Path: Top S1-Final Project Mining Engineering 2009

PERMODELAN DAN ESTIMASI SUMBERDAYA NIKEL LATERIT BLOK GB PULAU GEE, HALMAHERA TIMUR DENGAN MENGGUNAKAN PERANGKAT LUNAK STUDIO 3 DATAMINE

Undergraduate Theses from JBPTITBPP / 2014-03-12 14:35:20
Oleh : MUHAMMAD HAIZAL HAFIZ (NIM 12104015); Pembimbing : Dr. Ir. Komang Anggayana, M.S., S1 - Department of Geology
Dibuat : 2009, dengan 8 file

Keyword : Estimasi sumberdaya, Nikel laterit Blok GB, Perangkat lunak Studio 3 Datamine

Permodelan merupakan suatu kegiatan yang sangat penting untuk menggambarkan kondisi geologi dan karakteristik geometri suatu endapan. Karena setelah tahapan eksplorasi dilakukan, diperlukan desain serta analisis pada model badan bijih secara 3 dimensi sehingga dapat menentukan penerapan metode penambangan yang akan dilakukan.

Metode perhitungan sumberdaya/cadangan memiliki dua cara yaitu secara konvensional dan non konvensional. Didalam penelitian ini digunakan metode secara konvensional yaitu dengan metode pendekatan inverse distance power. Seiring dengan perkembangan teknologi, metode penaksiran sumberdaya secara konvensional ini dapat dimodifikasi secara komputerisasi dengan menggunakan perangkat lunak yang sudah ada sekarang ini tanpa mengubah filosofi perhitungannya sehingga pekerjaan menjadi lebih cepat.

Pemodelan dilakukan berdasarkan konsep model blok dimana sumberdaya dibagi menjadi blok-blok kecil untuk mendapatkan taksiran kadar yang detail. Ukuran blok sumberdaya yang digunakan adalah dimensi blok dalam X x Y x Z = ½ Jarak Spasi Antar Titik Bor (1/2 x 25 m), Y = ½ Jarak Spasi Antar Titik Bor (1/2 x 25 m) dan Z = 2 m (Berdasarkan Konvensi).

Dilihat dari hasil statistik bahwa nilai mean, skewness, dan varians Ni, Fe dan MgO antara blok utara dan blok selatan menghasilkan nilai yang tidak jauh berbeda dengan kesimpulan penyebaran nilai kadar pada blok utara dan selatan tersebut memiliki karakteristik yang hampir sama. Kemudian dari hasil analisis statistik Scatter Plot menunjukkan adanya dua populasi data yang berbeda dan menunjukkan tahap lateritisasi dari interpretasi korelasi variabel nilai kadar Ni terhadap Fe dan nilai kadar Ni terhadap MgO.

Penelitian ini menghasilkan estimasi jumlah sumberdaya nikel laterit Blok GB Pulau Gee yaitu zona limonit dengan jumlah tonnase 497.127,06 ton dengan kadar rata-rata Ni : 1,29 % ; Fe : 44,35 % ; MgO : 9,39 %, zona saprolit dengan jumlah tonnase 2.377.997,01 ton dengan kadar rata-rata Ni : 2,08 % ; Fe : 20,011 % ; MgO : 23,32 % sehingga jumlah sumberdaya nikel laterit 2.875.124,06 ton dengan kadar rata - rata Ni : 1,68, Fe : 32,18 dan MgO : 16,36 (asumsi berat jenis zona limonit dan zona saprolit = 1,6 ton/m3).

Penelitian ini juga mengestimasi sumberdaya ekonomis berdasarkan nilai Cut Off Grade yang tersusun didalam skenario, untuk skenario 1 dengan asumsi nilai COG > 1,2 % dan berat jenis ore 1.6 gr/m3 menghasilkan sumberdaya volume ore 1.768.039 m3 sehingga tonnase ore 2.828.862,61 ton dengan kadar rata-rata Ni 1,95 %, Fe 23,35 % dan MgO 21,23 % dan volume waste 336.795,78 m3. Sedangkan Skenario 2 dengan asumsi nilai COG > 1,8 % dan berat jenis ore 1.6 ton/m3 menghasilkan sumberdaya volume ore 1.171.253,625 m3 sehingga tonnase ore 1.874.005,80 ton dengan kadar rata-rata Ni 2,09 %, Fe 20,28 % dan MgO 23,13 % dan volume waste 210.562,27 m3 (Ore = Limonit + Saprolit).

Deskripsi Alternatif :

Modelling is an important step that helps people describing the geological condition and geometry characteristics of a deposit. After finishing the exploration activities, a 3-D ore body modelling is needed to design and to analyze the deposit in order to determine wich mine methode that will be applied.

The calculation methode of resource/reserve consists of two methods, they are : conventional and non conventional methode. A methode that is used in this research is the conventional method with inverse distance power approach. Along with the growth of technology, a resource estimation with conventional method can be computerize modified by using available software without changing the calculation philosophy so that the work will be done more quickly.

Modeling is done based on a model concept where resources divided in to small blocks to help making detail grade estimation. The dimension of the blocks is: X x Y x Z = -½ space distance between each drill point (1/2 x 25 m), Y = -½ space distance between each drill point (1/2 x 25 m) dan Z = 2 m (Based on Convention).

The result of the statistic analysis shows that Mean, Skewness and Variance of Ni, Fe and MgO in north block and south block is similar with the conclusion that the distribution of the grade value in both blocks is same in their characteristics. Besides, the result of the statistical analysis of Scatter Plot shows the existence of two different data population and shows the Lateritic phase from the correlation interpretation of the grade variable Ni to Fe and Ni to MgO.

The result of this research is the total estimated resource of lateritic nickel based distribution horizon which is called Limonite Zone is approximately 497.127,06 (total tonnage) with the average grades of: Ni : 1,29 % ; Fe : 44,35 %; MgO : 9,39 %, In the other side, the total estimated resource in the Saprolite Zone is approximately 2.377.997,01 (total tonnage) with the average grades of Ni : 2,08 % ; Fe : 20,011 % ; MgO : 23,32 %. Than, the amount of lateritic nickel resource is 2.875.124,06 tonnage with the average grades of : Ni : 1,68, Fe : 32,18 and MgO : 16,36 (with assumption that the density of limonite zone and saprolite zone is 1,6 ton/m3).

This research also estimating the economic resources based on Cut Off Grade compiled in the scenario. In the first scenario, the assumed value of COG >1,2 % and assumed value of density ore is 1.6 ton/m3. The result volume of ore resource estimation is 1.768.039 m3 than the tonnage of ore was 2.828.862,61 ton with average grade of: Ni 1,95%, Fe 23,35% and MgO 21,23% and with the waste volume of 336.795,78 m3. Than, for the 2nd scenario with the assumed value of COG > 1,8 % and the assumed value of density ore is 1.6 ton/m3. The result volume of ore estimation is 1.171.253,625 m3 than the tonnage of ore is 1.874.005,80 ton with average grades of Ni 2,09 %, Fe 20,28 % dan MgO 23,13% and with the waste volume of 210.562,27 m3 (Ore = Limonite + Saprolite).

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Department of Geology
Nama KontakDrs. Mahmudin, SIP.
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOdigilib@lib.itb.ac.id