1
INTEGRATED YOUTH REHABILITATION CENTER: FASILITAS PENDUKUNG PSIKOLOGIS SEBAGAI RESPON DARI TINGGINYA TINGKAT STRES DI KOTA BANDUNG Tugas Akhir
Adeline Alika Putri Marwah[15218061]   Rr. Diah Asih Purwaningrum, S.T., M.T., Ph.D.;
Adeline Alika Putri Marwah[15218061]   Rr. Diah Asih Purwaningrum, S.T., M.T., Ph.D.;
2
DE-INSTITUSIONALISASI DAN PENERAPAN DESAIN BERBASIS KOMUNITAS DAN LINGKUNGAN THERAPEUTIC PADA FASILITAS REHABILITASI NARKOBA DI SENTUL, BOGOR Tugas Akhir
Puti Osfiani Mawangi[15217049]   Dr. Ir. Lily Tambunan, M.T.;
Puti Osfiani Mawangi[15217049]   Dr. Ir. Lily Tambunan, M.T.;
3
HEALTHFUL TRAVELLING: PERANCANGAN RESORT SEBAGAI SARANA WELLNESS TOURISM DI TEGALLANG BALI Tugas Akhir
Clara Adam Sugiharto[15219005]   Dr. Ing. Erika Yuni Astuti, S.T, M.T.;
Clara Adam Sugiharto[15219005]   Dr. Ing. Erika Yuni Astuti, S.T, M.T.;
4
CIPUTRI ECO RESORT, PALUTUNGAN SEBAGAI WISATA STAYCATION DI KUNINGAN, JAWA BARAT Tugas Akhir
Hafiyyani Fathin Mazaya[15218043]   Dr. Ir. Lily Tambunan, M.T.;
Hafiyyani Fathin Mazaya[15218043]   Dr. Ir. Lily Tambunan, M.T.;
5
CHILD PROTECTION CENTER : PUSAT PERLINDUNGAN DAN REHABILITASI TRAUMA PADA ANAK KORBAN KEKERASAN DI KOTA BANDUNG Tugas Akhir
Yumna Yusro[15219010]   Rr. Diah Asih Purwaningrum, S.T., M.T., Ph.D.;
Yumna Yusro[15219010]   Rr. Diah Asih Purwaningrum, S.T., M.T., Ph.D.;
6
THE DYING ARE STILL LIVING: CHILDREN HOSPICE CARE BAGI PASIEN ANAK YANG MEMILIKI PENYAKIT TERMINAL DENGAN PENDEKATAN SALUTOGENESIS Tugas Akhir
Hanasalvina Mulyanto[15219012]   Dr. Eng. Hanson Endra Kusuma, S.T, M.Eng.;
Hanasalvina Mulyanto[15219012]   Dr. Eng. Hanson Endra Kusuma, S.T, M.Eng.;
7
CREATIVE PLACEMAKING: CULTURAL CENTER IN SETU BABAKAN BETAWI VILLAGE, JAKARTA Tugas Akhir
Sahlan Alfarizi[15219041]   Indah Widiastuti, S.T, M.T, Ph.D.;
Sahlan Alfarizi[15219041]   Indah Widiastuti, S.T, M.T, Ph.D.;
8
RUMAH SUSUN SEDERHANA MASYARAKAT BERPENGHASILAN RENDAH (MBR) Tugas Akhir
Adisty Kanastari[15204017]   Mohammad Jehansyah Siregar, S.T, M.T, Ph.D.;
Adisty Kanastari[15204017]   Mohammad Jehansyah Siregar, S.T, M.T, Ph.D.;
9
PERANCANGAN URBAN FOOD HUB DI CIROYOM, BANDUNG Tugas Akhir
Fran William[15217069]   Dr. Ir. Lily Tambunan, M.T.;
Fran William[15217069]   Dr. Ir. Lily Tambunan, M.T.;
10
BELONGING THE UNBELONGS: SEKOLAH TUKANG SEBAGAI RUMAH, TEMPAT BELAJAR DAN INSTITUSI SOSIAL DENGAN PENDEKATAN SENSE OF BELONGING Tugas Akhir
Alya Hanum Asyara[15219006]   Tubagus Muhammad Aziz Soelaiman, S.T, M.A.;
