1
PENGEMBANGAN ALGORITMA BARU UNTUK MENINGKATKAN AKURASI PERHITUNGAN NILAI \TEXTIT{ROOT MEAN SQUARE} (RMS) SINYAL GETARAN Tesis
Kevin Angga Gunawan[23117021]   Prof. Ir. Zainal Abidin, Ph.D.;
Kevin Angga Gunawan[23117021]   Prof. Ir. Zainal Abidin, Ph.D.;
2
PERANCANGAN TANGKI PENYIMPANAN LPG DAN ANALISIS SLOSHING AKIBAT BEBAN GEMPA BERDASARKAN SNI 03-1726-2012 Tesis
Aldarifa Putri Nabilah[23120314]   Dr. Ing. Willy Adriansyah, S.T, M.T.;Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
Aldarifa Putri Nabilah[23120314]   Dr. Ing. Willy Adriansyah, S.T, M.T.;Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
3
STUDI PENGARUH PERUBAHAN TEKANAN OPERASI KONDENSORTERHADAP KINERJA GAS REMOVAL SYSTEM Tesis
Estrela Bellia Muaja[23119001]   Dr. Ing. Willy Adriansyah, S.T, M.T.;
Estrela Bellia Muaja[23119001]   Dr. Ing. Willy Adriansyah, S.T, M.T.;
4
PENGEMBANGAN METODE TIME SYNCHRONOUS AVERAGING YANG DILENGKAPI DENGAN METODE MACHINE LEARNING UNTUK MEMINIMALKAN JUMLAH PERATA-RATAAN Tesis
M. Nasirudin[23120311]   Prof. Ir. Zainal Abidin, Ph.D.;
M. Nasirudin[23120311]   Prof. Ir. Zainal Abidin, Ph.D.;
5
PERANCANGAN SEPEDA MOTOR LISTRIK SEGALA MEDAN UNTUK KEBUTUHAN SURVEILLANCE DAN INFILTRASI MILITER Tesis
Amirul Siddiq Mirza[23120320]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
Amirul Siddiq Mirza[23120320]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
6
OPTIMASI FABRIKASI PERMUKAAN SUPERHIDROPHOBIK UNTUK PENGHASIL AIR ATMOSFERIK BERBASIS TERMOELEKTRIK Tesis
Nur Hasyyati Luqiyana[23120018]   Dr.Eng. Pandji Prawisudha;Poetro Lebdo Sambegoro, M.Sc., Ph.D.;Dr.Eng. Ir. Firman Bagja Juangsa, S.T., M.Eng.;
Nur Hasyyati Luqiyana[23120018]   Dr.Eng. Pandji Prawisudha;Poetro Lebdo Sambegoro, M.Sc., Ph.D.;Dr.Eng. Ir. Firman Bagja Juangsa, S.T., M.Eng.;
7
PENGEMBANGAN KERANGKA KERJA SISTEM PEMANTAUAN PROSES PEMBUATAN DOKUMEN PRODUK: STUDI KASUS INDUSTRI KERETA API Tesis
Yunandaru Sahid Putra[23120035]   Dr. Ir. Sri Raharno, S.T, M.T.;
Yunandaru Sahid Putra[23120035]   Dr. Ir. Sri Raharno, S.T, M.T.;
8
PENGEMBANGAN KERANGKA KERJA SISTEM INFORMASI PEMANTAUAN AKTIVITAS INSPEKTUR PENGUJI : STUDI KASUS PROSES PENGUJIAN PRODUK AKHIR MANUFAKTUR KERETA API Tesis
Dian Yudha Prasetiawan[23120013]   Dr. Ir. Sri Raharno, S.T, M.T.;
Dian Yudha Prasetiawan[23120013]   Dr. Ir. Sri Raharno, S.T, M.T.;
9
PENGEMBANGAN KERANGKA KERJA SISTEM TERINTEGRASI PEMANTAU KEMAJUAN PRODUKSI: STUDI KASUS MANUFAKTUR KERETA API Tesis
Farinda Cesarizka Rahmita[23120003]   Dr. Ir. Sri Raharno, S.T, M.T.;
Farinda Cesarizka Rahmita[23120003]   Dr. Ir. Sri Raharno, S.T, M.T.;
10
PENGEMBANGAN KERANGKA KERJA PENGELOLAAN PROSES DESAIN BERBASIS SMART DESIGN MANAGEMENT (SDM):STUDI KASUS DESAIN KERETA API Tesis
