RENCANA PENCAPAIAN CRITICAL SUCCESS FACTORS MANAJEMEN RISIKO PROYEK LANDMARK RESIDENCE PT PP (PERSERO) TBK

Undergraduate Theses from JBPTITBPP / 2017-09-28 11:35:56
Oleh : RIVA MALIDA FADILAH PERMADI (NIM : 14413026), S1 - Management Engineering-FTI
Dibuat : 2017-09-28, dengan 1 file

Keyword : proyek konstruksi, manajemen risiko, critical success factors (CSF), metode Delphi, matriks GQM (Goals Questions Metric).

Proyek Landmark Residence adalah salah satu proyek konstruksi yang saat ini sedang dijalankan oleh PT PP (Persero) Tbk di Kota Bandung. Proyek Landmark Residence yang tergolong ke dalam proyek konstruksi reguler menjalankan sistem manajemen risiko secara mandiri dengan masing-masing anggota unit kerja yang berperan sebagai risk owner. Proyek Landmark Residence menghadapi permasalahan dalam menjalankan manajemen risiko proyek, karena minimnya pedoman untuk menjalankan manajemen risiko proyek dengan baik.

Rencana penerapan critical success factors (CSF) manajemen risiko akan dirancang untuk mengatasi permasalahan manajemen risiko yang dihadapi oleh tim Proyek Landmark Residence. Penerapan CSF manajemen risiko bertujuan untuk membantu tim proyek mencapai kesuksesan dalam menjalankan manajemen risiko yang akan menunjang kesuksesan proyek secara keseluruhan. Identifikasi CSF manajemen risiko akan mengacu kepada literatur mengenai CSF manajemen risiko proyek konstruksi yang disesuaikan dengan kondisi Proyek Landmark Residence melalui pengumpulan pendapat pakar dengan metode Delphi.

CSF manajemen risiko proyek Landmark Residence yang terpilih adalah sebanyak 18 faktor dengan 4 kategori pengelompokkan. Rencana pencapaian CSF manajemen risiko Proyek Landmark Residence terdiri dari perancangan alat ukur CSF, penilaian tingkat ketercapaian CSF, dan penyusunan rencana pencapaian CSF. Perancangan alat ukur CSF dilakukan menggunakan metode matriks GQM (Goals Question Metric). Rencana pencapaian CSF akan dijalankan oleh tim Proyek Landmark Residence sepanjang siklus hidup proyek untuk mencapai kesuksesan manajemen risiko proyek.

Rencana pencapaian CSF menghasilkan perbaikan dokumen manajemen risiko proyek, rancangan SOP (Standard Operating Procedure), dan saran untuk melakukan survei mengenai kebutuhan pelatihan manajemen risiko oleh divisi manajemen risiko PT PP Persero (Tbk).

Deskripsi Alternatif :

Landmark Residence Project is one of the construction project held by PT PP (Persero) Tbk. Landmark Residence Project as one of regular construction project performing project risk management system by project team itself as risk owner. Some problems is faced by project team member while performing risk management system caused by the lack of risk management guidance from the organization itself. Project team only focus on mitigation process instead of the whole project risk management processes which affecting the effectiveness of risk management and project management.

Identification of critical success factors (CSF) for project risk management will help project team to reach the success of risk management process. CSF are the few key areas of activities in which favorable results are absolutely necessary for a particular manager to reach his goal. The goal to be reached for risk management is the success of risk management process implementation.

Based on the literature review and expert judgment, 18 CSF are identified and grouped into 4 categories. Delphi method was used to collect the expert judgment for the CSF identification process. Achievement plan for the project risk management CSF consist of 3 stages; tools for measuring CSF, measuring CSF for Landmark Residence risk management process, and plan to achieve the CSF for Landmark Residence project. Tools for measuring CSF was designed based on GQM (Goals Question Metric) matrix to help project team member measuring the achievement of CSF.

The results from CSF achievement plan are improvement for risk management document, premilinary design of risk management process SOP (Standard Operating Process), and suggestion for risk management division to hold risk management training needs survey.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Suprayogi, Ph.D., Editor: Alice Diniarti

File PDF...