digilib@itb.ac.id +62 812 2508 8800
61
PENGEMBANGAN PENGUKURAN KETELITIAN GEOMETRIK MESIN CNC MILLING VERTIKAL TIGA SUMBU DENGAN MODEL MULTI CENTER DOUBLE BALLBAR MEASUREMENT Tugas Akhir
Alwise Vrince Chitra Japardi[13120083]   Dr. Ir. Tri Prakosa, M.Eng.;Ir. Nasril, M.T;

62
ANALISIS DAN PERBAIKAN PERFORMA CNG EVAPORATOR UNTUK MENGATASI MASALAH KONDENSAT PADA SUPLAI GAS ALAM PLTGU Tugas Akhir
Raul Putra Karnatrisna[13120130]   Dr. Ing. Willy Adriansyah, S.T, M.T.;

63
INJECTOR CLEANLINESS TEST BASED ON STANDARD CEC F-98-08 Tugas Akhir
Muhammad Kahfi Mustari[13119232]   Dr. Ing. Ir. Tri Yuswidjajanto Zaenuri;

64
PENGEMBANGAN SENSOR LUNAK KAPASITIF TIGA SUMBU ECOFLEX/CARBON BLACK DENGAN VARIASI DIMENSI MATERIAL DIELEKTRIK Tugas Akhir
Nabil Muhammad[13120189]   Dr. Eng. Sandro Mihradi;Vani Virdyawan, S.T, M.T., Ph.D.;Afriyanti Sumboja, Ph.D.;

65
PENGEMBANGAN DIELECTRIC ELASTOMER ACTUATOR ECOFLEX/CARBON BLACK DENGAN MENGGUNAKAN ECOFLEX SEBAGAI MATERIAL DIELECTRIC Tugas Akhir
Rizki Firmansyah[13120087]   Ir. Indrawanto, M.Eng., Ph.D.;Vani Virdyawan, S.T, M.T., Ph.D.;Afriyanti Sumboja, Ph.D.;

66
STUDI PENGARUH UKURAN PARTIKEL DALAM PERFORMA KARBONASI DAN KALSINASI PADA TEKNOLOGI SIKLUS KALSIUM DI INDUSTRI SEMEN Tugas Akhir
Afgan Rosa Megantara[13120050]   Prof. Dr. Ir. Prihadi Setyo Darmanto;Dr.Eng. Ir. Firman Bagja Juangsa, S.T., M.Eng.;

67

68
EKSPERIMEN DAN SIMULASI NUMERIK PADA DESAIN PENDINGINAN BATERAI BERBASIS CAIRAN DENGAN VARIASI JUMLAH SALURAN PENDINGIN Tugas Akhir
Kevin Timothy Simarmata[13120134]   Poetro Lebdo Sambegoro, M.Sc., Ph.D.;

69
DESIGN OF POWER SUPPLY, CASING, AND SOFTWARE TO IMPROVE THE USER FRIENDLINESS OF AN ARDUINO BASED PLC Tugas Akhir
Nathania Clara Tumanggor[13119222]   Dr. Budi Heryadi, S.T., M.T.;

70

71
PENINGKATAN KEMURNIAN UAP PEMBANGKIT LISTRIK TENAGA PANAS BUMI DENGAN AIR COOLED HEAT EXCHANGER Tugas Akhir
Rafi Akbar Kharisma[13120146]   Dr. Ing. Willy Adriansyah, S.T, M.T.;

72
PENINGKATAN KEMURNIAN UAP PEMBANGKIT LISTRIK TENAGA PANAS BUMI DENGAN AIR COOLED HEAT EXCHANGER Tugas Akhir
Rafi Akbar Kharisma[13120146]   Dr. Ing. Willy Adriansyah, S.T, M.T.;

73
ANALISIS PENYERAP ENERGI IMPAK PRE-INVERTED CRASH BOX Tugas Akhir
Mukhammad Dani Pratama[13119140]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;

74
ANALISIS POTENSI KEGAGALAN DAN KEANDALAN BOGIE LRT JABODEBEK Tugas Akhir
Alim Rafif[13119038]   Yunendar Aryo Handoko, S.T, Ph.D.;Sapto Adi Nugoroho S.T;


76
THE EFFECT OF SOFT MATERIAL ADDITION TO THE CHARACTERISTICS OF A LAYER JAMMING STRUCTURE Tugas Akhir
Julian Syaputra Ikhwaningtrias[13120174]   Prof. Ir. Lavi Rizki Zuhal, Ph.D.;Pramudita Satria Palar, S.T, M.T, Ph.D.;Vani Virdyawan, S.T, M.T., Ph.D.;

77
MITSUBISHI MOVEMASTER EX RV-M1 CONTROL SYSTEM DESIGN Tugas Akhir
Muhammad Hammadi[13120010]  

78
ANALISIS DESIGN FOR MANUFACTURE AND ASSEMBLY PADA DESAIN STRUKTUR SIDEWALL DAN ENDWALL DARI CARBODY KERETA CEPAT Tugas Akhir
Nabil Burhanuddin[13120167]   Dr. Ir. Sri Raharno, S.T, M.T.;

79
PERANCANGAN TURBIN AIR JENIS CROSSFLOW DENGAN HEAD 25 METER DAN DEBIT 300 LITER/DETIK Tugas Akhir
Jihad Ibnu Zia[13117145]   Ir. I Nengah Diasta, M.T.;

80
ANALISIS ENERGY RETURN ON ENERGY INVESTMENT (EROEI) ENERGI LISTRIK COFIRING BATU BARA DENGAN BIOMASSA LIMBAH PADAT Tugas Akhir
Jen Megah Bremanda Sembiring[13117059]   Dr. Ir. Toto Hardianto, DEA;Ir. Hendi Riyanto, MSME.;