Path: Top > Member > sugono@unix.lib.itb.ac.id

PEMODELAN OPTIMASI ALOKASI AIR SUB DAERAH ALIRAN SUNGAI CISOKAN

WATER ALLOCATION OPTIMATION MODEL FOR CISOKAN RIVER BASIN

Master Theses from #PUBLISHER# / 2006-02-01 15:54:43
Oleh : Irene Irmamuti, S2 - Electrical Engineering
Dibuat : 2005-06-00, dengan 1 file

Keyword :

demand, availability, water alocation, service priority
Nomor Panggil (DDC) :
T 627.12 IRM
Sumber pengambilan dokumen : 20051112

Abstrak:

Air adalah sumber kehidupan dan mengambil peranan yang penting dalam menunjang aktifitas manusia. Perkembangan yang terjadi di Sub Daerah Aliran Sungai (Sub DAS) Cisokan memerlukan sarana dan prasarana yang memadai, termasuk ketersediaan air. Sub DAS Cisokan merupakan salah satu Sub DAS Citarum di Provinsi Jawa Barat. Sungai Cisokan mempunyai potensi yang dapat digunakan untuk memenuhi kebutuhan air baku di Sub DAS Cisokan. Agar dapat dipenuhi kebutuhan air ini maka ketersediaan aimya harus mencukupi dan hal ini diatur dengan pengelolaan alokasi air.

Ketersediaan air dihitung dengan menggunakan model hujan limpasan National Rural Electrical Cooperation Agency (NRECA) dengan memanfaatkan data curah hujan bulanan dan evapotranspirasi bulanan dikarenakan data debit bulanan Sungai Cisokan kurang lengkap. Sedangkan untuk analisis alokasi air aplikasinya mengembangkan alokasi air secara optimal dengan metode Linear Programing (LP) dan membagikannya ke daerah layanan dengan mempertimbangkan kondisi lapangan. Model alokasi air yang digunakan adalah Water Resources Management Model (WRMM). WRMM dikembangkan oleh Alberta Environment di Kanada. Model ini dikembangkan sebagai perangkat perencanaan untuk pemanfaatan sumber daya air, dengan pendekatan daerah aliran sungai. Prioritas alokasi air ditentukan dengan sistem poin penalti dan teknik program Tinier digunakan untuk meminimumkan jumlah seluruh penalti.

Ada dua alternatif prioritas alokasi air di Sub DAS Cisokan. Prioritas pertama adalah memberikan tingkat layanan yang sama dan atau berdasarkan peraturan perundangan yang berlaku, dimana air baku untuk air bersih dan irigasi eksisting adalah merupakan prioritas pertama.

Setelah didapatkan solusi yang optimal, dilakukan analisis dampak alokasi air menurut dua prioritas utama yang telah ditetapkan tersebut, lalu memberikan rekomendasi kebijakan prioritas untuk alokasi air berdasarkan hasil WRMM tersebut. Berdasarkan basil perhitungan WRMM didapat alternatif prioritas yang terpilih, yaitu dengan memberikan pelayanan alokasi air sesuai dengan peraturan perundangan yang berlaku yaitu berdasarkan Undang-Undang RI No. 7 tahun 2004 tentang Sumber Daya Air.

Deskripsi Alternatif :

Abstract:

Water is source of life and has an important role to support human activities. Development in Cisokan River Basin need quality infrastructure support, including water availability. Cisokan River Basin is one of Citarum River Basin in West Java Province. Cisokan River has a potent to use to fulfill raw water for Cisokan River Basin. To cover water demand with enough water supply, it can be managed with water allocation.

Water availability is calculated by National Rural Electrical Cooperation Agency (NRECA) run off rain fall model using monthly rain fall and monthly evapotranspiration data because monthly discharge data is not complete enough. For water allocation analysis in Cisokan River Basin, the application is to develop water allocation optimally with Linear Programming Method (LP) and to distribute to service area which consider field condition. One of water allocation models is Water Resources Management Model (WRMM). The WRMM was developed by Alberta Environment in Canada. It is a large computer model, developed as a planning tool for water resources utilization, with a river basin being the fundamental unit of study. Water allocation priorities are defined by a penalty point system and an LP technique is used to minimize the over all penalty.

There are two alternatives of priorities for water allocation in Cisokan River Basin. The first is giving same service for all demands and the second is according to water resources regulation, which is raw water for water supply and existing irrigation are the first priority for water allocation.

Analyze about water allocation impact according to two alternatives of priorities will be done after optimal solution reached. The chosen priority can be recommended for the best water allocation application. According to WRMM result, the chosen priority for water allocation in Cisokan River Basin is giving service according to water resources regulation.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing 1:
    Iwan Kridasantausa, Dr.Ir.

    Pembimbing 2:
    Suardi Natasaputra, Ir., M.Eng

    Scan:
    Sugono (2006-02-01)

    , Editor: sugono@#publisher#

File PDF...