MODEL PENGUKURAN DAN BENCHAMARKING PRODUKTIVITAS KONSTRUKSI GEDUNG DENGAN MENGGUNAKAN LAPORAN KEMAJUAN PEKERJAAN PROYEK STUDI KASUS PADA ITB DEVELOPMENT PROJECT (OECF- LOAN)
DI ITB-BANDUNG

Master Theses from / 2004-12-02 00:31:05
Oleh : Waluyo Nuswantoro, S2 - Civil Engineering
Dibuat : 1998-00-00, dengan 1 file

Keyword : produktivitas konstruksi, benchmarking, laporan
kemajuan pekerjaan proyek.
Nomor Panggil (DDC) : T 624.068 5 NUS
Sumber pengambilan dokumen : 98/790

Produktivitas merupakan salah satu faktor mendasar yang mempengaruhi performansi industri konstruksi. Persaingan yang sangat ketat di industri konstruksi menyebabkan produktivitas merupakan hal yang sangat penting bagi setiap perusahaan konstruksi, yang akan mempengaruhi kemampuan bersaing mereka. Masalah belum dimilikinya suatu standar produktivitas konstruksi balk di tingkatan proyek maupun di tingkatan pekerjaan yang Iebih rendah, sangat dirasakan oleh industri jasa konstruksi di Indonesia. Sementara pada proyek terdapat informasi berharga yang pada umumnya belum dimanfaatkan secara maksimal. Penelitian ini berusaha menggali dan memanfaatkan data yang diperoleh dari sistem administrasi yang umum ada pada setiap proyek, yaitu Laporan Kemajuan Pekerjaan Mingguan. Laporan Kemajuan Pekerjaan ini merupakan sumber penting untuk membangun suatu model pengukuran dan benchmarking produktivitas konstruksi gedung. Model produktivitas yang diusulkan ini mengambil studi kasus pada ITB Development Project (OECF-Loan) untuk kategori bangunan institutional building.

Deskripsi Alternatif :

performance of construction industry. The productivity factor is a very important substance for the construction firm to determine their ability to compete in very tight construction industry competition. Problem suffered by the Indonesian construction industry is its lack of productivity standard at either project or lower task levels. Fortunately, there is valuable information resource available that are currently not fully utilized. This research attempts to farther comprehend and utilize data compiled from general administration system, which is currently available in every project, generally known as the weekly progress report. This type of report can be important for building productivity measurement model, as well as for benchmarking of the building construction productivity. Productivity measurement model proposed in this research was based on case study at ITB Development Project (OECF-Loan) for institutional building type.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID Publisher
OrganisasiS
Nama KontakYoka Adam Nugrahaa, S.Sos.
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon022 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing 1 : Krishna Suryanto Pribadi, Editor: cecep@

File PDF...