digilib@itb.ac.id +62 812 2508 8800

122
RANCANG BANGUN REAKTIVASI PARSIAL SISTEM KONTROL GAYA PADA MESIN HIDROLIK MTS 810 Tugas Akhir
Muhammad Hanif Raihan[13121121]   Dr. Budi Heryadi, S.T., M.T.;Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;

123
IMPLEMENTASI METODE MACHINE LEARNING DALAM PERENCANAAN INSPEKSI BERBASIS RISIKO (RBI) PADA FASILITAS HULU MINYAK DAN GAS Tugas Akhir
Rio Rifaldo[13121197]   Prof. Ir. I Gusti Nyoman Wiratmaja, Ph.D.;Dedy Iskandar ST., MT;

124
HEAT TRANSFER ANALYSIS OF TRIPLY PERIODIC MINIMAL SURFACE (TPMS) HEAT EXCHANGER Tugas Akhir
Marchellinus Evan Audy[13121103]   Ir. Poetro Lebdo Sambegoro, M.Sc., Ph.D.;

125
ANALISIS PENGARUH VARIASI KECEPATAN SIDE IMPACT BARRIER TERHADAP KESELAMATAN PENUMPANG MENGGUNAKAN METODE ELEMEN HINGGA Tugas Akhir
Nasywatha Cahyaningrum R[13121183]   Ir. Satrio Wicaksono, S.T, M.Eng., Ph.D.;Dr.Eng. Sandro Mihradi;Prof. Ir. Andi Isra Mahyuddin, Ph.D.;

126

127
SIMULASI LEAN PREMIX TERHADAP PEMBENTUKAN NOX PADA PEMBAKARAN NATURAL GAS MENGGUNAKAN COMPUTATIONAL FLUID DYNAMICS (CFD) Tugas Akhir
Muhammad Ammar Zhafran[13121195]   Dr. Ing. Willy Adriansyah, S.T, M.T.;

128
PEMANFAATAN PENYERAP SURYA BERBASIS CARBON DOTS (CDS) UNTUK APLIKASI TERMAL SURYA Tugas Akhir
Muhammad Hilmi Hakim[13121105]   Ir. Poetro Lebdo Sambegoro, M.Sc., Ph.D.;

129
PERANCANGAN SISTEM KONTROL MEKANIK UNTUK ALAT BANTU INTUBASI BERBASIS ROBOT LUNAK Tugas Akhir
Brigitta Gladys Jerelyn[13121087]   Ir. Vani Virdyawan, S.T, M.T., Ph.D.;Ir. Indrawanto, M.Eng., Ph.D.;

130
PERANCANGAN SISTEM PERPIPAAN TRANSMISI GAS BAWAH LAUT DI SUATU LAPANGAN GAS LEPAS PANTAI DARI WELLHEAD MENUJU RISER Tugas Akhir
Abraham S.H. Sitorus[13121128]   Prof. Dr. Ir. Bagus Budiwantoro;


132
PERANCANGAN SISTEM PIPA TRANSMISI GAS BAWAH LAUT STUDI KASUS: PIPA TRANSMISI GAS LAPANGAN B Tugas Akhir
Raihan Iqbal Bisono[13121191]   Prof. Dr. Ir. Bagus Budiwantoro;

133
ANALISIS KELELAHAN KONTAK GELINDING PADA RODA GERBONG KKBW MENGGUNAKAN PERANGKAT LUNAK UNIVERSAL MECHANISM Tugas Akhir
Elang Buana A.H.P[13121126]   Yunendar Aryo Handoko, S.T, Ph.D.;Abdul Hakim Masyhur, S.T., M.Sc., Ph.D.;

134
PARAMETRIC EVALUATION FOR THRUSTER DESIGN OF CLASS II ROV (REMOTELY OPERATED UNDERWATER VEHICLE) Tugas Akhir
Muhammad Ricky Adjie Nugroho[13121036]   Ir. Jooned Hendrarsakti, Ph.D.;Ony Arifianto, Ph.D.;

135
PENGEMBANGAN APLIKASI PERHITUNGAN BEBAN PENDINGINAN RUANGAN BERBASIS ANDROID BERDASARKAN ASHRAE DAN SNI Tugas Akhir
Rizal Hamdani[13121178]   Ir. Jooned Hendrarsakti, Ph.D.;

136
ANALISIS INSPEKSI BERBASIS RISIKO PADA TANGKI PENYIMPANAN SLOP OIL DI KILANG MINYAK Tugas Akhir
Nasrul Ikhwan[13121112]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;

137
QUANTITATIVE ASSESSMENT OF DRIVER MUSCLE FATIGUE USING SURFACE EMG AND SIGNAL PROCESSING TECHNIQUE Tugas Akhir
Bima Algasha Wardhana[13119210]   Prof. Dr. Ir. Ignatius Pulung Nurprasetio, M.SME.;

138
ANALISIS PERENCANAAN KONFIGURASI POMPA PADA SISTEM POLDER DALAM UPAYA PENGENDALIAN BANJIR AREA X Tugas Akhir
Muhammad Raja Ababil[13121193]   Ir. I Nengah Diasta, M.T.;

139
ANALISIS JEJAK KARBON PADA STRUKTUR CARBODY LIGHT RAIL TRANSIT (LRT) Tugas Akhir
Muhamad Rafi Fadhilah[13121150]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;

140
ANALISIS JEJAK KARBON PADA STRUKTUR CARBODY LIGHT RAIL TRANSIT (LRT) Tugas Akhir
Muhamad Rafi Fadhilah[13121150]   Ir. Rachman Setiawan, S.T, M.Sc., Ph.D.;