PERANCANGAN BIDANG GEOTEKNIK PELABUHAN MULTIPURPOSE KOTA DUMAI Tugas Akhir
Akbar Dandy Firmansyah[15018158]   Ir. Erza Rismantojo, MSCE, Ph.D.;

2
ANALISIS STABILITAS LERENG DAN PERKUATAN LERENG GALIAN MENGGUNAKAN METODE SOIL NAILLING PADA PERSIAPAN LAHAN LOKASI ENGINE GENERATOR PLANT Tugas Akhir
Christophorus Gerard Marvin[15021132]   Dr. Eng. Hasbullah Nawir, S.T., M.T.;Dr. Eng. Rangga Adiprima Sudisman, S.T., M.Eng.;


4
ANALISIS BACK-CALCULATION KELONGSORAN DAN PEMODELAN PERKUATAN LERENG CLAY SHALE DENGAN SOLDIER PILE MENGGUNAKAN METODE ELEMEN HINGGA Tugas Akhir
Syauqi Dwi Ryan Ardhani[15021047]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;Dr. Ir. Agus Himawan, S.T., M.T.;

5
ANALISIS PERBANDINGAN PENGGUNAAN SECANT PILE DAN ROCK BOLT DENGAN SOLDIER PILE DAN GROUND ANCHOR TERHADAP STABILITAS LERENG Tugas Akhir
James Nathaniel Surya[15021078]   Prof. Ir. I Wayan Sengara, M.S.EM, Ph.D.;

6
PERANCANGAN DINDING PENAHAN TANAH CORRUGATED CONCRETE SHEET PILE DENGAN GROUND ANCHOR PADA PROYEK STASIUN POMPA ANCOL SENTIONG Tugas Akhir
Riza Nurdin Syaputra[15021046]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E., : Dr. Ir. Agus Himawan, S.T., M.T.


8
PERANCANGAN FONDASI DAN DINDING PENAHAN TANAH PADA TANAH CLAY SHALE: PROYEK PEMBANGUNAN KAMPUS 2 POLMAN MAJALENGKA Tugas Akhir
Nur Rizki Muzakki[15020055]   Endra Susila, S.T, M.T, Ph.D.;Yuamar Imarrazan Basarah, S.T., M.T., Ph.D.;

9
PERENCANAAN FONDASI TIANG DAN DINDING PENAHAN TANAH TOWER 7 RUMAH SUSUN ASN IBU KOTA NUSANTARA PADA TANAH BERKONTUR Tugas Akhir
Febby Athia Rahim[15020158]   Prof. Dr. Ir. Masyhur Irsyam, M.S.E.;Yuamar Imarrazan Basarah, S.T., M.T., Ph.D.;

10

11
PERANCANGAN GEOTEKNIK EMBUNG RAWA MALANG: INFRASTRUKTUR PENDUKUNG POLDER SUNTER TIMUR II KEBANTENAN Tugas Akhir
Ghazy Shidqy[15019053]   Sugeng Krisnanto, S.T, M.T, Ph.D.;

12
EVALUASI SEEPAGE DAN STABILITAS LERENG BENDUNGAN CIPANUNDAAN, KABUPATEN CIREBON, JAWA BARAT Tugas Akhir
Jadnirio Ferrel[15019064]   Ir. Andhika Sahadewa, S.T, M.S.E, Ph.D.;

13
STUDI STABILITAS LERENG SUNGAI MAHAKAM Tugas Akhir
Andika Yudha P[15004012]   Endra Susila, S.T, M.T, Ph.D.;

14

15
EVALUASI STABILITAS DAN REMBESAN BENDUNGAN KERING CIAWI Tugas Akhir
Muhammad Qinthara Aghnat[15016027]   Ir. Andhika Sahadewa, S.T, M.S.E, Ph.D.;

16
STUDI STABILITAS LERENG SUNGAI MAHAKAM Tugas Akhir
HARLEN VAREZA [15004002]   Pembimbing: Ir. Endra Susila, M.T., Ph.D.

17
PERANCANGAN PERBAIKAN TANAH DAN FONDASI TIANG PANCANG PADA BANDAR UDARA INTERNASIONAL JUANDA SURABAYA Tugas Akhir
Azifah Izzaturrahma[15018011]   Dr. Russ Bona Frazila, S.T., M.T.;Dr.Eng. Hasbullah Nawir, S.T., M.T.;Muhammad Riyansyah, S.T., Ph.D.;

18
PERANCANGAN SISTEM GEOTEKNIK JALAN TOL BOGOR OUTER RING ROAD (BORR) SEKSI IIIB Tugas Akhir
Siti Nurhaliza[15018097]   Dr. Harmein Rahman, S.T., M.T.;Dr.Eng. Hasbullah Nawir, S.T., M.T.;Muhammad Riyansyah, S.T., Ph.D.;

19
PERANCANGAN LAKE RESORT WADUK JATILUHUR BIDANG GEOTEKNIK Tugas Akhir
MUHAMMAD AFFAN ARROYAN[15017051]   Prof. Ir. I Wayan Sengara, M.S.EM, Ph.D.;

20
PERANCANGAN BIDANG GEOTEKNIK PLTMH BONE BOLANGO Tugas Akhir
Fabiola Bella Wibowo[15017063]   Prof. Dr. Ir. Krishna Suryanto;Ir. Hernawan Mahfudz, M.T.;Ir. Erza Rismantojo, MSCE, Ph.D.;Erwin Lim, S.T., M.S., Ph.D.;