M. Evan Wiryawan[23120037]   Dr. Ir. Sri Raharno, S.T, M.T.;
M. Evan Wiryawan[23120037]   Dr. Ir. Sri Raharno, S.T, M.T.;
11
OPTIMALISASI PENYUSUNAN OPERASI PEKERJAAN PERAKITAN AKHIR MENGGUNAKAN KERANGKA KERJA CONFIGURABLE VIRTUAL WORKSTATION SYSTEM (CVWS) DI PERUSAHAAN MANUFAKTUR KERETA API Tesis
Prasetya Hutama Putra Perkasa[23120007]   Dr. Ir. Sri Raharno, S.T, M.T.;
Prasetya Hutama Putra Perkasa[23120007]   Dr. Ir. Sri Raharno, S.T, M.T.;
12
PENGEMBANGAN MODUL PENYERAP ENERGI IMPAK TIPE PIPA PRE-INVERTED Tesis
Kevin Putranda[23120323]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
Kevin Putranda[23120323]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;
13
PENGEMBANGAN KERANGKA KERJA SISTEM PEMANTAUAN DAN PENGELOLAAN DATA MATERIAL: STUDI KASUS INDUSTRI MANUFAKTUR KERETA API Tesis
Dedy Kurniawan[23120016]   Dr. Ir. Sri Raharno, S.T, M.T.;
Dedy Kurniawan[23120016]   Dr. Ir. Sri Raharno, S.T, M.T.;
14
ANALISIS KEKUATAN LELAH POROS TRANSMISI AMPHIBIOUS EXCAVATOR KAPASITAS 13 TON Tesis
Readya Adhiwidya Respati[23120306]   Ir. M. Agus Kariem, S.T, M.T, Ph.D., IPM;
Readya Adhiwidya Respati[23120306]   Ir. M. Agus Kariem, S.T, M.T, Ph.D., IPM;
15
RANCANGAN KONSEP UNTUK PENDISTRIBUSIAN SUMBER DAYA MANUSIA PADA INDUSTRI MANUFAKTUR KERETA API PADAT KARYA Tesis
Yudha Kartika Wijaya[23120020]   Dr. Ir. Sri Raharno, S.T, M.T.;
Yudha Kartika Wijaya[23120020]   Dr. Ir. Sri Raharno, S.T, M.T.;
16
PENGEMBANGAN KERANGKA KERJA SISTEM MANAJEMEN MATERIAL : STUDI KASUS INDUSTRI MANUFAKTUR KERETA API Tesis
Luqman Kumara[23120006]   Dr. Ir. Sri Raharno, S.T, M.T.;
Luqman Kumara[23120006]   Dr. Ir. Sri Raharno, S.T, M.T.;
17
PENGEMBANGAN KERANGKA KERJA PENJADWALAN ADAPTIF UNTUK INDUSTRI MANUFAKTUR PADAT KARYA Tesis
Yanto[23120042]   Dr. Ir. Sri Raharno, S.T, M.T.;
Yanto[23120042]   Dr. Ir. Sri Raharno, S.T, M.T.;
18
PENGEMBANGAN KERANGKA KERJA SISTEM DISTRIBUSI DOKUMEN DAN PENGELOLAAN PERUBAHAN DESAIN: STUDI KASUS INDUSTRI MANUFAKTUR KERETA API Tesis
Roy Pradhana[23120038]   Dr. Ir. Sri Raharno, S.T, M.T.;
Roy Pradhana[23120038]   Dr. Ir. Sri Raharno, S.T, M.T.;
19
MITIGASI KEBISINGAN RODA KERETA LRT JABODEBEK MELALUI PENGGUNAAN PEREDAM BERLAPIS TERBATAS DAN SKEMA PERFORASI Tesis
Moh Faza Rosyada[23120024]   Prof. Ir. Zainal Abidin, Ph.D.;Iwan Prasetiyo, S.T, M.T, Ph.D.;
Moh Faza Rosyada[23120024]   Prof. Ir. Zainal Abidin, Ph.D.;Iwan Prasetiyo, S.T, M.T, Ph.D.;
20
PENGARUH KONTROL PID TERHADAP RESPON TERMAL ALAT PENUKAR PANAS PADA KOLAM RESIRKULASI IKAN LELE Tesis
Iqbal Muwahid[23120040]   Jooned Hendrarsakti, Ph.D.;
Iqbal Muwahid[23120040]   Jooned Hendrarsakti, Ph.D.;