Path: TopMemberhidayat@unix.lib.itb.ac.id

PERANCANGAN PONDASI PANGKAL PILAR JEMBATAN BARU BR 355 KM 110 + 532 PADA PARTIAL DOUBLE TRACK CIGANEA - SUKATANI

Master Theses from / 2006-06-21 13:22:18
Oleh : P.S. Budi Widodo, S2 - Trains Engineering
Dibuat : 2001-06-00, dengan 1 file

Keyword :

Perancangan, Pondasi, Rel kereta api Design, Fondation, Railroads


Subjek :
Railroads - Engineering geology

Kepala Subjek :
Engineering

Nomor Panggil (DDC) :
T 625.122 WID

Sumber pengambilan dokumen : Tesis Magister Teknik Perkeretaapian. (20052488)

Abstrak :

Untuk meningkatkan kapasitas lintas antara Cikampek dan Padalarang, Pemerintah Indonesia sedang membangun jalur kereta api kedua di samping jalur yang ada sekarang. Jalur kereta api kedua ini terletak pada tiga lokasi yang berbeda. Pertama adalah antara Cikampek dan Purwakarta (1 19 km), ke dua antara Ciganea dan Sukatani (16,1 km) dan ke tiga antara Plered dan Cisomang (16,2 km). Oleh karena lokasi untuk jalur kereta api ke dua itu terletak pada daerah pegunungan, beberapa jembatan harus dibangun. Salah satu jembatan itu adalah jembatan BH 355.

Semua beban yang bekerja pada bangunan alas akan diteruskan ke lapisan tanah pendukung melalui pondasi. Karena kestabilan jembatan sangat bergantung pada pondasinya, maka perencanaan pondasi harus dilakukan dengan cermat dan mempertimbangkan kestabilan jembatan di sampingnya dan metoda konstruksi yang dipakai.

Oleh karena pondasi yang direncanakan terletak di daerah pegunungan, peralatan berat untuk konstruksi sukar untuk mencapai lokasi. Sehingga dipilih cara manual dengan menggali tanah oleh tenaga manusia.

Beberapa pertimbangan diambil untuk mendapatkan sampai pada desain pondasi yang memadai dan aman. Pertimbangan itu malibatkan penjelidikan tanah lapangan, pengujian tanah di laboratorium, pemilihan panjang don diameter pondasi tiang bor dan geometri kelompok tiangnya.

Kelompok pondasi dengan panjang Jim dan diameter 1,5 m pada pangkal dan panjang 11 m dan diameter 1,8 m pada pilar dipilih untuk memikul beban yang bekerja pada masing-masing pangkal atau pilar. Daya dukung pondasi dihitung secara manual dan dicek menggunakan program komputer GROUP yang mampu mempertimbangkan mekanisme pengalihan beban dari tiang ke tanah disekelilingnya.

Deskripsi Alternatif :

Abstract :

In order to increase the line capacity between Cikampek and Padalarang, the Government of Indonesia is currently constructing the second track besides the existing track. These second tracks are constructing at three different location. First, the second track between Cikampek and Purwakarta (f 19 kms), second between Ciganea and Sukatani (I-6.1 kms), and third between Plered and Cisomang (t 6.2 kms). Because the locations for the second tracks are at the mountaneous area, several bridges must be built. One of the bridges is the bridge number BH 355.

All the loads which work on the super structure will be transfered to the bearing layer of the ground through the finn foundations. Because the stability of the bridge really depends on the bridge foundations, the design of the foundation should be taken carefully and consider the stability of existing bridge and construction method.

Because the foundation site is located at the mountainous area, the heavy equipment for construction is difficult to reach the site. Therefore manual site boring for foundation is chosen.

Some considerations during design are taken to obtain reliable and safe foundation. These considerations involve soil exploration, soil laboratory test, selection of the length and diameter of the bored pile and also the pile group geometry.

Group of bored pile with 11m length and 1,5 m diameter for abutment and 11 m length and 1,8 m diameter for pier is chosen to carry the loads act on it. The foundation bearing capacity is calculated manually and checked by the computer software GROUP, that is able to consider the load transfer mechanism from pile foundation to the adjacent soil.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID Publisher
OrganisasiS
Nama KontakYoka Adam Nugrahaa, S.Sos.
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing :
    Masyhur Irsyam, Ir.MSE., Ph.D

    Scan :
    Hidayat (2006-06-21)

    , Editor: hidayat@

File PDF...