MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY

MULTI CRITERIA DECISION MAKING OF ELECTRICAL SUBMERSIBLE PUMP (ESP) PROCUREMENT SYSTEM IN CINTA COMPANY

Master Theses from JBPTITBPP / 2018-06-09 10:50:47
Oleh : NATASYA PRAMUDITA ARIANI (NIM 29316105), S2 - Business Administration-SBM
Dibuat : 2018-06-09, dengan 1 file

Keyword : Multi Criteria Decision Making, Analisa Kontrak, Electrical Submersible Pump, Analytical Hierarchy Process

Kegiatan produksi di Perusahaan CINTA (nama asli perusahaan harus disamarkan karena data bersifat konfidensial) dilakukan dengan pemasangan pompa produksi atau yang biasa disebut dengan ESP (Electrical Submersible Pump). ESP yang dipasang di Perusahaan CINTA adalah ESP yang disewa dari vendor A dan B, terdapat dua vendor yang menyokong 3 paket pompa (paket Alpha,Beta,dan Charlie) di perusahaan CINTA. Permasalahan dalam kasus ini adalah kontrak pembelian ESP akan berakhir di akhir tahun 2018 nyaris bersamaan dengan berakhirnya kontrak pembelian Perusahaan CINTA di Indonesia pada bulan September 2018. Perusahaan CINTA diharuskan untuk menyelesaikan kontrak ESP secepat mungkin disamping berkaitan dengan kontrak Perusahaan CINTA yang akan habis, juga untuk mempertahankan produksi lapangan CINTA.

Penelitian ini menggunakan salah satu metode Multi Criteria Decision Making (MCDM) yaitu Analytical Hierarchy Process (AHP) yang menggunakan 5 kriteria yang ditentukan oleh para ahli yaitu waktu, biaya, tehnikal, operasional, dan operasional pendukung, 11 subkriteria yaitu persiapan kontrak pembelian ESP, masa kontrak perusahaan CINTA, biaya terminasi, harga ESP, spsifikasi ESP, ketahanan ESP, pengalaman di offshore, pengalaman krew, keselamatan, transportasi ESP, dan gudang ESP dan 2 alternatif yaitu dengan memperpanjang kontrak dan membuat kontrak baru. Bobot dari kriteria ditentukan dengan menggunakan pairwise comparison matrices. Selain itu untuk mendukung perhitungan AHP, data kuantitatif juga di gunakan pada penelitian ini dengan dikombinasikan dengan FGD (Focus Group Discussion ) dan juga wawancara yang tidak terstruktur. Hasil yang didapat dari analisa diatas adalah penentuan kontrak yang sesuai dengan kondisi keadaan Perusahaan CINTA saat ini yaitu memperpanjang kontrak saat ini selama satu tahun. Hasil studi yang didapat akan diberikan kepada pihak manajemen sebagai bahan pertimbangan untuk penentuan kontrak di tahun ini.

Deskripsi Alternatif :

Production activities in CINTA Company (real name of company is disguised due to confidentiality) are using a production pump or commonly called ESP (Electrical Submersible Pump). ESP installed in CINTA Company belong to the vendor A and B. Based on the current procurement contract, there are two vendor that supplying the 3 package pump (package Alpha,Beta,and Charlie) in CINTA Company. The problem in this case is the ESP procurement contract will be expired at the end of 2018 simultaneously with the CINTA Company expired procurement contract in Indonesia in September 2018.

The methods of this research are of Multi Criteria Decision Making (MCDM) that is Analytical Hierarchy Process (AHP) using 5 criteria ; time, cost, technical, operatiomn, and operation support, 11 subcriteria ; procurement contract preparation, company expired, termination cost, ESP price, ESP specification, ESP reliability, offshore experience, crew experience, safety, ESP warehouse, and ESP transportation, and 2 alternatives, extend the procurement contract and create a new procurement contract. The weight of the criteria is determined by using pairwise comparison matrices of the AHP. Beside, the qualitative hystorical data also support the AHP result combining with the FGD (Focus Group Disscussion) between the expert also the unstructural interview between the expert.

The best decision are extending the current procurement contract for one year. The results of the study will be given to the management as a consideration for the determination of the procurement contract in this year.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS2 - Business Administration-SBM
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Yos Sunitiyoso, Ph.D, Editor: Roosalina Vanina Viyazza

File PDF...