digilib@itb.ac.id +62 812 2508 8800
21
PERANCANGAN SISTEM MANAJEMEN ENERGI BERBASIS ALGORITMA GENETIKA UNTUK APLIKASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) ATAP RUMAHAN Tugas Akhir
Febi Nur Sabrina[18022039]   Dr.Eng. Ir. Arwindra Rizqiawan, S.T, M.T.;Dr. Ir. Kevin Marojahan Banjar Nahor, S.T., M.T.;


23
PERANCANGAN PEMANFAATAN ENERGY STORAGE SYSTEM (ESS) DI SISTEM KETENAGALISTRIKAN INDONESIA DENGAN STUDI KASUS SISTEM INTERKONEKSI SULAWESI UTARA - GORONTALO Tugas Akhir
Adnein Hasna Al - Achyar[18022036]   Dr. Ir. Kevin Marojahan Banjar Nahor, S.T., M.T.;Ir. Pradita Octoviandiningrum Hadi, S.T., M.T., Ph.D.;

24
PERANCANGAN SISTEM ELEKTRIFIKASI KAPAL NELAYAN DENGAN BOAT-MOUNTED PV DAN SHORE CHARGING BERBASIS PV DI ATAPUPU, KABUPATEN BELU, NUSA TENGGARA TIMUR Tugas Akhir
A.A. Radheya Seva Marthariyana[18022016]   Prof. Dr. Ir. Umar Khayam, S.T, M.T., IPM;Dr. Ing. Deny Hamdani, S.T, M.Sc.;


26
PERANCANGAN STRATEGI DAN METODE DEDIESELISASI OPTIMAL BERBASIS PV Tugas Akhir
Raissa Micah Bodhianto[18022050]   Dr. Tri Desmana Rachmildha, S.T, M.T.;Dr. Ing. Deny Hamdani, S.T, M.Sc.;

27
OPTIMASI KONFIGURASI SISTEM DEDIESELISASI BERBASIS PV MELALUI ANALISIS TEKNO-EKONOMI DI PULAU SIKAKAP, KEPULAUAN MENTAWAI Tugas Akhir
Evan Arif Ariawan[18022004]   Dr. Ing. Deny Hamdani, S.T, M.Sc.;Dr. Tri Desmana Rachmildha, S.T, M.T.;

28
PERANCANGAN KENDALI INVERTER FREKUENSI TINGGI BERBASIS PENGUNCI FASA ORDE DUA TERGENERALISASI UNTUK APLIKASI SISTEM TRANSFER DAYA NIRKABEL Tugas Akhir
Moses Yohanes Darryl Hutapea[18022042]   Dr.Eng. Ir. Arwindra Rizqiawan, S.T, M.T.;

29
PERANCANGAN KENDALI INERSIA VIRTUAL YANG OPTIMAL DENGAN MEMPERTIMBANGKAN SKEMA PROTEKSI UNDER FREQUENCY LOAD SHEDDING (UFLS) Tugas Akhir
Ryan Suryaputra Adiwidodo[18022030]   Dr. Ir. Fathin Saifur Rahman, S.T., M.T.;

30
PERANCANGAN SISTEM PROTEKSI PETIR INTERNAL PADA SARANA LIGHT RAILWAY TRANSIT (LRT) JAKARTA-DEPOK-BEKASI Tugas Akhir
Ridwan Fauzan Dhoifullah[18022043]   Dr. Bryan Denov, S.T., M.T.;

31
PERANCANGAN PEMBANGKIT OCEAN THERMAL ENERGY CONVERSION (OTEC) BERBASIS SIKLUS TERBUKA DAN TERTUTUP Tugas Akhir
Sergie Akhifa Naditia[18021009]   Ir. Burhanuddin Halimi, S.T, M.T, Ph.D.;

32
PERANCANGAN KENDALI INVERTER 1 FASA TERHUBUNG KE JARINGAN UNTUK APLIKASI MICROINVERTER Tugas Akhir
Fahmi Fahrizal Fauzi[18021013]   Dr.Eng. Ir. Arwindra Rizqiawan, S.T, M.T.;

33
DESAIN PERANCANGAN BIDIRECTIONAL AC-DC CONVERTER UNTUK DC MICROGRID CLUSTER Tugas Akhir
Rafael Octavius[18020009]   Dr.Eng. Ir. Arwindra Rizqiawan, S.T, M.T.;

34
PERANCANGAN KOORDINASI SKEMA PROTEKSI RELAI ARUS LEBIH BERARAH DALAM SISTEM TENAGA 20 KV LOOPING Tugas Akhir
Stephen Halasson Johannes[18019014]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Ir. Kevin Marojahan Banjar Nahor, S.T., M.T.;

35
KINERJA GRID FORMING INVERTER DALAM SISTEM TENAGA Tugas Akhir
Jeremy Alexander Hasoloan[18021001]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;

36
ANALISIS PENINGKATAN DAYA KELUARAN PLTP DENGAN HIBRIDISASI PEMBANGKIT LISTRIK TENAGA SURYA: GUNUNG TALANG, SUMATRA BARAT Tugas Akhir
Ukha Ghaezy Ausyafani[18021014]   Ir. Burhanuddin Halimi, S.T, M.T, Ph.D.;

37
PERANCANGAN ALGORITMA UNTUK OPTIMISASI PELETAKAN DAN PENENTUAN KAPASITAS PEMBANGKIT LISTRIK MEMPERHATIKAN KESTABILAN FREKUENSI SISTEM Tugas Akhir
Rafi Rabbani Firdaus[18021015]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Fathin Saifur Rahman, S.T., M.T.;

38

39
DESIGN OF HEALTH INDEX CALCULATION FOR GAS INSULATED SUBSTATION OVERHAUL PRIORITIZATION Tugas Akhir
Muhammad Dhani Depardi[18021007]   Prof. Dr. Ir. Umar Khayam, S.T, M.T., IPM;

40
PERANCANGAN PENGENDALI SWITCH RELUCTANCE MOTOR (SRM) 12/8 DENGAN RESPON DINAMIS Tugas Akhir
Muhammad Gerhard Juliano[18021016]   Dr. Tri Desmana Rachmildha, S.T, M.T.;Dr. Ir. Arwindra Rizqiawan, S.T, M.T.;