digilib@itb.ac.id +62 812 2508 8800

2
POTENSI KONFLIK SOSIAL PADA RENCANA PEMBANGUNAN BUS RAPID TRANSIT (BRT) BANDUNG STUDI KASUS: KORIDOR OTISTA â SUDIRMAN Tesis
Stephanie Margarettha S. S.[24224013]   Prof. Dr. Miming Miharja, S.T., M.Sc.Eng.;




6
KOLABORASI DALAM PENYEDIAAN HALTE BUS RAPID TRANSIT (BRT) DI KAWASAN CEKUNGAN BANDUNG Tesis
Kharaz Aljauzi Adam[24223001]   Prof. Dr. Miming Miharja, S.T., M.Sc.Eng.;



9
ANALISIS PREFERENSI PENUMPANG DAN MASKAPAI DALAM MEMILIH BANDARA PADA KAWASAN MULTIPLE AIRPORT REGION (MAR) DI SEKITAR JAKARTA DAN JAWA BARAT Tesis
Marisya Aurora Destiany[24223015]   Prof. Dr. Ir. Heru Purboyo Hidayat Putro, D.E.A.;

10
EKSPLORASI PELANGGARAN PARKIR PADA TEPI JALAN UMUM DI KOTA BANDUNG BERDASARKAN PERSPEKTIF PENGENDARA KENDARAAN BERMOTOR Tesis
Bima Willy Anto[24223012]   Dr. Eng. Puspita Dirgahayani, S.T, M.Eng.;

11
POTENSI PERALIHAN MODA KE KERETA API DALAM KONTEKS RENCANA REAKTIVASI LAYANAN KORIDOR SUKABUMI â BANDUNG Tesis
Ervan Aji Jaya Azis[24223006]   Dr. Eng. Puspita Dirgahayani, S.T, M.Eng.;





16
ANALISIS PERSEPSI DAN PREFERENSI MULTIGENERASI TERHADAP PEMILIHAN MODA DI KOTA BANDUNG Tesis
M. Ikhwan Wajdi[24223014]   Dr.Eng. Maya Safira, S.T., M.T.;

17
COST-BENEFIT ANALYSIS PENGGUNAAN SUSTAINABLE AVIATION FUELS (SAF) DI INDONESIA Tesis
Fadel Muhammad Haris[24223004]   Prof. Dr. Eng. Pradono, S.E, M.Ec.Dev.;