digilib@itb.ac.id +62 812 2508 8800


1
ANALISA KEPUTUSAN INVESTASI UNTUK PROYEK LNG HUB BONTANG Tesis
Dedi Permana[29119569]   Ir. Gatot Yudoko, M.A.Sc., Ph.D.;

2
USULAN STRATEGI PEMASARAN UNTUK PESAWAT CN235-220 DI KAWASAN AMERIKA LATIN DAN AFRIKA Tesis
Mita Permanasari[29119254]   Dr. Ir. Mustika Sufiati, M.Sc.;

3

4
OPTIMASI KINERJA OPERASIONAL MELALUI MANAJEMEN PENGETAHUAN: SEBUAH STUDI KASUS DI DIVISI OPERASI DICODING Tesis
Shelly Victory[29123307]   Muhammad Yorga Permana, S.T., M.Sc., Ph.D.;

5
OPTIMASI KINERJA OPERASIONAL MELALUI MANAJEMEN PENGETAHUAN: SEBUAH STUDI KASUS DI DIVISI OPERASI DICODING Tesis
Shelly Victory[29123307]   Muhammad Yorga Permana, S.T., M.Sc., Ph.D.;



8
EKPLORASI STRATEGI PEMASARAN UNTUK MENINGKATKAN PENJUALAN UNTUK BAJA PERKASA ROOF Tesis
Dhidhi Indra Permana[29123020]   Prawira Fajarindra Belgiawan, S.T, M.Eng., Ph.D.;

9
IMPLEMENTASI STRATEGI INVESTASI LO KHENG HONG UNTUK MEMBANGUN PORTOFOLIO SAHAM YANG OPTIMAL Tesis
Hendi Dwi Permana[29121042]   Dr. Ir. Subiakto, M.B.A.;

10
ANALISIS INVESTASI PADA JALAN TOL GILIMANUK – MENGWI DAN DAMPAKNYA TERHADAP PENDAPATAN DAERAH: STUDI KASUS KABUPATEN JEMBRANA Tesis
Shezy Nurhayati Permana[29120523]   Taufik Faturohman, S.T, MBA, Ph.D.;, Dr. Tito Sulistio

11

12
STUDI KELAYAKAN FINANSIAL DAN EKONOMI PADA PEMBANGUNAN RUAS RENGAT – PEKANBARU PADA JALAN TOL TRANS SUMATERA Tesis
Deny Aria Permana[29120327]   Dr. Isrochmani Murtaqi, S.E., M.Acc.

13



16
PEMILIHAN ALTERNATIF PROYEK KEPATUHAN LINGKUNGAN - PERBAIKAN PIT BLOWDOWN DI COGENERATION AREA UTARA Tesis
Andry Permana[29117342]   Santi Novani, S.T., M.T., Ph.D.;


18
ANALYSIS OF CUSTOMER COMPLAINT HANDLING (Case Study) Tesis
Rezi Muhamad Taufik Permana[29117389]   Dr. Manahan Parlindungan Saragih Siallagan;

19
PENGUKURAN KEPUASAN PELANGGAN INDUSTRI PT. CX DI JAWA TIMUR (MELALUI PENDEKATAN PHYSICAL DISTRIBUTION SERVICE QUALITY) Tesis
Indra Permana (NIM : 28100025)[]   Pwmbimbing :Budiarto Subroto, Dr.Ir. Scan :Hidayat (2006-07-19)