1
STUDI KARAKTERISTIK ARUS BOCOR PADA ISOLATOR 150 KV TERKOROSI: STUDI KASUS JALUR GOMBONG-RAWALO-KESUGIHAN MENGGUNAKAN SIMULASI KOMPUTER Tugas Akhir
Adella Savira Putri[18018017]   Prof. Dr. Ir. Suwarno, M.T.;
Adella Savira Putri[18018017]   Prof. Dr. Ir. Suwarno, M.T.;
2
PERANCANGAN SISTEM PLTS HIBRIDA OFF-GRID UNTUK REVERSE OSMOSIS DI PULAU KARYA, KEPULAUAN SERIBU Tugas Akhir
Alexius Ricky P.[18019011]   Ir. Burhanuddin Halimi, S.T, M.T, Ph.D.;
Alexius Ricky P.[18019011]   Ir. Burhanuddin Halimi, S.T, M.T, Ph.D.;
3
PERANCANGAN SISTEM PROTEKSI PETIR PADA TANGKI MINYAK DAN GAS MENGGUNAKAN 3-D MODELLING ROLLING SPHERE METHOD Tugas Akhir
Julianto Theng[18020003]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;Bryan Denov, S.T., M.T.;
Julianto Theng[18020003]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;Bryan Denov, S.T., M.T.;
4
PERANCANGAN OPTIMASI PARAMETER PSS2B MENGGUNAKAN TOOLBOX ALGORITMA GENETIK DENGAN INTERFACE MATLAB DAN DIGSILENT Tugas Akhir
Rofi Maytsa Syahida[18020017]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Rofi Maytsa Syahida[18020017]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
5
PERANCANGAN SISTEM PROTEKSI PETIR PADA TANGKI MINYAK DAN GAS MENGGUNAKAN 3-D MODELLING ROLLING SPHERE METHOD Tugas Akhir
Dwisyah Ahmad Rizky[18020014]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Dwisyah Ahmad Rizky[18020014]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
6
PERANCANGAN PEMBANGKIT LISTRIK TENAGA NUKLIR BERBASIS MICROREACTOR UNTUK DEDIESELISASI DI PULAU BUNGURAN Tugas Akhir
Muhammad Ayhan Adit Pratama[18019031]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Muhammad Ayhan Adit Pratama[18019031]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
7
DESAIN PENINGKATAN DAYA KELUARAN PHOTOVOLTAIC POWER PLANT DENGAN SOLAR TRACKER Tugas Akhir
Agya Sadhana[18020015]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Agya Sadhana[18020015]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
8
DESAIN SISTEM PENGUKURAN PARTIAL DISCHARGE MENGGUNAKAN BERAGAM ANTENA Tugas Akhir
Khalisa Prabhasalma[18020020]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Khalisa Prabhasalma[18020020]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
9
ANALISIS DESAIN DAN PERFORMANSI SISTEM PV ON-GRID GILI TRAWANGAN 200 KWP: OPTIMASI ORIENTASI, KONFIGURASI MODUL, DAN INVERTER Tugas Akhir
Dendiza Abdillah Prazos[18018028]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;
Dendiza Abdillah Prazos[18018028]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;
10
DESAIN DAN IMPLEMENTASI LOW NOISE AMPLIFIER (LNA) DENGAN RENTANG FREKUENSI 0,3 - 3000 MHZ SEBAGAI PENGUAT DALAM PENGUKURAN PARTIAL DISCHARGE Tugas Akhir
Handrata Roy Josia[18020006]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Handrata Roy Josia[18020006]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
11
PERANCANGAN DAN ANALISIS PENGARUH JUMLAH, JARAK, DAN KONFIGURASI STASIUN TERHADAP KESALAHAN LOKASI SISTEM PEMETAAN PETIR 3 DIMENSI Tugas Akhir
Satria Ibtihal Wibisono[18020018]   Ir. Syarif Hidayat, M.T, Ph.D.;
Satria Ibtihal Wibisono[18020018]   Ir. Syarif Hidayat, M.T, Ph.D.;
12
PERANCANGAN PENDINGIN PADA PANEL SURYA MENGGUNAKAN GABUNGAN HEATPIPE DAN HEATSINK UNTUK MENINGKATKAN DAYA KELUARAN Tugas Akhir
Mukti Hasanain[18019025]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Mukti Hasanain[18019025]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
13
PERANCANGAN SISTEM PEMBANGKIT LISTRIK TENAGA HIBRIDA UNTUK SUBMERSIBLE PUMP DI IKN NUSANTARA Tugas Akhir
Prabowo[18020007]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Prabowo[18020007]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
14
ANALISIS PEMANFAATAN OFF GAS POWER PLANT UNTUK MANUFAKTUR PETROKIMIA Tugas Akhir
Muhammad Dzaki Akbar[18020004]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Muhammad Dzaki Akbar[18020004]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
15
ANALISIS DAN PENINGKATAN DESAIN PERLINDUNGAN JARINGAN TRANSMISI TEGANGAN TINGGI DENGAN SISTEM PENTANAHAN TERPISAH TERARAH Tugas Akhir
Fadlin Izhar Tarigan[18020013]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Fadlin Izhar Tarigan[18020013]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
16
DESAIN GABUNGAN HEAT SINK DAN PHASE CHANGE MATERIAL SEBAGAI METODE PENDINGINAN PASIF PADA SOLAR PHOTOVOLTAIC Tugas Akhir
Muhammad Naufal Wahyu Athallah[18020016]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Muhammad Naufal Wahyu Athallah[18020016]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
17
ANALISIS ENERGY, ECONOMY, AND ENVIRONMENT (3E) PEMBANGKIT LISTRIK BERBAHAN BAKAR GAS BUANG INDUSTRI BAJA Tugas Akhir
Hebert Arthur Sigiro[18020010]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Hebert Arthur Sigiro[18020010]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
18
DESAIN PENEMPATAN GRID-FORMING DAN GRID- FOLLOWING UNITS PADA LOW-INERTIA SYSTEM Tugas Akhir
Jeffrey Aleandro Permana[18018037]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;
Jeffrey Aleandro Permana[18018037]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;
19
PERANCANGAN INVERTER SATU FASA MODE BUCK BERBASISI KONVERTER BUCK-BOOST YANG DIMODIFIKASI SEBAGAI SEL DASAR Tugas Akhir
M. Pindhan Bhaskoro Hanendro B[18020002]   Dr. Arwindra Rizqiawan, S.T, M.T.;
M. Pindhan Bhaskoro Hanendro B[18020002]   Dr. Arwindra Rizqiawan, S.T, M.T.;
20
PERANCANGAN SISTEM DC MICROGRID DENGAN TOPOLOGI CLUSTER UNTUK DAERAH 3T Tugas Akhir
Agustinus Yudhistira.W.S[18020005]   Dr. Arwindra Rizqiawan, S.T, M.T.;
Agustinus Yudhistira.W.S[18020005]   Dr. Arwindra Rizqiawan, S.T, M.T.;