digilib@itb.ac.id +62 812 2508 8800
101
DESIGNING CRITERIA FOR SELECTING OPTIMUM WELL LOCATION FOR CCS IMPLEMENTATION: CASE STUDY IN "S" FIELD Tugas Akhir
Thariq Kemal[12219002]   Prof. Ir. Asep Kurnia Permadi, M.Sc., Ph.D.;Egi Adrian Pratama, S.T.;


103
PERAMALAN IPR SUMUR YANG DIPENGARUHI PRODUKSI SUMUR SEKITARNYA Tugas Akhir
Alfianto Perdana Putra[12203048]   Pudjo Sukarno, Dr.;Amega Yasutra, MS

104
STUDI INTERPRETASI LOG RESISTIVITY DALAM DETEKSI REKAHAN Tugas Akhir
ALFONSO RIANTINO[12202051]  

105
PENAMBAHAN COSOLVENT PADA SURFAKTAN ZWITTERIONIC-ANIONIC UNTUK MEMFORMULASI SURFAKTAN BERPERFORMA TINGGI Tugas Akhir
Abdurrahman Wahid[12218044]   Prof. Ir. Pudji Permadi, M.Sc., Ph.D.;Ivan Kurnia, S.T., M.Sc., Ph.D.;



108
INTEGRATED RESERVE ESTIMATION AND PRODUCTION PREDICTION OF COMBINATION DRIVE RESERVOIR WITH TWO COMPARTMENTS â CASE STUDY: FIELD X Tugas Akhir
M. Fajril Afkaar Ali Muchtar[12218050]   Prof. Ir. Taufan Marhaendrajana, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.; Indra Sanjaya, S.T.

109
PRODUCTION FORECASTING USING ARPS DECLINE CURVE MODEL WITH THE EFFECT OF ARTIFICIAL LIFT INSTALLATION Tugas Akhir
Farrah Maurenza[12218048]   Dr. Amega Yasutra, S.T., M.T.;Johan Iswara Lumban Tungkup, S.T.;

110
INVESTIGATION OF GAS LIFT STABILITY IN FIELD X USING ALHANATI, ASHEIM STABILITY CRITERION & FLOW PATTERN MAP Tugas Akhir
Pramesty Mahacakri[12218047]   Steven Chandra, S.T., M.T.;

111
ANALISIS PRESSURE, TEMPERATURE, SPINNER (PTS) PADA SUMUR MULTIFASA DI LAPANGAN ULUMBU UNTUK MENENTUKAN KUALITAS FEEDZONE Tugas Akhir
Chrisman William Tambunan[12216031]   Dimas Taha Maulana, S.T., M.T.;

112
EFFECT OF GAS COMPONENTS ON CO2 STORAGE CAPACITY ESTIMATION IN SUBSIDENCE-DEPLETED GAS RESERVOIR Tugas Akhir
Muhammad Rafif Hasnum[12218094]   Dr. Dedy Irawan, S.T., M.T.;Pahala Dominicus Sinurat, S.T., M.Sc.Ph.D.;


114
PREDICTING FUTURE GAS WELL INFLOW PERFORMANCE RELATIONSHIP ON UNCONVENTIONAL RESERVOIR Tugas Akhir
Michael Dwi Febrian Manik[12218080]   Dr. Amega Yasutra, S.T., M.T.;

115
GAS FIELD PRODUCTION FORECASTING USING TANK MATERIAL BALANCE WITH WATER INFLUX : A CASE STUDY IN FIELD âœTâ Tugas Akhir
Gregorius Gilang R A[12218076]   Prof. Ir. Taufan Marhaendrajana, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.;BELLANIA SRIKANDI, S.T.;

116
A ROBUST PREDICTIVE MODEL OF OIL PRODUCTION WITH CYCLIC STEAM STIMULATION Tugas Akhir
Inggis Berlianta Sinaga[12218074]   Zuher Syihab, S.T., Ph.D.;

117
ASSISTED HISTORY MATCHING AND PROBABILISTIC FORECASTING FOR âœXâ FIELD Tugas Akhir
Azrul Yaqin[12218069]   Dr.Eng. Ir. Sutopo, M.Eng.;

118
PREDICTION OF WATER SATURATION FROM PRODUCTION DATA USING MACHINE LEARNING Tugas Akhir
Muhammad Zaki Bil Iman[12218039]   Dr. Amega Yasutra, S.T., M.T.;

119
INTEGRATED RESERVOIR CHARACTERIZATION FROM WELL LOG DATA USING MACHINE LEARNING ALGORITHMS Tugas Akhir
Muhammad Benny Setyo Nugroho[12218034]   Dr. Dedy Irawan, S.T., M.T.;Pahala Dominicus Sinurat, S.T., M.Sc.;

120
APLIKASI MODEL MATERIAL BALANCE UNTUK PERAMALAN PRODUKSI SHALE OIL DENGAN INJEKSI SOLVENT HUFF-AND-PUFF Tugas Akhir
Radifan Ahmad Surya Cendekia[12218030]   Prof. Ir. Doddy Abdassah, M.Sc., Ph.D.;Billal Maydika Aslam, S.T., M.T.;