Path: TopS1-Final ProjectGeodesy and Geomatics Engineering-FITB2012

VERIFIKASI POSISI PIPA BAWAH LAUT PASCA PEMASANGAN (STUDI KASUS : BALIKPAPAN PLATFORM)

Undergraduate Theses from JBPTITBPP / 2017-10-09 10:51:08
Oleh : MUHAMMAD FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.Eng, PhD , S1 - Department of Geodetic Engineering
Dibuat : 2012-08, dengan 7 file

Keyword : Pipa Bawah Laut, Verifikasi, Multibeam Echosounder

Pipa bawah laut memerlukan desain awal yang sempurna dan proses instalasi yang teliti agar keseluruhan proses pembangunan pipa berhasil dan cost effective. Pembangunan pipa dibagi menjadi tiga tahapan, yaitu survei pra-pemasangan pipa bawah laut, pemasangan pipa bawah laut, dan survei pasca-pemasangan pipa bawah laut.








Verifikasi pipa bawah laut termasuk ke dalam kegiatan survei pasca-pemasangan dengan tujuan utama untuk mendapatkan posisi absolute dari pipa bawah laut tersebut. Penulis melakukan pengolahan data multibeam echosounder dengan menggunakan perangkat lunak QINSy. Selain itu, dilakukan juga analisis mengenai perbandingan posisi dari rencana pipa dengan posisi pipa hasil dari pengolahan data multibeam echosounder. Hasil analisis kemudian akan digunakan untuk pertimbangan dalam perencanaan pembangunan pipa pada wilayah yang sama.








Hasil pengolahan data multibeam echosounder menunjukkan terdapat perbedaan posisi perencanaan dan posisi aktual dari pipa. Perbedaan posisi tersebut terjadi pada bagian lengkungan dari pipa dengan perbedaan sejauh 5.4 m. Perbedaan yang terdapat pada lengkungan dari pipa ini masih dapat diterima, dikarenakan tidak ada posisi pipa yang free-span dan juga tidak mengakibatkan pipa ini berbenturan dengan pipa yang lainnya.

Deskripsi Alternatif :

Subsea pipeline requires a perfect design and a meticulous installation process therefor the entire pipeline construction process will be successful and cost-effectively. Construction of the subsea pipeline is divided into three stages; pre-lay survey, subsea pipeline installation, and as-laid survey.








Verification of subsea pipeline is a part of as-laid survey, with the main objective to get the final position of the installed subsea pipeline. In this thesis, the writer done a multibeam echosounder data processing using the QINSy software for acquiring the final position coordinate. In addition, there is also performed an analysis of the comparative position of the subsea pipeline route plan to the position of the pipe results from multibeam echosounder data processing. The analysis will then be used for consideration in planning for the construction of the subsea pipeline in the same area.








Multibeam echosounder data processing results showed that there are differences in the position of planning and the actual position of the subsea pipeline. Difference occurs in the position of the winding pipe with a difference as far as 5.4 m. The differences found in the winding pipe are still in acceptable condition, because there is no free-span pipe and this pipe does not result in conflict with the other existing subsea pipeline.

Beri Komentar ?#(0) | Bookmark

PropertiNilai Properti
ID PublisherJBPTITBPP
OrganisasiS1 - Department of Geodetic Engineering
Nama KontakUPT Perpustakaan ITB
AlamatJl. Ganesha 10
KotaBandung
DaerahJawa Barat
NegaraIndonesia
Telepon62-22-2509118, 2500089
Fax62-22-2500089
E-mail Administratordigilib@lib.itb.ac.id
E-mail CKOinfo@lib.itb.ac.id

Print ...

Kontributor...

  • Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.Eng, PhD, Editor: Dila Farida Nurfajriah

Download...