21
PERANCANGAN OPTIMISASI KESERAGAMAN DISTRIBUSI LMP (LOCATIONAL MARGINAL PRICE) TERHADAP PENETRASI DISTRIBUTED GENERATION DENGAN METODE GENETIC ALGORITHM Tugas Akhir
Safitri Adawiyah[18020019]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Safitri Adawiyah[18020019]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
22
PERANCANGAN MODEL OPTIMISASI HOSTING CAPACITY PADA JARINGAN DISTRIBUSI DENGAN PERTIMBANGAN MULTI-CONSTRAINTS MENGGUNAKAN PENDEKATAN DUA TAHAP Tugas Akhir
Adhyatma Aulia Rizqi Leksono[18020011]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Adhyatma Aulia Rizqi Leksono[18020011]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
23
PERBANDINGAN SKEMA EARLY RETIREMENT MELALUI PENDEKATAN POPULATION-WEIGHTED DAMAGE DAN NATURAL RETIREMENT PADA PLTU BATUBARA SISTEM JAWA MADURA BALI Tugas Akhir
Gema Wachid Aryasatya[18020008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Gema Wachid Aryasatya[18020008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
24
DESAIN SISTEM PENGUJIAN LAMPU DAN IMPLEMENTASINYA UNTUK PENGUJIAN LAMPU RUMAH TANGGA Tugas Akhir
Janissar Flinsa Abdillah[18018032]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Janissar Flinsa Abdillah[18018032]   Dr. Ir. Umar Khayam, S.T, M.T., IPM;
25
PERANCANGAN SISTEM KENDALI PADA MOTOR LISTRIK BERJENIS SWITCHED RELUCTANCE DENGAN TOPOLOGI SHARED SWITCH Tugas Akhir
Michael Suhendra[18019022]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Michael Suhendra[18019022]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
26
PERANCANGAN RANGKAIAN KONVERTER MILLER’S CIRCUIT SEBAGAI KONTROL 8/6 SWITCHED RELUCTANCE Tugas Akhir
Alam Raihan Emir[18019018]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Alam Raihan Emir[18019018]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
27
PERANCANGAN DAN PERMODELAN BRUSHLESS DC MOTOR 250W UNTUK APLIKASI SEPEDA LISTRIK Tugas Akhir
Moh. Fadhil Ardiansyah[18018003]   Dr. Arwindra Rizqiawan, S.T, M.T.;
Moh. Fadhil Ardiansyah[18018003]   Dr. Arwindra Rizqiawan, S.T, M.T.;
28
STUDI KINERJA ISOLATOR KERAMIK 150 KV PADA PANTAI SELATAN PULAU JAWA (KASUS: DAERAH GOMBONG-RAWALO-KESUGIHAN) Tugas Akhir
Aulia Ramadhana Alifianda[18018002]   Prof. Dr. Ir. Suwarno, M.T.;
Aulia Ramadhana Alifianda[18018002]   Prof. Dr. Ir. Suwarno, M.T.;
29
STUDI KOROSI ISOLATOR DI DAERAH TROPIS. KASUS : PULAU JAWA BAGIAN SELATAN Tugas Akhir
Penina Annais[18018007]   Prof. Dr. Ir. Suwarno, M.T.;
Penina Annais[18018007]   Prof. Dr. Ir. Suwarno, M.T.;
30
STUDI ARUS BOCOR DAN PERILAKU TERMAL PADA ISOLATOR KERAMIK 150 KV YANG MENGALAMI KOROSI (STUDI KASUS JALUR GOMBONG-RAWALO-KESUGIHAN) Tugas Akhir
Leavinindya Aulia Nissa Adjie[18018012]   Prof. Dr. Ir. Suwarno, M.T.;
Leavinindya Aulia Nissa Adjie[18018012]   Prof. Dr. Ir. Suwarno, M.T.;
31
