Path: Top > S1-Final Project > Water Resources Engineering and Management-FTSL > 2017

PERENCANAAN DESAIN BANGUNAN PELIMPAH BENDUNGAN SADAWARNA DI KABUPATEN SUBANG, JAWA BARAT

SPILLWAY DESIGN PLAN FOR SADAWARNA DAM IN SUBANG REGENCY WEST JAVA

Undergraduate Theses from JBPTITBPP / 2017-09-27 15:55:30
Oleh : NADRATUN NA’IMA - NIM : 15813040 , S1 - Water Resources Engineering and Management
Dibuat : 2017-09-27, dengan 1 file

Keyword : Bendungan, Spillway, Sadawarna, HEC-RAS

Bendungan Sadawarna terletak di Kabupaten Subang, Jawa Barat dengan luas DAS sebesar 345 km2 dan satu bagian utamanya yaitu bangunan pelimpah (spillway). Bangunan pelimpah berfungsi sebagai pengaman tubuh bendungan terhadap overtopping, yaitu dengan membuang air yang berlebihan agar mercu bendungan tidak terlampaui. Adapun tujuan dari penyusunan Tugas Akhir ini adalah untuk mendapatkan desain dan dimensi yang efektif serta memastikan stabilitas bangunan pelimpah pada Bendungan Sadawarna. Hasil perhitungan curah hujan rencana dengan Metode Gumbel untuk periode ulang 1.000 tahun adalah sebesar 162 mm/hari dan PMP sebesar 305,14 mm/hari. Pelimpah ini didesain dengan menggunakan Q1000 dan dikontrol dengan menggunakan QPMF. Untuk mengetahui kapasitas pelimpah dilakukan perhitungan penelusuran banjir lewat waduk dengan debit Q1000 sebesar 1.469,54 m3/det, sehingga tinggi muka air banjir yang melimpas direncanakan berada pada elevasi +84 meter dan elevasi puncak bendungan pada elevasi +87 meter. Bangunan pelimpah direncanakan terletak pada bendungan utama dengan tipe bendung pelimpah tipe Ogee serta tidak berpintu. Dimensi bangunan pelimpah didesain dengan lebar 75 m. Pada saluran transisi dan saluran peluncur direncanakan berbentuk segi empat dengan konstruksi dari beton dan lebar 40 m sedangkan saluran terompet memiliki lebar 45 m. Sesuai dengan kondisi topografi pada lokasi bangunan pelimpah, maka panjang total saluran transisi sampai dengan terompet adalah 165 m. Tipe peredam energi yang digunakan adalah USBR tipe III. Berdasarkan hasil pemodelan dengan menggunakan perangkat lunak HEC-RAS, dihasilkan bahwa dimensi bangunan pelimpah, saluran transisi, saluran peluncur, saluran terompet dan peredam energi memiliki dimensi yang cukup untuk mengkapasitasi debit Q1000 dan QPMF. Berdasarkan perhitungan stabilitas, dihasilkan bahwa bangunan pelimpah aman terhadap stabilitas guling, stabilitas geser dan eksentrisitas pada kondisi muka air banjir dengan gempa maupun non gempa, serta kondisi muka air normal dengan gempa maupun non gempa.

Deskripsi Alternatif :

Sadawarna Dam is located in Subang Regency, West Java with 345 km2 watershed areas and one of its main components is spillway. Spillway serves to ensure dam’s safety against overtopping by discharging excessive water. The purpose of this final project is to obtain the effective design and dimension and to ensure the spillway stability of Sadawarna Dam. The results of the rainfall distribution with Gumbel Method for 1,000 year return period is 162 mm/day and PMP is 305.14 mm/day. This spillway is designed by using Q1000 and controlled by using QPMF. The storage indication method is used to check the spillway capacity with the Q1000 discharge is 1,469.54 m3/s so that the flood water level that will spill is planned at +84 meter elevation and the dam crest at +87 meter elevation. The spillway is planned to be located at the main dam with selected type Ogee type spillway without doors. The spillway is designed with a width of 75 m. The transition channel and the chute channel are planned in rectangular shape with concrete and width of 40 m, while the trumpet channel has 45 m width. In accordance with the topographic conditions at the location of the spillway, the total length of from transition channel up to the trumpet channel is 165 m. The type of energy damper used is USBR type III. Modeling results by using HEC-RAS software shows that the dimensions of spillway, transition channel, chute channel, trumpet channel and energy damper have sufficient dimensions to encapsulate Q1000 and QPMF discharge. Stability calculation shows that the spillway is stable against the roll stability, shear stability and eccentricity in both flood water level and normal water level condition with earthquake and non-earthquake.

Copyrights : Copyright (c) 2001 by Perpustakaan Digital ITB. Verbatim copying and distribution of this entire article is permitted by author in any medium, provided this notice is preserved.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Ir. Dantje K Natakusumah, M.Sc., Ph.D.

    Hadi Kardhana, S.T., M.T., Ph.D , Editor: Irwan Sofiyan

File PDF...