61
DESAIN SISTEM PENGUKURAN PARTIAL DISCHARGE MENGGUNAKAN BERAGAM ANTENA Tugas Akhir
Khalisa Prabhasalma[18020020]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Khalisa Prabhasalma[18020020]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
62
ANALISIS DESAIN DAN PERFORMANSI SISTEM PV ON-GRID GILI TRAWANGAN 200 KWP: OPTIMASI ORIENTASI, KONFIGURASI MODUL, DAN INVERTER Tugas Akhir
Dendiza Abdillah Prazos[18018028]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;
Dendiza Abdillah Prazos[18018028]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;
63
DESAIN DAN IMPLEMENTASI LOW NOISE AMPLIFIER (LNA) DENGAN RENTANG FREKUENSI 0,3 - 3000 MHZ SEBAGAI PENGUAT DALAM PENGUKURAN PARTIAL DISCHARGE Tugas Akhir
Handrata Roy Josia[18020006]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Handrata Roy Josia[18020006]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
64
PERANCANGAN DAN ANALISIS PENGARUH JUMLAH, JARAK, DAN KONFIGURASI STASIUN TERHADAP KESALAHAN LOKASI SISTEM PEMETAAN PETIR 3 DIMENSI Tugas Akhir
Satria Ibtihal Wibisono[18020018]   Ir. Syarif Hidayat, M.T, Ph.D.;
Satria Ibtihal Wibisono[18020018]   Ir. Syarif Hidayat, M.T, Ph.D.;
65
PERANCANGAN PENDINGIN PADA PANEL SURYA MENGGUNAKAN GABUNGAN HEATPIPE DAN HEATSINK UNTUK MENINGKATKAN DAYA KELUARAN Tugas Akhir
Mukti Hasanain[18019025]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Mukti Hasanain[18019025]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
66
PERANCANGAN SISTEM PEMBANGKIT LISTRIK TENAGA HIBRIDA UNTUK SUBMERSIBLE PUMP DI IKN NUSANTARA Tugas Akhir
Prabowo[18020007]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Prabowo[18020007]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
67
ANALISIS PEMANFAATAN OFF GAS POWER PLANT UNTUK MANUFAKTUR PETROKIMIA Tugas Akhir
Muhammad Dzaki Akbar[18020004]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Muhammad Dzaki Akbar[18020004]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
68
ANALISIS DAN PENINGKATAN DESAIN PERLINDUNGAN JARINGAN TRANSMISI TEGANGAN TINGGI DENGAN SISTEM PENTANAHAN TERPISAH TERARAH Tugas Akhir
Fadlin Izhar Tarigan[18020013]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Fadlin Izhar Tarigan[18020013]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
69
DESAIN GABUNGAN HEAT SINK DAN PHASE CHANGE MATERIAL SEBAGAI METODE PENDINGINAN PASIF PADA SOLAR PHOTOVOLTAIC Tugas Akhir
Muhammad Naufal Wahyu Athallah[18020016]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Muhammad Naufal Wahyu Athallah[18020016]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
70
ANALISIS ENERGY, ECONOMY, AND ENVIRONMENT (3E) PEMBANGKIT LISTRIK BERBAHAN BAKAR GAS BUANG INDUSTRI BAJA Tugas Akhir
Hebert Arthur Sigiro[18020010]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Hebert Arthur Sigiro[18020010]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
71
DESAIN PENEMPATAN GRID-FORMING DAN GRID- FOLLOWING UNITS PADA LOW-INERTIA SYSTEM Tugas Akhir
Jeffrey Aleandro Permana[18018037]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;
Jeffrey Aleandro Permana[18018037]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;
72
PERANCANGAN INVERTER SATU FASA MODE BUCK BERBASISI KONVERTER BUCK-BOOST YANG DIMODIFIKASI SEBAGAI SEL DASAR Tugas Akhir
M. Pindhan Bhaskoro Hanendro B[18020002]   Dr. Arwindra Rizqiawan, S.T, M.T.;
M. Pindhan Bhaskoro Hanendro B[18020002]   Dr. Arwindra Rizqiawan, S.T, M.T.;
73
PERANCANGAN SISTEM DC MICROGRID DENGAN TOPOLOGI CLUSTER UNTUK DAERAH 3T Tugas Akhir
Agustinus Yudhistira.W.S[18020005]   Dr. Arwindra Rizqiawan, S.T, M.T.;
Agustinus Yudhistira.W.S[18020005]   Dr. Arwindra Rizqiawan, S.T, M.T.;
74
PERANCANGAN OPTIMISASI KESERAGAMAN DISTRIBUSI LMP (LOCATIONAL MARGINAL PRICE) TERHADAP PENETRASI DISTRIBUTED GENERATION DENGAN METODE GENETIC ALGORITHM Tugas Akhir
Safitri Adawiyah[18020019]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Safitri Adawiyah[18020019]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
75
PERANCANGAN MODEL OPTIMISASI HOSTING CAPACITY PADA JARINGAN DISTRIBUSI DENGAN PERTIMBANGAN MULTI-CONSTRAINTS MENGGUNAKAN PENDEKATAN DUA TAHAP Tugas Akhir
Adhyatma Aulia Rizqi Leksono[18020011]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Adhyatma Aulia Rizqi Leksono[18020011]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
76
PERBANDINGAN SKEMA EARLY RETIREMENT MELALUI PENDEKATAN POPULATION-WEIGHTED DAMAGE DAN NATURAL RETIREMENT PADA PLTU BATUBARA SISTEM JAWA MADURA BALI Tugas Akhir
Gema Wachid Aryasatya[18020008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Gema Wachid Aryasatya[18020008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
77
DESAIN SISTEM PENGUJIAN LAMPU DAN IMPLEMENTASINYA UNTUK PENGUJIAN LAMPU RUMAH TANGGA Tugas Akhir
Janissar Flinsa Abdillah[18018032]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Janissar Flinsa Abdillah[18018032]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
78
PERANCANGAN SISTEM KENDALI PADA MOTOR LISTRIK BERJENIS SWITCHED RELUCTANCE DENGAN TOPOLOGI SHARED SWITCH Tugas Akhir
Michael Suhendra[18019022]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Michael Suhendra[18019022]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
79
PERANCANGAN RANGKAIAN KONVERTER MILLER’S CIRCUIT SEBAGAI KONTROL 8/6 SWITCHED RELUCTANCE Tugas Akhir
Alam Raihan Emir[18019018]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Alam Raihan Emir[18019018]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
80
PERANCANGAN DAN PERMODELAN BRUSHLESS DC MOTOR 250W UNTUK APLIKASI SEPEDA LISTRIK Tugas Akhir
Moh. Fadhil Ardiansyah[18018003]   Dr. Arwindra Rizqiawan, S.T, M.T.;
Moh. Fadhil Ardiansyah[18018003]   Dr. Arwindra Rizqiawan, S.T, M.T.;
Perpustakaan Digital ITB