digilib@itb.ac.id +62 812 2508 8800
121
OPTIMASI PRODUKSI PADA RESERVOIR GAS MULTILAYERED BERDASAR NODAL ANALYSIS MENGGUNAKAN DOWNHOLE CONTROL VALVES Tugas Akhir
Novrian Harits Firmansyah[12218014]   Prof. Ir. Taufan Marhaendrajana, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.;

122
RATE OF PENETRATION PREDICTION IN OIL FIELD DRILLING USING MACHINE LEARNING Tugas Akhir
Melani Ere[12218007]   Dimas Taha Maulana, S.T., M.T.;Zuher Syihab, S.T., Ph.D.;

123
ALKALI-FREE SURFACTANT MIXTURE PERFORMANCE FOR CHEMICAL ENHANCED OIL RECOVERY WITHOUT COSOLVENT Tugas Akhir
Hendy Pradana Bayu Saputra[12218001]   Prof. Ir. Pudji Permadi, M.Sc., Ph.D.;Ivan Kurnia, S.T., M.Sc.;

124
PRESSURE TRANSIENT ANALYSIS ON TWO-PHASE GEOTHERMAL WELL: A CASE STUDY OF TEST DURATION IN WELL âœXâ Tugas Akhir
Ghozyan Maududi[12217006]   Dimas Taha Maulana, S.T., M.T.;

125
POROSITY PREDICTION USING MACHINE LEARNING MODEL: A CASE STUDY ON FIELD X Tugas Akhir
Fahmi Satrio Pinandito[12216011]   Dr. Dedy Irawan, S.T., M.T.;Muhammad Arif Naufaliansyah, B.Eng., M.Eng.Sc.;



128
DEEP REINFORCEMENT LEARNING FOR OPTIMIZATION OF WATERFLOOD OPERATIONAL PARAMETERS FROM PIXELS Tugas Akhir
Muhammad Yusran Yunus[12218022]   Dr.Eng. Ir. Sutopo, M.Eng.;;

129
OPTIMUM WELL SPACING ESTIMATION FOR CO2 FLOODING USING PREDICTIVE FUNCTION Tugas Akhir
M. Afra Dzaki[12218054]   Zuher Syihab, S.T., Ph.D.;Muhammad Bhakti Setiawan, S.T., M.T.;;

130
WELL PERFORMANCE FAST SCREENING ANALYSIS USING HETEROGENEITY INDEX (HI) METHOD TO DEMONSTRATE PRODUCTION GAIN OPPORTUNITIES: A CASE STUDY IN âœFâ FIELD Tugas Akhir
Fabian Shadiq Priyandi[12218071]   Dr. Amega Yasutra, S.T., M.T.;Pahala Dominicus Sinurat, S.T., M.Sc.;;

131
APPLICATION OF ANALYTICAL METHOD IN FORECASTING POLYMER INJECTIVITY OF POLYMER FLOOD IN FIELD X, INDONESIA Tugas Akhir
Yudha Cipta Maulana Yusuf[12219601]   Prof. Ir. Taufan Marhaendrajana, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.;;

132
WATERFLOOD OPTIMIZATION IN MATURE WATERFLOODED FIELD USING CAPACITANCE-RESISTIVE MODEL Tugas Akhir
Umarul Muhammad[12218025]   Zuher Syihab, S.T., Ph.D.;

133
UNSCHEDULED EVENT STANDARDIZATION: RECONCILE DRILLING AND COMPLETION PROBLEM CODE TO ENHANCE DATA ANALYSIS AND DECISION CORRECTION BY MACHINE LEARNING APPROACH Tugas Akhir
Irsyah Dillah Ababil[12218066]   Dimas Taha Maulana, S.T., M.T.;Freddy Frinly Rizki Tarigan, S.T.;;



136
WELL CANDIDATE SELECTION AND DESIGN OPTIMIZATION FOR HYDRAULIC FRACTURING OPERATION IN FIELD âœXâ Tugas Akhir
Mochammad Dicky Riza[12218075]   Dr . Ir Amega Yasutra, S.T., M.T.;Ardhi Hakim Lumban Gaol S.T., M.Si., Ph.D.;;

137
TECHNO-ECONOMIC FEASIBILITY STUDY OF âœXâ GEOTHERMAL FIELD DEVELOPMENT PLAN BASED ON RESERVES PROBABILITIES USING MONTE CARLO SIMULATION Tugas Akhir
Farisa Emilia Yudistira[12218060]   Dimas Taha Maulana, S.T., M.T.;Angga Bakti Pratama, S.Si., M.T.;;

138
CO2 STORAGE CAPACITY ESTIMATION IN DEPLETED GAS RESERVOIR USING PROBABILISTIC ASSESSMENT AND RESERVOIR SIMULATION Tugas Akhir
Adryan Samuel Hutagalung[12218009]   Prof. Ir. Doddy Abdassah, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.;;

139
PENINGKATAN PERHITUNGAN BEBAN PERFORATED LINER DALAM SUMUR PRODUKSI GEOTERMAL Tugas Akhir
Alfredo Ramasurya Wony's[12218078]   Dr.-Ing. Bonar Tua Halomoan Marbun.;;

140