digilib@itb.ac.id +62 812 2508 8800
61
TRANSMISSION LINE PLANNING UNTUK IBU KOTA NEGARA BARU MENGGUNAKAN METODE SUCCESIVE REMOVAL Tugas Akhir
Harso Adjie Brotosukmono[18016010]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;

62
OPTIMASI KONVERTER DC-DC BOOST KASKADE MULTIFASA YANG DISEDERHANAKAN Tugas Akhir
Jeremy Maringan Tua Napitupulu[18016012]   Prof. Dr. Ir. Pekik Argo Dahono;

63
PENGENDALI ARUS HYSTERESIS BARU UNTUK INVERTER GRID-CONNECTED TIGA FASA DENGAN PENGURANGAN RUGI-RUGI Tugas Akhir
Alvin Putra Sisdwinugraha[18016005]   Prof. Dr. Ir. Pekik Argo Dahono;

64
DESAIN PROTEKSI MICROGRID DENGAN PERMASALAHAN GRADING OVERCURRENT RELAY PADA DAERAH TERISOLASI DI INDONESIA Tugas Akhir
Benaya Levi Armariel[18018033]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;

65
DESAIN SIKLUS GOSWAMI PADA PEMBANGKIT LISTRIK TENAGA PANAS LAUT (OTEC) DI LAUT FLORES Tugas Akhir
Muhammad Hikmat Irham Maulana[18018020]   Burhanuddin Halimi, S.T., M.T., Ph.D.;

66
PERANCANGAN KONVERTER DC-DC KASKADE BOOST-BUCK MULTIFASA DUA ARAH DALAM MODE KONDUKSI DISKONTINYU Tugas Akhir
Hans Ryan Pakpahan[18018019]   Dr. Arwindra Rizqiawan, S.T., M.T.;

67
ANALISIS DAN PERANCANGAN MOTOR BRUSHLESS DC 250 WATT UNTUK SEPEDA LISTRIK PERKOTAAN Tugas Akhir
Adzhani Zalfa Aliyadin[18018018]   Dr. Ir. Agus Purwadi, M.T.;Ir. Syarif Hidayat, M.T, Ph.D.;

68
PERANCANGAN DAN STUDI KOMPARATIF SISTEM PEMBANGKIT LISTRIK TENAGA SURYA ON-GRID DI PABRIK INDUSTRI BAJA Tugas Akhir
Muhammad Rafi Pratama[18018013]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;

69
DESAIN PEMBANGKIT HIBRIDA BERBASIS SOLAR PV-ANGIN-BATERAI-GENSET: STUDI KASUS DI PULAU MATAKUS Tugas Akhir
Ema Widhi Pratiwi[18018004]   Burhanuddin Halimi, S.T., M.T., Ph.D.;

70
PERANCANGAN PEMBANGKIT SURYA TERMAL BERBASIS KOMBINASI SIKLUS BRAYTON DAN ORC Tugas Akhir
Sekar Nityasa[18018036]   Burhanuddin Halimi, S.T., M.T., Ph.D.;

71
PERANCANGAN KONVERTER DC-DC BOOST MULTIFASA KASKADE EFISIENSI TINGGI DENGAN OPTIMASI INDUKTANSI Tugas Akhir
Muhammad Farras Muzakki[18018009]   Dr. Arwindra Rizqiawan, S.T., M.T.;

72
PERANCANGAN DAN ANALISIS TEKNO-EKONOMI SISTEM TENAGA OFF-GRID UNTUK PENYEDIAAN AIR BERSIH SMPIT WASILAH INTELEGENSIA TAROGONG GARUT Tugas Akhir
Syahrul Ahmad Gifari[18018005]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;

73
PERANCANGAN KONVERTER DC-DC CUK MODIFIKASI MULTIFASA EFISIENSI TINGGI Tugas Akhir
Anam Rais Assidiq[18018011]   Dr. Arwindra Rizqiawan, S.T., M.T.;

74
PERANCANGAN SISTEM KENDALI HVAC ADAPTIF PADA BANGUNAN PERKANTORAN BERBASIS PMV-LOGIKA FUZZY Tugas Akhir
Ahmad Dufan Al Rasyid[18018021]   Dr. Ir. Nanang Hariyanto, M.T.;Pradita Octoviandiningrum Hadi, S.T., M.T., Ph.D.;

75
DESAIN KOORDINASI SISTEM PROTEKSI UNTUK MICROGRID BERBASIS INVERTER Tugas Akhir
Muhammad Ikhsan Kusrachmansyah[18018027]   Dr. Ir. Nanang Hariyanto, M.T, Kevin Marojahan, S.T., M.T., Ph.D

76
DESAIN KOORDINASI SISTEM PROTEKSI UNTUK MICROGRID BERBASIS INVERTER Tugas Akhir
Muhammad Ikhsan Kusrachmansyah[18018027]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;

77
PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA UNTUK STASIUN PENGISIAN KENDARAAN LISTRIK DI LINGKUNGAN KAMPUS Tugas Akhir
Felicia Nareswari Satyani[18018025]   Burhanuddin Halimi, S.T., M.T., Ph.D.;

78
PERENCANAAN DESAIN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) HIBRIDA DI PULAU MARATUA â PLN MARATUA Tugas Akhir
I Made Ngurah Chandra Marutha[18018022]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;

79
PERANCANGAN PLTS TERAPUNG 3,36 MWP PADA RESERVOIR PLTA MRICA Tugas Akhir
Mohammad Irvan Fauzi[18018010]   Prof. Dr. Ir. Bambang Anggoro Soedjarno P., M.T.;

80
PERANCANGAN BUILDING-INTEGRATED PHOTOVOLTAICS (BIPV) UNTUK PABRIK DI KAWASAN INDUSTRI MARUNDA Tugas Akhir
Jason Christopher Harnowo[18018008]   Burhanuddin Halimi, S.T., M.T., Ph.D.;