DESAIN KONFIGURASI OPTIMUM SISTEM PEMBANGKIT LISTRIK TENAGA SURYA BERBASIS BIFACIAL PHOTOVOLTAICS Tugas Akhir
Josiah Jectofer Meka[18017030]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Josiah Jectofer Meka[18017030]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
32
DESAIN DAN IMPLEMENTASI ANTENA UNTUK PENGUKURAN PARTIAL DISCHARGE PADA PERALATAN LISTRIK TEGANGAN TINGGI Tugas Akhir
Tina Wahyuningsih[18018029]   Dr. Agung Harsoyo, S.T, M.Sc.. M.Eng.;Dr. Ir. Umar Khayam, S.T, M.T., IPM;
Tina Wahyuningsih[18018029]   Dr. Agung Harsoyo, S.T, M.Sc.. M.Eng.;Dr. Ir. Umar Khayam, S.T, M.T., IPM;
33
DESAIN PEMBANGKIT LISTRIK TENAGA SURYA: PV, CSP, DAN HYBRID PV-CSP Tugas Akhir
Sausan Akhmad Bafagih[18017028]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Sausan Akhmad Bafagih[18017028]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
34
PERANCANGAN DESAIN SKEMA PERTAHANAN UNDER-FREQUENCY LOAD SHEDDING DAN ISLAND OPERATION PADA SISTEM INTERKONEKSI SULAWESI BAGIAN SELATAN (SULBAGSEL) Tugas Akhir
Jonathan Fedrico Simorangkir[18019004]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Jonathan Fedrico Simorangkir[18019004]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
35
PENUAAN TERMAL DIPERCEPAT INSULASI KERTAS PADA MINYAK MINERAL YANG DIRETROFILL DENGAN MINYAK MINERAL, NATURAL ESTER, DAN GAS-TO- LIQUID (GTL) Tugas Akhir
Muhammad Hanif Ihsan Syuhada[18017001]   Prof. Dr. Ir. Suwarno, M.T.;
Muhammad Hanif Ihsan Syuhada[18017001]   Prof. Dr. Ir. Suwarno, M.T.;
36
PERANCANGAN MITIGASI FAULT INDUCED DELAYED VOLTAGE RECOVERY (FIDVR) UNTUK MENINGKATKAN KESTABILAN TEGANGAN PADA SISTEM KELISTRIKAN Tugas Akhir
Annisa Nur Adilla[18019008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Annisa Nur Adilla[18019008]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
37
PERANCANGAN METODE UJI KESTABILAN SINYAL KECIL MENGGUNAKAN TEOREMA KHARITONOV PADA MICROGRID BERBASIS INVERTER Tugas Akhir
Jason[18019010]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
Jason[18019010]   Dr. Ir. Nanang Hariyanto, M.T.;Dr. Kevin Marojahan Banjar Nahor, S.T., M.T.;
38
PERANCANGAN MICRO-INVERTER BOOST BERBASIS SEL DASAR CUK YANG DIMODIFIKASI Tugas Akhir
Martin Alexzander[18019012]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Martin Alexzander[18019012]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
39
PERANCANGAN RANGKAIAN KONTROL ASYMMETRIC HALF-BRIDGE SEBAGAI KONTROL 8/6 SWITCHED RELUCTANCE MOTOR Tugas Akhir
Denri Yesayevtta[18019013]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
Denri Yesayevtta[18019013]   Dr. Arwindra Rizqiawan, S.T, M.T.;Dr. Jihad Furqani, S.T., M.T.;
40
PERANCANGAN BUILDING INTEGRATED PHOTOVOLTAICS (BIPV) PADA ATAP BANGUNAN GEDUNG HIJAU Tugas Akhir
Stevanie Hana Emeralda[18019015]   Burhanuddin Halimi, S.T, M.T, Ph.D.;
Stevanie Hana Emeralda[18019015]   Burhanuddin Halimi, S.T, M.T, Ph.D.;