Path: Top > S1-Final Project > Meteorology-FITB > 2016

ANALISIS WATER BALANCE TERHADAP POTENSI OVERTOPPING PADA TAILING STORAGE FACILITY (TAILING DAM) (STUDI KASUS: PT. ANTAM TBK UBPE PONGKOR, JAWA BARAT)

WATER BALANCE ANALYSIS FOR DETERMINING POTENTIAL OVERTOPPING IN TAILING STORAGE FACILITY (TAILING DAM) (CASE STUDY: PT. ANTAM TBK. UBPE PONGKOR, WEST JAVA)

Undergraduate Theses from JBPTITBPP / 2017-09-27 11:45:46
Oleh : NUR ALFI LAILAH AHSAR (NIM: 12811042); Pembimbing: Dr. Plato Martuani Siregar, M.Si , S1 - Department of Geophysics and Meteorology
Dibuat : 2016, dengan 6 file

Keyword : Tailing Dam, Overtopping, Curah Hujan Rencana, Log Pearson Type III, Water Balance

Daerah pertambangan PT. Antam Tbk. UBPE Pongkor – Jawa Barat terletak pada Daerah Aliran Sungai (DAS) Cisadane. Fluktuasi aliran Sungai Cisadane sangat bergantung pada curah hujan di daerah tangkapannya. Bagian dari kegiatan pertambangan yang sangat erat hubungannya dengan lingkungan adalah pada Tailing Storage Facility (Tailing Dam) yang sering ditemukan terjadinya kegagalan atau kecelakaan yang berupa pelimpahan (overtopping) sehingga memberikan dampak buruk pada lingkungan sekitarnya. Oleh karena itu, diperlukan kajian periode ulang hujan dan debit rencana serta analisis water balance untuk mengetahui potensi terjadinya risiko pelimpasan (Overtopping) pada tailing dam akibat curah hujan lebih. Metode yang digunakan dalam penelitian ini adalah metode distribusi Log Pearson Type III (perhitungan hujan rencana), metode Mononobe (perhitungan intensitas curah hujan dalam periode ulang tertentu), HEC-1 (perhitungan debit puncak) serta analisa water balance (perhitungan volume overtopping). Curah hujan rencana periode ulang 2 tahun untuk DAS Cisadane adalah 89.7 mm. Debit rencana pada outlet 1, outlet 2, dan outlet 3 secara berturut-turut periode ulang 2 tahun adalah 221.136, 282.6, dan 290.204 m3/s. Overtopping berpotensi terjadi ketika curah hujan lebih bernilai tinggi di atas rata-rata bulanannya, dan tidak adanya penambahan volume pengerukan tailing. Sehinggadari hasil perhitungan water balance periode ulang 2 tahun, overtopping terjadi pada bulan Januari tahun 2006 dengan volume overtopping sebesar 43409.01 m3, bulan Juli, Agustus, September, Oktober, November, dan Desember Tahun 2007 dengan volume overtopping masing-masing sebesar 2569.369169, 1502.091895, 933.7635652, 619.1217028 , 460.5130713, dan 415.6718712 m3, dan bulan Februari Tahun 2008 dengan volume overtopping sebesar 3459.657 m3.

Deskripsi Alternatif :

Mining area of PT. Antam Tbk. UBPE Pongkor – West Java located at Watershed Cisadane. Part of mining activities are very closely related to the environment is on the Tailings Storage Facility (Tailings Dam). At the Tailings Storage Facility (Tailings Dam) common occurrence of a failure or accident that called overtopping which had an adverse impact on the surrounding environment. Therefore, it is necessary to study the return period rainfall, discharge plans, and water balance analysis to determine the potential risk of tailings dam’s overtopping due to heavier rainfall. Some methods used in this research is Log Pearson Type III method (calculation rainfall plan), Mononobe method (calculation of rainfall intensity in the return period specified), HEC-1 (calculation of peak discharge), and analysis of water balance ( overtopping volume calculation). Analysis of water balance which will be evaluated are monthly evapotranspiration, base flow and surface runoff in order to find the volume of runoff (overtopping) in the tailings dam. Return period rainfall’s plan for 2 years for the watershed Cisadane are 89.7 mm. Flood discharge outlet plan on outlet 1, outlet 2, and outlet 3 respectively in m3/second is a 2-year return period 221.136, 282.6, and 290.204. Overtopping can occur when rainfall is more valuable over the monthly average, and the absence of additional volumes of dredging the tailings. So from the calculation of water balance over a turn period of 2 years, overlapping occurs in January 2006 overtopping volume is 43409.01 m3 , then July, August, September, October, November, and December of 2007 with a volume of overtopping respectively 2569.369169, 1502.091895, 933.7635652, 619.1217028 , 460.5130713, dan 415.6718712 m3, and February 2008 with volume of overtopping respectively 3459.657 m3.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Plato Martuani Siregar, M.Si, Editor: PKL-SMK

File PDF...