digilib@itb.ac.id +62 812 2508 8800
81
ANALISIS PENGARUH MUKA AIR TANAH TERHADAP KESTABILAN LERENG DI PT ADARO INDONESIA Tugas Akhir
Anindya Nada Arinal Haque[12121004]   Dr. Eng. Ganda Marihot Simangunsong, S.T, M.T.;


83
ANALISIS KORELASI CERCHAR ABRASIVITY INDEX (CAI) TERHADAP KOMPOSISI KUARSA DAN UKURAN BUTIR PADA BATUAN TERALTERASI Tugas Akhir
Imas Siti Munawaroh[12121027]   Dr. Eng. Ganda Marihot Simangunsong, S.T, M.T.;Yudhidya Wicaksana, S.T., M.T., Ph.D.;

84
ANALISIS KESTABILAN LERENG SECARA 3 DIMENSI DI LERENG HIGHWALL TAMBANG BATUBARA PT XYZ Tugas Akhir
Muhammad Hanif Darmawan[12121055]   Prof. Dr. Ir. Budi Sulistianto, M.T.;

85
ANALISIS KESTABILAN LERENG TIMBUNAN IN-PIT DUMP PT ARUTMIN INDONESIA TAMBANG ASAMASAM PROVINSI KALIMANTAN SELATAN Tugas Akhir
Salwa Widiastuti[12121061]   Prof. Dr. Ir. Budi Sulistianto, M.T.;

86
HUBUNGAN ANTARA SIFAT MEKANIK BATUAN DAN GAYA POTONG PADA UJI PEMOTONGAN BATUAN SEDIMEN MENGGUNAKAN CHISEL PICK CUTTER Tugas Akhir
Rafilino Fazza Kuncoro[12121088]   Dr. Eng. Ganda Marihot Simangunsong, S.T, M.T.;Yudhidya Wicaksana, S.T., M.T., Ph.D.;

87
ANALISIS BALIK KESTABILAN LERENG SIDEWALL TAMBANG TERBUKA BATUBARA MENGGUNAKAN METODE KESETIMBANGAN BATAS 2 DIMENSI DAN 3 DIMENSI Tugas Akhir
Khurotul A'yunnina[12121018]   Dr. Eng. Nuhindro Priagung Widodo, M.T.;

88
ANALISIS KESTABILAN LERENG DESAIN LOM SERTA PENGARUH TRANSIEN SETTLING POND PADA LERENG DESAIN LOM PIT A PT XYZ Tugas Akhir
Shanneta Lukman[12121054]   Prof. Dr.Eng. Syafrizal, S.T., M.T.;

89
ANALISIS PENGARUH KINERJA KEUANGAN TERHADAP NILAI PERUSAHAAN DENGAN HARGA EMAS SEBAGAI MEDIASI PADA PERUSAHAAN TAMBANG EMAS DI INDONESIA Tugas Akhir
R. Muhammad Fachru Al Yazid[12121100]   Dr. Eng. Fadhila Achmadi Rosyid, S.T, M.T.;

90
ANALISIS PENGARUH KINERJA KEUANGAN TERHADAP VALUASI PERUSAHAAN SEMEN DI INDONESIA Tugas Akhir
Rauda Devi Nurdimayta Moedigdo[12121102]   Dr. Eng. Fadhila Achmadi Rosyid, S.T, M.T.;

91
ANALISIS PENGARUH KINERJA KEUANGAN TERHADAP NILAI PERUSAHAAN PRA DAN PASCA PEMBENTUKAN HOLDING PERTAMBANGAN INDONESIA (MIND ID) Tugas Akhir
Elis Nathania Carisawati Nisa[12121086]   Dr. Eng. Fadhila Achmadi Rosyid, S.T, M.T.;

92
PEMBUATAN SLOPE STABILITY CURVE DENGAN METODE KESETIMBANGAN BATAS Tugas Akhir
Joeang Al-Islami[12121032]   Ir. Simon Heru Prassetyo, S.T, M.Sc., Ph.D.;

93
PERHITUNGAN PROBABILITAS TERBENTUKNYA BOULDER PADA OPERASI PELEDAKAN MENGGUNAKAN SIMULASI MONTE CARLO (STUDI KASUS : PIT MRC PT XYZ) Tugas Akhir
Ahmad Syauqy Rusydan[12121115]   Dr. Eng. Ganda Marihot Simangunsong, S.T, M.T.;

94
ANALISIS SPASI DATA PADA SUMBER DAYA BAUKSIT MENGGUNAKAN PENDEKATAN GLOBAL ESTIMATION VARIANCE DI PT XYZ, TAYAN, KALIMANTAN BARAT Tugas Akhir
Muhammad Athaya Aqsyawijaya[12121097]   Prof. Ir. Mohamad Nur Heriawan, S.T., M.T., Ph.D.;

95
ANALISIS DAMPAK UKURAN BLOK SELECTIVE MINING UNIT (SMU) TERHADAP TONASE DAN KADAR ENDAPAN BAUKSIT LATERIT Tugas Akhir
Axel Christabel Dalta[12121071]   Prof. Ir. Mohamad Nur Heriawan, S.T., M.T., Ph.D.;Dr.Eng. Tomy Alvin Rivai, S.T., M.Eng.;

96
ANALISIS SPASI LUBANG BOR (DHSA) MENGGUNAKAN PENDEKATAN VARIANSI ESTIMASI GLOBAL (GEV) PADA SUMBER DAYA NIKEL LATERIT DI POMALAA, KABUPATEN KOLAKA, SULAWESI TENGGARA Tugas Akhir
Odi Prayadi[12121068]   Prof. Ir. Mohamad Nur Heriawan, S.T., M.T., Ph.D.;Dr.Eng. Tomy Alvin Rivai, S.T., M.Eng.;