digilib@itb.ac.id +62 812 2508 8800
1
STUDI PENGARUH UJI ULANG REAKSI KALSINASI DAN KARBONASI BATU KAPUR TERHADAP KINERJA PENANGKAPAN GAS CO\TEXTSUBSCRIPT{2} Tugas Akhir
Nadir Arrayyan[13121164]   Prof. Dr. Ir. Prihadi Setyo Darmanto;

2
EVALUASI DAMPAK LINGKUNGAN DARI REFRIGERAN BER-GWP TINGGI DAN EKSPLORASI ALTERNATIF BERKELANJUTAN UNTUK REFRIGERASI KOMERSIAL DI INDONESIA Tugas Akhir
Muhammad Attila Farrel Ardan[13121037]   Prof. Ir. Ari Darmawan Pasek, Ph.D.;

3
OPTIMASI ADITIF PAKET DETERJEN PADA BENSIN RON 95 Tugas Akhir
Malik Arkananta Bangsawan[13121031]   Dr.-Ing. Ir. Tri Yuswidjajanto Zaenuri;

4
ANALISIS NUMERIK PENGARUH PENGGUNAAN GURNEY FLAP TERHADAP PERFORMA TURBIN WELLS PROFIL NACA 0020 DI OSCILLATING WATER COLUMN (OWC) Tugas Akhir
Imam Habib Farhan[13119065]   Prof. Ir. Tubagus Ahmad Fauzi Soelaiman, MSME, Ph.D.;Dr.Eng. Ir. Firman Bagja Juangsa, S.T., M.Eng.;

5
ANALISIS PERBANDINGAN KEMUDAHAN PEMBONGKARAN DAN KOMPLEKSITAS PERAKITAN PADA DESAIN BATTERY PACK Tugas Akhir
Raissa Dahayu Purbaningrum[13121189]   Dr.Eng. Bentang Arief Budiman, S.T, M.Eng.;


7
ALGORITMA OPTIMASI PERIODE REMANUFACTURING ENGINE CATERPILLAR 777E DI LAPANGAN PERTAMBANGAN ADARO TUTUPAN Tugas Akhir
Raevan Schonezkiel Sangapta[13121070]   Dr.-Ing. Ir. Tri Yuswidjajanto Zaenuri;


9
THE EFFECT OF MECHANICAL LOADING TO THE LIFETIME OF BALL BEARING SUBJECTED TO ELECTRICAL CURRENT Tugas Akhir
Muhammad Alfiandhika[13121106]   Prof. Ir. Rachman Setiawan, S.T., M.Sc., Ph.D.;Dr. Budi Heryadi, S.T., M.T.;

10
PERANCANGAN, PEMBUATAN, DAN PENGUJIAN ALAT ELEKTRONIK PENGHASIL SINYAL SIMULASI KEYPHASOR UNTUK POROS ANTARA Tugas Akhir
Rizqi Indirsyah Fadhil[13121134]   Prof. Ir. Zainal Abidin, Ph.D.;

11
TOPOLOGY OPTIMIZATION OF TRIPLY PERIODIC MINIMAL SURFACE STRUCTURES FOR HYDROGEN STORAGE APPLICATIONS Tugas Akhir
Arfandi P Santosa[13119250]   Dr.Eng. Bentang Arief Budiman, S.T, M.Eng.;

12
THERMODYNAMIC ANALYSIS OF ADSORPTION FREEZE-DRYING SYSTEM FOR FOOD PRESERVATION Tugas Akhir
Otniel Adi Laksana[13119204]   Prof. Ir. I Made Astina, Ph.D.;

13
PERANCANGAN SISTEM PROPULSI KAPAL PENDARAT TANK 300 KAKI Tugas Akhir
Christopher Sintong S Pasaribu[13119051]   Dr. Techn. Ir. Arief Hariyanto;

14
DEVELOPMENT OF AN AUTOMATED WATER QUALITY CONTROL SYSTEM FOR AQUAPONICS USING LABVIEW Tugas Akhir
Syarif Ahmad Nabil[13119215]   Dr. Budi Heryadi, S.T., M.T.;


16
FREQUENCY DOMAIN APPROACH FOR RAIL VERTICAL PROFILE DETERMINATION USING INERTIAL VEHICLE RESPONSE Tugas Akhir
Muhamad Tauhid[13121206]   Yunendar Aryo Handoko, S.T., Ph.D.;



19
PERANCANGAN SISTEM DAUR ULANG AIR PADA KERETA NEW GENERATION Tugas Akhir
Adri Fathudien[13121161]   Indria Herman, S.T, M.T, Ph.D.;

20
THERMODYNAMIC AND ECONOMIC ASSESSMENT OF SILICA DEPOSITION MITIGATION METHODS AND BOTTOMING CYCLE INTEGRATION IN GEOTHERMAL POWER PLANT: CASE STUDY UNIT I DIENG PAD #A Tugas Akhir
Ananda Azhar Habibie[13120034]   Prof. Ir. Tubagus Ahmad Fauzi Soelaiman, MSME, Ph.D.;Dr.Eng. Ir. Firman Bagja Juangsa, S.T., M.Eng.;