PERANCANGAN SISTEM PIPA PENYALUR AIR BAKU DARI KELURAHAN PULO GEBANG SAMPAI CAKUNG

Design of Water Pipe System from Kelurahan Pulo Gebang to Cakung

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:41:03
Oleh : RHINO FIELDIANTO (NIM 13104091), S1 - Department of Mechanical Engineering
Dibuat : 2008, dengan 7 file

Keyword : pipa air baku, pipa tanam, jembatan pipa, analisis biaya, instalasi pompa, instalasi pipa

Air merupakan kebutuhan dasar manusia. Kawasan industri di daerah pantai Jakarta utara tidak dapat berkembang dengan baik apabila jumlah pasokan air bersihnya tidak mencukupi. Kawasan industri memerlukan air berkualitas baik yang murah dengan kapasitas yang berkelanjutan sepanjang tahun. Sungai Kalimalang, sebagai sumber air utama Jakarta, dinilai mampu untuk memenuhi kebutuhan tersebut. Namun, karena jarak antara Sungai Kalimalang dan Jakarta Utara jauh, maka dibutuhkan pembuatan sistem pipa penyalur air baku. Pembuatan sistem pipa ini membutuhkan perencanaan dan perancangan yang baik dan ekonomis.

Oleh karena itu, pada Tugas Akhir ini akan dilakukan perancangan jalur pipa air sesuai AWWA M11 dan ASME B31.3. Jalur yang dirancang adalah sistem pipa baja dari Kelurahan Pulo Gebang sampai Cakung yang sebagian besar ditanam di dalam tanah dan berada di sisi Jalan Tol Lingkar Utara Jakarta. Perancangan dilakukan dengan menganalisis gaya internal, analisis gaya eksternal sesuai dengan kondisi jalur, analisis hidraulik, pemilihan pompa, serta analisis biaya produksi. Selain itu, juga dilakukan perancangan struktur jembatan pipa dan pemodelan keseluruhan jalur pipa dengan perangkat lunak CAESAR II dan Pipe Flow Expert.

Pipa 16 inch schedule 20 untuk pipa tepi jalan dan schedule 30 untuk pipa menyeberangi jalan disimpulkan cocok untuk digunakan. Pompa penguat yang digunakan memiliki tenaga 100 hp. Biaya produksi per meter kubik hasil sistem yang dirancang adalah sebesar Rp 2.656 yang masih dibawah harga air di pasaran.

Deskripsi Alternatif :

Water is human's basic need. Industrial area located near beach of North Jakarta can't develop well if the amount of clean water is not adequate. Industrial area needs good quality water, cheap, and can be produced along of year. Kalimalang River, as Jakarta's water source, undoubtly capable to fulfill those requirements. But, because Kalimalang River is far from North Jakarta, there is a need to build water pipeline system. Water pipeline should be built with good plan and design to deliver good and economical output.

Because of that reason, this thesis will make a plan of water pipeline appropriate with AWWA M11 and ASME B31.3. The planned pipeline is use steel pipe system from Kelurahan Pulo Gebang until Cakung, which is most of it will be buried and located near Lingkar Utara Jakarta Highway. Design process conducted by internal force analysis, external force analysis, hydraulic analysis, pump selection, and also cost analysis. Beside of those, design process also conducts pipe bridge structure design and modeling of whole pipeline in computer software by CAESAR II and Pipe Flow Expert.

The conclusion are 16 inch schedule 20 steel pipe is used for pipe that buried in the side of highway and schedule 30 steel pipe for road crossing pipe. Water pipeline system using 100 horsepower booster pump. Water production cost per meter cubic of pipeline system is Rp 2.656 which is still under of market water cost.

Copyrights : Copyright Â(c) 2001 by ITB Central Library. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(1) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. Bagus Budiwantoro, Editor: Vika A. Kovariansi

File PDF...