Alya Hanum Asyara[15219006]   Tubagus Muhammad Aziz Soelaiman, S.T, M.A.;
11
SUSTAINABLE BUSINESS HEADQUARTERS: PERANCANGAN KANTOR PUSAT BERKELANJUTAN DENGAN PENDEKATAN LOW ENERGY BUILDING Tugas Akhir
Santika Devi Permata[15219008]   Ir. Robby Dwiko Juliardi, M.T., Ph.D.;
Santika Devi Permata[15219008]   Ir. Robby Dwiko Juliardi, M.T., Ph.D.;
12
STASIUN KERETA API KIARACONDONG BANDUNG Tugas Akhir
Adwitya Dimas S[15204009]   Dr. Ing. Ir. Heru Wibowo Poerbo, MURP.;
Adwitya Dimas S[15204009]   Dr. Ing. Ir. Heru Wibowo Poerbo, MURP.;
13
SENEN INTEGRATED TRANSIT: TERMINAL BUS TERPADU DI KAWASAN SENEN Tugas Akhir
Wynona Ariella[15219007]   Tubagus Muhammad Aziz Soelaiman, S.T, M.A.;
Wynona Ariella[15219007]   Tubagus Muhammad Aziz Soelaiman, S.T, M.A.;
14
FUTURE OF AGEING: MULTIGENERATIONAL HOUSING AS ANTIDOTE TO THE LONELINESS OF SENIORS Tugas Akhir
Raisha Moira Shaqinna[15219075]   Mohammad Jehansyah Siregar, S.T, M.T, Ph.D.;
Raisha Moira Shaqinna[15219075]   Mohammad Jehansyah Siregar, S.T, M.T, Ph.D.;
15
PERANCANGAN KANTOR SEWA HEMAT ENERGI DENGAN PENDEKATAN ARSITEKTUR BIOKLIMATIK Tugas Akhir
Asri Adam[15219023]   Ir. Robby Dwiko Juliardi, M.T., Ph.D.;
Asri Adam[15219023]   Ir. Robby Dwiko Juliardi, M.T., Ph.D.;
16
TRANSFORMING TRAUMA THROUGH HEALING SPACES: FASILITAS RUMAH SINGGAH SEBAGAI SARANA PEMBERDAYAAN BAGI WANITA PENYINTAS KEKERASAN DALAM RUMAH TANGGA (KDRT), DKI JAKARTA Tugas Akhir
Merisa Serfa Nazar Imani A.[15219032]   Annisa Safira Riska, S.Ars., M.Ars.;
Merisa Serfa Nazar Imani A.[15219032]   Annisa Safira Riska, S.Ars., M.Ars.;
17
ARSITEKTUR SEBAGAI PEDAGOGI: RUMAH PENDIDIKAN ANAK USIA DINI DI PULOGADUNG, JAKARTA TIMUR Tugas Akhir
Ghina Edfalsya[15219050]   Dr. Allis Nurdini, S.T, M.T.;
Ghina Edfalsya[15219050]   Dr. Allis Nurdini, S.T, M.T.;
18
SASAK CULTURAL CENTER: PENGHUBUNG KEPENTINGAN PELESTARIAN BUDAYA DAN PARIWISATA Tugas Akhir
Adha Ika Putri Nabila[15219015]   Dr. Eng. Bambang Setia Budi, S.T, M.T.;
Adha Ika Putri Nabila[15219015]   Dr. Eng. Bambang Setia Budi, S.T, M.T.;
19
SINEMA ALTERNATIF: SIMBIOSIS DALAM SKENA FILM BANDUNG Tugas Akhir
Imaniyah Sabita[15219069]   Dr.-Ing. Andry Widyowijatnoko, S.T, M.T.;
Imaniyah Sabita[15219069]   Dr.-Ing. Andry Widyowijatnoko, S.T, M.T.;
20
LINTONG COFFEE SHELTER: IMPROVING THE LOCAL COFFEE CHAIN THROUGH THE DEVELOPMENT OF COFFEE PROCESSING, EDUCATION, AND LEISURE CENTER Tugas Akhir
Christy Immanuela Roulina[15219044]   Widiyani, S.T., M.T., Ph.D.;
Christy Immanuela Roulina[15219044]   Widiyani, S.T., M.T., Ph.D.;