Path: Top > S1-Final Project > Civil Engineering-FTSL > 2014

PERENCANAAN PELAKSANAAN KONSTRUKSI PROYEK PEMBANGUNAN GEDUNG KANTOR PUSAT RAMAYANA

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:25:51
Oleh : SEPTIARIF ( NIM : 15009124 ), Department of Civil Engineering
Dibuat : 2014, dengan 8 file

Keyword : metode pelaksanaan, sumber daya, penjadwalan, estimasi biaya

Dewasa ini, sedang marak dilakukan proyek pembangunan infrastruktur, salah satunya adalah proyek pembangunan gedung kantor pusat Ramayana. Diperlukan perencanaan pelaksanaan konstruksi pada setiap proyek pembangunan, agar pekerjaan – pekerjaan konstruksi dapat berjalan lancar tanpa hambatan. Tujuan kajian tugas akhir ini adalah merencanakan kembali perencanaan pelaksanaan


konstruksi gedung kantor pusat Ramayana yang terdiri dari metode pelaksanaan, penjadwalan, kebutuhan sumber daya manusia, dan estimasi biaya. Tugas akhir ini dilakukan dengan menggunakan dasar berupa dokumen RKS, bill of quantity, kurva-S dari pihak pelaksana, serta dokumentasi pelaksanaan dari pihak pelaksana. Penjadwalan dilakukan dengan bantuan software Microsoft


Project 2010 dan penentuan kebutuhan sumber daya serta estimasi biaya menggunakan Buku Pedoman Analisa Harga Satuan Pekerjaan dari PU. Metode pelaksanaan, penjadwalan, kebutuhan sumber daya, dan estimasi biaya


direncanakan berbeda dari perencanaan kontraktor. Hasilnya, perencanaan dengan metode pelaksanaan tiang pancang menggunakan pile driver hydraulic hammer,


durasi dengan waktu 432 hari, dan total biaya adalah Rp 69.676.962.670,10.

Deskripsi Alternatif :

Nowadays, infrastructure development projects are emerging in this country, one of those projects is contruction project of Ramayana Head Office. Construction delivery planning is required for any construction project in order to keep the construction works away from any resitance. The purposes of this thesis are to replanning the building’s construction delivery planning which consists of implementation method, scheduling, total resource, and cost estimation. This thesis is done using contractor’s specification documents, bill of quantity, Scurve of the implementing agency, as well as documentation of construction by the contractor. Scheduling is done with the help of software Microsoft Project 2010 and “Buku Pedoman Analisa Harga Satuan Pekerjaan” from PU. Construction method, scheduling, total resource, dan cost estimation are also planned differently from contractor’s planning. The results are construction delivery planning with driven pile using pile driver hydraulic hammer, duration is 432 days, and total cost is Rp69.676.962.670,10.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiD
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • pembimbing :


    Ir. Muhamad Abduh, M.T., Ph. D, Editor: Alice Diniarti

File PDF...