digilib@itb.ac.id +62 812 2508 8800
21
APLIKASI CHAN DIAGNOSTIC PLOT UNTUK IDENTIFIKASI WATER CONING PADA MULTILAYER RESERVOIR Tugas Akhir
Gilang Herdiansyah[12220015]   Dr. Ir. Amega Yasutra, S.T, M.T.;

22
PREDICTING INTERFACIAL TENSION IN CHEMICAL ENHANCED OIL RECOVERY: A DATA-DRIVEN APPROACH USING MACHINE LEARNING MODELS Tugas Akhir
Muhammad Ayyash Muharram[12220002]   Mohammad Galang Merdeka, S.T., M.Sc.;Dr. Rani Kurnia, S.Si., M.T.;

23
ANALISIS PENGARUH INTELLIGENT CIRCULATING SUB TERHADAP EFISIENSI PEMBERSIHAN LUBANG DI LAPANGAN X Tugas Akhir
Unggul Laksana Bagaskara[12219095]   Ardhi Hakim Lumban Gaol, S.T., M.Sc., Ph.D.;Wijoyo Niti Daton, S.T, M.T.;

24
FIELD DEVELOPMENT BY SELECTING NEW WELL PLACEMENT AND INTEGRATED SUBSURFACE TO SURFACE MODELLING FOR PRODUCTION LOSS ASSESSMENT Tugas Akhir
Abdullah Fanani[12220084]   Silvya Dewi Rahmawati, S.Si, M.Si., Ph.D.;Wijoyo Niti Daton, S.T, M.T.;NUR IMAN KHAMIDY;

25
A COMPREHENSIVE SELECTION FRAMEWORK FOR PRODUCTION OPTIMIZATION METHODS: A CASE STUDY OF âœTSâ MATURE FIELD IN SOUTH SUMATRA'S CARBONATE COMPLEX RESERVOIR Tugas Akhir
Tarrisa Cindy Fitriani[12220055]   Silvya Dewi Rahmawati, S.Si, M.Si., Ph.D.;Steven Chandra, S.T., M.T.;Ibrahim Al Fatih, S.T.;

26
OPTIMALISASI PRODUKSI PADA LAPANGAN DENGAN TIGA JENIS ARTIFICIAL Tugas Akhir
Daffa Ahmad Dzaki[12220101]   Dr. Ir. Amega Yasutra, S.T, M.T.;

27
OPTIMUM GAS LIFT INJECTION DESIGN TO IMPROVE WELL X PERFORMANCE Tugas Akhir
Itto Umaryono[12220057]   Silvya Dewi Rahmawati, S.Si, M.Si., Ph.D.;Wijoyo Niti Daton, S.T, M.T.;Andru Ferdian;

28
FLOW ASSURANCE STRATEGIES FOR SLUGGING AND CORROSION MITIGATION IN FIELD X JAMBI Tugas Akhir
Calvin Vinsensius[12220034]   Ir. Utjok W. R. Siagian, M.Sc., Ph.D.;Silvya Dewi Rahmawati, S.Si, M.Si., Ph.D.;Ir. Fahmi Nugraha;


30
TRANSIENT DYNAMIC APPROACH FOR CONTIUOUS GAS LIFT DESIGN IMPLEMENTATION IN OFFSHORE OIL WELL "MESS-1" Tugas Akhir
Raka Arghya Perdana[12220004]   Rafael J.S. Purba, S.T., M.T.;Steven Chandra, S.T., M.T.;

31
INTERPRETASI LOG SONIK UNTUK DETEKSI REKAHAN Tugas Akhir
Wahish Abdallah Iman[12204013]   Ir. Hernansjah;

32
ANALISIS PENGATURAN TOLL FEE PADA SUATU RUAS PIPA TRANSMISI GAS Tugas Akhir
Wisnu Jaluakbar[12204024]   Dr. Ir. Arsegianto, M.Sc.;

33
OPTIMIZING TUBING AND MATERIAL SELECTION FOR GAS PRODUCER TO CO2 INJECTOR IN CCUS DEVELOPMENT Tugas Akhir
Ivan Multazam Edwin[12220132]   Ardhi Hakim Lumban Gaol, S.T., M.Sc., Ph.D.;

34
INTERPRETATION OF DRILLOFF TEST DATA TO DETERMINE OPTIMUM PARAMETERS FOR BIT OPERATION Tugas Akhir
Anugerah Ghoizka Fathur[12220149]   Prof. Dr. Ing. Bonar Tua Halomoan Marbun;

35
ANALISIS DAN INTERPRETASI DATA DRILLOFF TEST UNTUK MENENTUKAN WEIGHT ON BIT OPTIMUM DALAM OPERASI PAHAT Tugas Akhir
Azriel Naufal Fadilah[12220022]   Prof. Dr. Ing. Bonar Tua Halomoan Marbun;





40
ANALISIS DATA TEMPERATUR LOG UNTUK PENENTUAN ZONA KEBOCORAN PADA SUMUR X-1 DI INDONESIA Tugas Akhir
Richi Sastra Samudra[12220097]   Prof. Dr. Ing. Bonar Tua Halomoan Marbun;