Path: TopS1-Final ProjectPetroleum Engineering-FTTM2006

EVALUASI KINERJA RESERVOIR X DALAM MENYUPLAI FLUIDA PANASBUMI KE PLTP BERKAPASITAS 20 MW

EVALUATION OF X RESERVOIR PERFORMANCE IN SUPPLYING GEOTHERMAL FLUID TO A 20 MW POWER PLANT

Undergraduate Theses from JBPTITBPP / 2017-09-27 10:37:32
Oleh : PUDYO HASTUTI (NIM : 12202026), S1 - Department of Petroleum Engineering
Dibuat : 2017-07-17, dengan 1 file

Keyword : simulasi reservoir panasbumi, kinerja reservoir

Lima sumur telah dibor di lapangan panasbumi X. Data landaian tekanan dan temperatur menunjukkan reservoir panasbumi tersebut merupakan reservoir dominasi air yang memiliki temperatur diatas 200oC (hingga mencapai temperatur 330oC). Perhitungan cadangan dengan metoda volumetrik menunjukkan bahwa lapangan panasbumi tersebut memiliki potensi listrik 108 MWe. Direncanakan di lapangan tersebut akan dibangun PLTP dengan kapasitas terpasang 20 MWe. Diperkirakan uap yang dibutuhkan oleh PLTP tersebut adalah 105 kg/detik.


Pemodelan reservoir dilakukan untuk memprediksi kinerja reservoir selama masa produksi atau masa pembangkitan listrik. Model dikembangkan dengan menggunakan simulator TOUGH2. Model diuji validasinya dengan membandingkan tekanan dan temperatur hasil perhitungan model dengan hasil pengukuran di lapangan pada keadaan awal, sebelum reservoir tersebut diproduksikan (kondisi alamiah). Hasil simulasi menunjukkan tercapainya keselarasan tekanan dan temperatur yang cukup baik. Model selanjutnya digunakan untuk memprediksi kinerja reservoir selama 25 tahun. Hasil simulasi menunjukkan bahwa lapangan ini mampu menyuplai uap ke PLTP berkapasitas 20 MWe dengan penginjeksian air tanpa mengalami penurunan tekanan dan temperatur yang cukup besar.

Deskripsi Alternatif :

Five wells have been drilled in X geothermal field. The profiles of pressure and temperature show that this geothermal reservoir is classified as a water-dominated reservoir which has temperature above 200oC (up to 310oC). Reserve calculation using volumetric method shows that X geothermal field has electricity potential of 108 MWe. A geothermal power plant will be built in this field with installed capacity of 20 MWe. It is estimated that the power plant wil consume steam of 105 kg/s.


Reservoir simulation was carried out to predict the reservoir performance during production or electricity generation period. Model was developed using TOUGH2 simulator. The model is validated by comparing the pressure and temeperature from the result of calculation with measured (field) data at their natural state condition, before the reservoir is exploited. The simulation results show a good match. Model is then used to predict the reservoir performance for the next 25 years. The simulation results show that this reservoir is able to supply steam to the 20 MWe power plant with water injection without having significant pressure and temperature depletion.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Department of Petroleum Engineering
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing : Dr. Ir. Nenny Miryani Saptadji, Editor: Suharsiyah

File PDF...