ANALISIS HUBUNGAN ANTARA STRUKTUR SPASIAL TERHADAP SPASI PEMBORAN PADA EKSPLORASI ENDAPAN TIMAH ALUVIAL DI DARAT DAN LAUT, DAERAH MUNTOK, PROVINSI KEPULAUAN BANGKA BELITUNG

A COMPARATION OF DISTINCT ELEMENT METHOD AND ANALYTICAL METHOD IN CIRCULAR TUNNEL CAUSED BY DISTANCE DEPTH

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:39:04
Oleh : SUKMAWAN NURHAMDA (NIM : 1210 4044); Pembimbing : Prof. Dr. Ir. Irwandy Arif, MSc., S1 - Department of Mining Engineering
Dibuat : 2010, dengan 6 file

Keyword : underground mining, Tambang bawah tanah,

Pada Tambang bawah tanah (underground mining), ada 3 pekerjaan penting yang merupakan inti dari proses penambangan di bawah tanah, yaitu : pembuatan jalan masuk untuk pekerja dan peralatan tambang, penggalian bijih dari massa batuan serta pengangkutan bijih ke permukaan. Untuk menunjang semua aktifitas tersebut dibutuhkan penggalian lubang bukaan bawah tanah. Pada penelitian ini akan dibuat model penampang lubang bukaan berbentuk lingkaran dengan kedalaman lubang permukaan 50 m, 100 m, 150 m, 200 m, 500 m dan 1000 m. Kemudian dilakukan analisis terhadap nilai perpindahan dan


tegangan menggunakan perangkat lunak UDEC (Universal Distinct Element Code) dan akan dibandingkan dengan hasil perhitungan dengan metode analitik.


Perhitungan dengan perangkat lunak UDEC akan memberikan hasil :

• Hasil perhitungan perpindahan menggunakan menggunakan metode elemen distinct mempunyai perbedaan rata-rata 7,84% pada perpindahan arah-X dan 9,20% pada perpindahan arah Y dibandingkan dengan hasil perhitungan dengan metoda analitik.

• Hasil perhitungan tegangan prinsipal menggunakan menggunakan metode elemen distinct mempunyai perbedaan rata-rata 3,20% pada tegangan prinsipal mayor dan 5,93% pada tegangan prinsipal minor dibandingkan dengan hasil perhitungan dengan metoda analitik.

• Distribusi tegangan tarik yang tercipta akan semakin banyak dengan bertambahnya kedalaman lubang bukaan.

• Pada dinding lubang bukaan semakin dalam lokasi lubang bukaan, arah perpindahan akan mengarah ke arah luar lubang bukaan.

• Hasil perhitungan dengan menggunakan perbandingan geometri 30D akan lebih mendekati hasil perhitungan analitik dibandingkan perbandingan geometri 20D, 10D, dan 5D.

Deskripsi Alternatif :

In underground mines, there are three important works of the underground mining process, these are: the creation of the entrance to the mine workers and equipment, extracting ore from the rock mass and the transport of ore to the surface. To support all these activities required the excavation underground opening. This research will be made a circular tunnel with a depth from the surface of 50 m, 100 m, 150 m, 200 m, 500 m and 1000 m. Then we analyze the displacement and stress values using the software UDEC (Universal distinct element code) and then we compare with the result from analytical method. The calculation using UDEC software will give you the results:

• The results of displacement calculations using distinct element method has a average difference of 7,84% on the horizontal displacement and 9.2% on the vertical displacement compared to the results of calculations from the analytical method.

• The results of principal stresses using distinct element methods has a average difference of 3,2% on major prinsipal stress and 5,93% on minor prinsipal stress compared to the results of calculations from the analytical method.

• Distribution of tensile stress that is created will be more and more with the increasing depth of the hole openings.

• At the tunnel wall, the increasing depth of the hole opening, thedirection of displacement will rotate from directed inside to the outside of tunnel.

• The results of comparative calculations using geometric 30D will be closer to the results of analytical calculations than using geometry 20D, 10D, and 5D.

Beri Komentar ?#(1) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Department of Mining Engineering
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Prof. Dr. Ir. Irwandy Arif, MSc., Editor: PKL-SMK

File PDF...