERANCANGAN STRATEGI PEMBELAJARAN TENAGA KEPENDIDIKAN INSTITUT TEKNOLOGI BANDUNG Tugas Akhir
Meiske Nurhaliza Achva[13422085]   Dr. Made Andriani, S.T., M.T.;

15
USULAN RANCANGAN SISTEM WARALABA RUMAH MAKAN SATE WARU Tugas Akhir
Natasha Anindia Putri[13422033]   Prof. Dr. Ir. Joko Siswanto, M.PA.;

16
USULAN RANCANGAN SISTEM WARALABA RUMAH MAKAN SATE WARU Tugas Akhir
Raddien Amadia Putriefna[13422066]   Prof. Dr. Ir. Joko Siswanto, M.PA.;

17
EVALUASI DAN PERANCANGAN STRATEGI MITIGASI KELELAHAN OPERATOR SEKTOR MIGAS DENGAN PENGUKURAN OBJEKTIF DAN SUBJEKTIF Tugas Akhir
Della Jabriel Margareta[13422081]   Putra Alif Ramdhani Yamin, S.T., M.Sc., Ph.D.;



20
PERANCANGAN KOPERASI DESA MERAH PUTIH SEBAGAI AGREGATOR RANTAI PASOK AYAM RAS PEDAGING BERBASIS EKOSISTEM DIGITAL DI KAWASAN TRANSMIGRASI KAMANG BARU Tugas Akhir
Tarisha Alya Zhafira[13422016]   Muchammad Arya Zamal, S.T., M.Sc., Ph.D.;Dr. Destina Ratna Asih Khodijah Kadarsah, S.T., M.Sc.;